EAST CENTRAL RAILWAY SCHEDULE OF ITEMS Tender schedule for the work of Open tender Rebuilding of Br.No.47 (1x3.05 m Arch) relieved by girder) with 3.50m RCC Box on main line. CONDITIONS : Unless specifically provided for in any item below, the rates quoted for items for this schedule shall includes the cost of :- 1. Supply of old materials of approved quality as per specification of GCC tender documents and relevant I.S. specifications as applicable, brought to site of work. All materials supplied by Contractors should be new and not second hand/used. 2. All transport, lead, lift, ascent, descent, crossing tracks, obstructions, observing traffic regulations etc. for bringing materials, equipment, tools and plants, labour to the site of work as required to complete the work in all respects. 3. All taxes, state, Central or Local. 4. All labour, skilled, unskilled, supervisory, specialized as required. 5. All temporary arrangements like shuttering, scaffolding, centering, staging, supports, shoring, making templates etc. (without affecting the safety and working of existing track) etc. inclusive of all labour & materials required for providing, erection, use dismantling of such arrangement after completion of parmanent work and removing work and removing from site including submission of detailed drawings/designs for such temporary arrangements and getting the same approved by Railway, if and as required by the Engineer. 6. All such equipment, tools, jacks, plant and machinery etc. as may be required for executing the work in a modern and workmen like manner as per specifications, inclusive of cost of such equipment, bringing to site, labour & full for operation, maintenance etc. 7. All works being executed as per specifications of these tender documents, GCC & S.S. relevant is/IRS Books as applicable to best quality and finish. 8. Executing the work as per items of this schedule, complete in all respects by inputs and any other incidental charges other than these listed in these notes, as may be necessary. All the works shall be carried out in accordance with the approved design and drawings. 9. Carrying out the work at any height/depth, above/below the ground at any location at the work site. 10. Removing dismantled materials belonging to Railway with safety sorting out the dismantled materials in useable (section-wise) & scrap portions & stacking the same separately at site(s) shown by Engineer within 300 meters of the end of the bridge, nearest to the stacking area so earmarked. The material so stacked shall be finally disposed off as directed by the Engg. For which payment shall be made as per accepted rate of item against E. Railway Engg. Department schedule of Labour & Materials Rates 1996. 11. Construction & maintenance of all service roads required by the Contractor for execution of the works. 12. Taking all safety precautions for and keeping the existing Bridge structure safe & pass from obstruction for uninterrupt running of trains. 13. Cutting, bending, shaping, binding & placing of steel reinforcement bars with cost of spacers, cover blocks, binding wire of 16G-Galvanised, for RCC items. 14. Mixing, compaction, vibration of reinforced/plain concrete of all mixes by mechanical means i.e. by mixers and vibrators of suitable design and adequate capacity. 15. Only steel shuttering shall be used for old reinforced and plan concrete works. 16. For the schedule items pertaining to E. Rly. Engineering Deptt. Schedule of Labour & Materials Rates, 1996 the following notes also shall be applicable. i) Only percentage increase or decrease is to be quoted. ii) It shall be the contractor’s responsibility to hand over vacant and unoccupied possession of the completed works to Engineer’s authorised representative.

iii) The work shall be executed by Contractor under this schedule on the basis of work orders which will be issued by the Railway. iv) (a) All the materials/conditions for works under this schedule shall be as given at the top of each Chapter in L&M schedule 1996 with the following modifications: - All the water to be used in works shall be of appropriate quality and shall be supplied by the contractor at site of requirement. Railway shall not supply the same. (b) The materials to be supplied by Rly. shall be supplied by the Rly. in IOW’s stores at ___________________ etc. from where the contractor shall transport the same to site without any separate payment for lead, loading, unloading. (c) Railway shall not supply and equipment, tools, plant and machinery 17. Besides the foregoing notes, various other stipulations conditions and specifications mentioned in these tender papers viz. instructions to Tenderers and conditions of tender, special condition and specification of contract, Description of work in schedule of items, General condition, General conditions of contract and standard specifications (followed by Work Hand Book Part 1 & 2 GCC Feb, 2001) and schedule of labour and material rates 1996 (with upto-date amendments thereto) shall also be applicable. 18. The contractor shall take adequate precautions at his own cost for sale keeping of his machines, plants, materials as well as materials issued by Railway to him by Flood/Fire/Theft etc. or any other natural calamities. Full signature of Tender(s)

