16 Removal of existing girders track with contractors own arrangements<br />
as per requirement and direction of Engineer at site. The rate shall<br />
be inclusive of all labours and incidental charges.<br />
Schedule "B"<br />
1 Overall Percentage above/below over the rates under DNR Division<br />
of the E. Railway Engg.Deptt. Schedule of L& M rates 1996 edition<br />
with all upto date correction slip there to for item not included in the<br />
item above of the Sch. 'A' Detail as per annexure given Below:-<br />
2 Each/<br />
Span<br />
4952 %<br />
above/below<br />
ANEEXURE (to Schedule "B")<br />
No Description of work Qty Unit Rate Amt<br />
1 Dismantling brick works (XV-6-192) 75 per m3 66.02 4952<br />
NB The quantities shown in above schedule are approximate and are a guide to give the tenderer(s) idea of quantum of work<br />
involved. The Railway reserves he right to increase/ decrease and or delete any of the quantities given above and no extra rate<br />
will be allowed on this account.<br />
SCHEDULE 'C'<br />
1 Supply of cement & reinforcing and structual steel to the site of work to the extent required by the Rly. For use in the work . Rates<br />
quoted shall include all coats, transporation, storing and all other incidental charges.<br />
a Cement OPC 43/53 grade confirming to IS 8112-1987/IS 11269 60 MT<br />
b<br />
Reinforcing steel Confirming to IS 1787-1985 to Fe415of any<br />
diameter.<br />
16 MT<br />
NOTES:<br />
1 Materials, as per requirements, shall be brought to site and kept under contractors custody at their own cost and risk, without any<br />
damage like setting of cement/rusting of steel etc.<br />
2 Payment for the materials, will be made through running and final bills, as per actual consumption in the work and shatever<br />
wastage that takes place I.e. out pieces, empty cement bags, etc. will be the contractors property and the same shall be removed<br />
from the site at his own cost.<br />
3 The materials are to be procured from the main producers/authorised dealers/authorised stock yards and shall conform to latest IS<br />
(BIS) specification.<br />
4 Cement bags preferably in papers bags should bear following information in legible marking:<br />
(I) Manufacturer's Name :<br />
(II) Regd. Trade mark of Manufacturer, if any :<br />
(iii) Type of Cement :<br />
(iv) Wt. Of each bag in KG or No, of bags/Tone:<br />
(v) Date of manufacture, generally marked as well as of the month / year of manufacture:<br />
5 Manufacturer's test certificate conforming to lates IS (RIS) specification should also be produced by Contractor:<br />
6 The Railway reserves the right to take samples of materials supplied by the contractor and to get the same tested in reputed<br />
laboratories and the results thereof shall be binding on the contractor. The testing frequency shall be decided by as Engineer- in<br />
charge as when required.<br />
Witness:<br />
1<br />
Signature of Tenderer(s)<br />
2 Date: