22.12.2013 Views

EAST CENTRAL RAILWAY - Indian Railways

EAST CENTRAL RAILWAY - Indian Railways

EAST CENTRAL RAILWAY - Indian Railways

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SCHEDULE:- Re-building of Br no.47(1x3.05m arch relieved by girder) on M/L section of<br />

DNR division<br />

SCHEDULE 'A'<br />

IT DESCRIPTION OF WORK<br />

NO.<br />

QTY. UNIT<br />

1 Manufacturing and providing sleeper cribs under the Track as per<br />

CE’s Drg.No.C-191-96/C-270-98 or as per requirement at site of<br />

approx height 165cm or as required at site to suit the local condition<br />

for providing service Girders to facilitate earth work in excavation and<br />

dismantling of existing bridge structure. The contractor shall have to<br />

maintain the sleeper cribs in good condition till completion of work.<br />

Only sleepers and Tie-bars and Tie Rods as required will be issued<br />

by the Railway free of cost. All materials which will be supplied by<br />

the Railway such as C.C crib, sleepers rail etc.will be issued either<br />

from Sr.SE/Br./DNR’s store or any other store of DNR Divn. Small<br />

fittings such as nails, nuts and bolts, washers, clamps to be supplied<br />

by the contractor at his own cost. The work to be done within a Traffic<br />

block period of 2.5 hrs.or as may be available as per instruction of<br />

Engineer at site complete in all respect.<br />

4 Each<br />

2 Providing 45’ long service Girder with the help of crane over<br />

previously made sleepers Cribs supports as per requirement and as<br />

per direction of Engineer at site. The rate shall be inclusive of all<br />

labours except these associated with crane and crane working and<br />

tools including supplying and providing small clips, nut bolts if found<br />

deficient in the service Girders,placing of Girders at required level<br />

and in proper alignment including provision of hard wood packing (as<br />

per drawing) above existing pier to support the service Girders<br />

,dismantling of existing Track and making fish plated joints, removal<br />

of ballast and formation soil to accommodate service Girders etc.<br />

under supervision of PWI/BRI/IOW complete in all respects. The<br />

work will be done within a Traffic block of about 2.5 hrs (approx) or as<br />

may be available. Only crane and service Girders will be made<br />

available by the Railway free of cost.<br />

2 Each<br />

RATE in<br />

Fig.<br />

Words<br />

3 Earth work is excavation in bridge foundation of box, piers, wing wall,<br />

return wall etc. connected with the bridge in all classes of soil (except<br />

rock requiring blasting) including dewater, bailing out of water,<br />

diversion of stream to facilitate earth work with all labour & material,<br />

tools and plants, lead, lift, all other incidental charge. The rate also<br />

includes refilling of foundation trench in layer of 30 cm watering and<br />

ramming after concreting. The extra earth should be deposited at<br />

suitable places as directed by the Engineer-in-charge at site.<br />

230 per m3<br />

4 Plain cement concrete M 15 (1:2:4) with cement, coarse sand and<br />

well graded stone chips of 20 mm nominal size cast in position duly<br />

compacted by mechanical vibrator including providing shuttering and<br />

centering of approved quality and pattern where required, curing<br />

properly removal of shuttering and staging including supply of all<br />

labours and materials except cement for which payment will be made<br />

separately, tools & plants all lead & lift complete in every respect. All<br />

material & tools & plants will conform to relevant B.I.S. specifications<br />

and work will be done as per IRC Br. code / BIS specification.<br />

20 per m3<br />

5 Plain cement concrete M-25/M-20 control conc. With cement coarse<br />

sand and well-graded stone chips of 20 mm nominal size cast in<br />

position duly compacted by mechanical vibrator including providing<br />

shuttering and centering of approved quality and patern where<br />

required, curing properly removal of shuttering and staging including<br />

supply of all labours and materials except cement for which payment<br />

will be made separately , tools & plants all lead & lift complete in<br />

every respect. All materials & tools & plants will confirm to relevant<br />

B.I.S. specifications and work will be done as per IRC Br. Code/BIS<br />

specifn<br />

18 per m3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!