<strong>EAST</strong> <strong>CENTRAL</strong> <strong>RAILWAY</strong><br />

SCHEDULE OF ITEMS<br />

Tender schedule for the work of Open tender Rebuilding of Br.No.47 (1x3.05 m Arch) relieved by girder) with 3.50m<br />

RCC Box on main line.<br />

CONDITIONS :<br />

Unless specifically provided for in any item below, the rates quoted for items for this schedule<br />

shall includes the cost of :-<br />

1. Supply of old materials of approved quality as per specification of GCC tender documents and relevant I.S.<br />

specifications as applicable, brought to site of work. All materials supplied by Contractors should be new<br />

and not second hand/used.<br />

2. All transport, lead, lift, ascent, descent, crossing tracks, obstructions, observing traffic regulations etc. for<br />

bringing materials, equipment, tools and plants, labour to the site of work as required to complete the work<br />

in all respects.<br />

3. All taxes, state, Central or Local.<br />

4. All labour, skilled, unskilled, supervisory, specialized as required.<br />

5. All temporary arrangements like shuttering, scaffolding, centering, staging, supports, shoring, making<br />

templates etc. (without affecting the safety and working of existing track) etc. inclusive of all labour &<br />

materials required for providing, erection, use dismantling of such arrangement after completion of<br />

parmanent work and removing work and removing from site including submission of detailed<br />

drawings/designs for such temporary arrangements and getting the same approved by Railway, if and as<br />

required by the Engineer.<br />

6. All such equipment, tools, jacks, plant and machinery etc. as may be required for executing the work in a<br />

modern and workmen like manner as per specifications, inclusive of cost of such equipment, bringing to<br />

site, labour & full for operation, maintenance etc.<br />

7. All works being executed as per specifications of these tender documents, GCC & S.S. relevant is/IRS<br />

Books as applicable to best quality and finish.<br />

8. Executing the work as per items of this schedule, complete in all respects by inputs and any other<br />

incidental charges other than these listed in these notes, as may be necessary. All the works shall be carried<br />

out in accordance with the approved design and drawings.<br />

9. Carrying out the work at any height/depth, above/below the ground at any location at the work site.<br />

10. Removing dismantled materials belonging to Railway with safety sorting out the dismantled materials in<br />

useable (section-wise) & scrap portions & stacking the same separately at site(s) shown by Engineer within<br />

300 meters of the end of the bridge, nearest to the stacking area so earmarked. The material so stacked<br />

shall be finally disposed off as directed by the Engg. For which payment shall be made as per accepted rate<br />

of item against E. Railway Engg. Department schedule of Labour & Materials Rates 1996.<br />

11. Construction & maintenance of all service roads required by the Contractor for execution of the works.<br />

12. Taking all safety precautions for and keeping the existing Bridge structure safe & pass from obstruction for<br />

uninterrupt running of trains.<br />

13. Cutting, bending, shaping, binding & placing of steel reinforcement bars with cost of spacers, cover<br />

blocks, binding wire of 16G-Galvanised, for RCC items.<br />

14. Mixing, compaction, vibration of reinforced/plain concrete of all mixes by mechanical means i.e. by<br />

mixers and vibrators of suitable design and adequate capacity.<br />

15. Only steel shuttering shall be used for old reinforced and plan concrete works.<br />

16. For the schedule items pertaining to E. Rly. Engineering Deptt. Schedule of Labour & Materials Rates,<br />

1996 the following notes also shall be applicable.<br />

i) Only percentage increase or decrease is to be quoted.<br />

ii) It shall be the contractor’s responsibility to hand over vacant and unoccupied possession<br />

of the completed works to Engineer’s authorised representative.