SCHEDULE:- Re-building of Br no.47(1x3.05m arch relieved by girder) on M/L section of<br />
DNR division<br />
SCHEDULE 'A'<br />
IT DESCRIPTION OF WORK<br />
NO.<br />
QTY. UNIT<br />
1 Manufacturing and providing sleeper cribs under the Track as per<br />
CE’s Drg.No.C-191-96/C-270-98 or as per requirement at site of<br />
approx height 165cm or as required at site to suit the local condition<br />
for providing service Girders to facilitate earth work in excavation and<br />
dismantling of existing bridge structure. The contractor shall have to<br />
maintain the sleeper cribs in good condition till completion of work.<br />
Only sleepers and Tie-bars and Tie Rods as required will be issued<br />
by the Railway free of cost. All materials which will be supplied by<br />
the Railway such as C.C crib, sleepers rail etc.will be issued either<br />
from Sr.SE/Br./DNR’s store or any other store of DNR Divn. Small<br />
fittings such as nails, nuts and bolts, washers, clamps to be supplied<br />
by the contractor at his own cost. The work to be done within a Traffic<br />
block period of 2.5 hrs.or as may be available as per instruction of<br />
Engineer at site complete in all respect.<br />
4 Each<br />
2 Providing 45’ long service Girder with the help of crane over<br />
previously made sleepers Cribs supports as per requirement and as<br />
per direction of Engineer at site. The rate shall be inclusive of all<br />
labours except these associated with crane and crane working and<br />
tools including supplying and providing small clips, nut bolts if found<br />
deficient in the service Girders,placing of Girders at required level<br />
and in proper alignment including provision of hard wood packing (as<br />
per drawing) above existing pier to support the service Girders<br />
,dismantling of existing Track and making fish plated joints, removal<br />
of ballast and formation soil to accommodate service Girders etc.<br />
under supervision of PWI/BRI/IOW complete in all respects. The<br />
work will be done within a Traffic block of about 2.5 hrs (approx) or as<br />
may be available. Only crane and service Girders will be made<br />
available by the Railway free of cost.<br />
2 Each<br />
RATE in<br />
Fig.<br />
Words<br />
3 Earth work is excavation in bridge foundation of box, piers, wing wall,<br />
return wall etc. connected with the bridge in all classes of soil (except<br />
rock requiring blasting) including dewater, bailing out of water,<br />
diversion of stream to facilitate earth work with all labour & material,<br />
tools and plants, lead, lift, all other incidental charge. The rate also<br />
includes refilling of foundation trench in layer of 30 cm watering and<br />
ramming after concreting. The extra earth should be deposited at<br />
suitable places as directed by the Engineer-in-charge at site.<br />
230 per m3<br />
4 Plain cement concrete M 15 (1:2:4) with cement, coarse sand and<br />
well graded stone chips of 20 mm nominal size cast in position duly<br />
compacted by mechanical vibrator including providing shuttering and<br />
centering of approved quality and pattern where required, curing<br />
properly removal of shuttering and staging including supply of all<br />
labours and materials except cement for which payment will be made<br />
separately, tools & plants all lead & lift complete in every respect. All<br />
material & tools & plants will conform to relevant B.I.S. specifications<br />
and work will be done as per IRC Br. code / BIS specification.<br />
20 per m3<br />
5 Plain cement concrete M-25/M-20 control conc. With cement coarse<br />
sand and well-graded stone chips of 20 mm nominal size cast in<br />
position duly compacted by mechanical vibrator including providing<br />
shuttering and centering of approved quality and patern where<br />
required, curing properly removal of shuttering and staging including<br />
supply of all labours and materials except cement for which payment<br />
will be made separately , tools & plants all lead & lift complete in<br />
every respect. All materials & tools & plants will confirm to relevant<br />
B.I.S. specifications and work will be done as per IRC Br. Code/BIS<br />
specifn<br />
18 per m3