Page -1of 36<br />

<strong>EAST</strong> <strong>CENTRAL</strong> <strong>RAILWAY</strong><br />

No. W.584/2005-06/Open/07, 08& 09 ::: Dhanbad, dt 22 -8-2005<br />

CORRIGENDUM<br />

It is further to notify that the address of website, furnished in the tender Notice<br />

No. W.584/05-06/Open/07 dated 03.8.2005 , W.584/05-06/Open/08 dated 03.8.2005 &<br />

w.584/2005-06/Open / 09 dated 03.8.2005 now shall be read as (1) http://<br />

www.indianrail. gov.in/tender.html and (2) http:// www. ecr. indianrail.gov.in instead<br />

of http// www.indianrailways.gov.in and all the tender documents against the above<br />

notices are available in the website (1) http:// www.indianrail. gov.in/tender.html and (2)<br />

http://www.ecr.indianrail.gov.in.<br />

All others details, terms and conditions exist in the tender Notice No. W.584/ 2005-<br />

06/Open/07 dt.03.8.2005 , W.584/2005-06/Open/08 dt.03.8.2005 & W.584/2005-<br />

06/Open/09 dated 03.8.2005 will remain unchanged and unaltered.<br />

Sd/-<br />

(S. Dubey)<br />

Divisional Engineer(HQ)<br />

For Divisional Railway Manager,<br />

East Central Rly./Dhanbad.


Page -2of 36<br />

<strong>EAST</strong> <strong>CENTRAL</strong> <strong>RAILWAY</strong><br />

TENDER NOTICE No. W.584/2005-06/Open/07 : : Dhanbad, dated 03-8-2005<br />

Sealed Open Tender are invited for the under mentioned work :<br />

Sl.<br />

No.<br />

Name of work<br />

1. Supply of 1,00,000 cum 50mm<br />

size machine crushed track<br />

ballast and loading the same in<br />

to any type of Railway wagons<br />

F.O.R. Pakur for E.C. Railway.<br />

2. Dhanbad: Coaching complex 24<br />

coaches length pit with washable<br />

platform on Line no. 4 and<br />

extension of coaching sick line<br />

with additional one coach length<br />

pit under Asstt. Engineer(2),<br />

E.C. Railway, Dhanbad.<br />

Approx. Cost..<br />

Rs. 3,62,11,000/-<br />

Rs. 1,29,83,519/-<br />

Date of<br />

completion<br />

12 (Twelve)<br />

Months.<br />

06(Six)<br />

Months.<br />

Earnest<br />

money (Rs.)<br />

Cost of<br />

Tender<br />

paper.<br />

(Rs.)<br />

1,50,000/- 3000/-<br />

50,000/- 2000/-<br />

Tender forms are available from the office of the Divisional Railway Manager, East Central<br />

Railway, Dhanbad ( Tender and Bill section), Asst. Engineer, E.C. Railway, Gujhandi and<br />

Asstt.Engineer, E.C. Railway, Barkakana after submitting the money receipt which may be obtained<br />

by depositing required amount shown against each tender towards the cost of Tender papers with the<br />

Sr. Divisional Cashier, E. C. Railway ,Dhanbad and Booking counter of Dhanbad, Gujhandi,<br />

Koderma, Barkakana, Daltonganj and Chopan between 12-00 hours to 16-00 hours on any working<br />

day on and from 01.9.2005 to 14.9.2005.<br />

The sale of tender form will be closed at 16-00 hours on 14.9.2005. Tender will be received in<br />

the prescribed tender box placed in the office of the Divisional Railway Manager, East Central<br />

Railway, Dhanbad, office of the Asstt. Engineer, East Central Railway, Gujhandi and the office of<br />

the Addl. Divisional Railway Manager , East Central Railway, Barkakana on and from 01.9.2005 and<br />

up to 15-00 hours on 15.9.2005 and the tender will be opened on next day 16.9.2005 at 11-30 hours in<br />

presence of the tenderers so present at the time of the opening of the tender.<br />

If the office is closed on the stipulated date and time due to some unaccounted holiday or<br />

bandh etc. the tender will be received and opened on the next working day at the same time.<br />

The tender must be submitted along with prescribed amount of Earnest Money as<br />

mentioned above in acceptable form as mentioned in the tender documents. Tender received<br />

without the prescribed amount of Earnest Money, is liable to be summarily rejected . The tender<br />

form is not transferable . Earnest Money should be drawn in favour of FA & CAO/ E.C.<br />

Railway, Hajipur, Payable at Patna.<br />

Contd…….P/2


Page -3 of 36<br />

ELIGIBILITY CRITERIA:<br />

1. Revenue/ Banker’s solvency<br />

certificate.<br />

2. Should have completed in the last<br />

three financial years (i.e. current year<br />

and three previous financial years).<br />

3. Total contract amount received<br />

during the last three(03) financial<br />

years and in the current financial<br />

year.<br />

4. Lease/License for Mining of ballast<br />

from State Govt.<br />

40% of Advertised Tender Value of work.<br />

At least one similar work, for a minimum value of 35% of<br />

Advertised Tender value of work.<br />

Should be minimum of 150% of Advertised Tender value.<br />

Tender committee would satisfy themselves about the<br />

authenticity of the certificates produced by the tenderer(s) to<br />

this effect which may be an attested certificate from the<br />

employer/client, audited balance sheet duly certified by the<br />

Chartered Accountant etc. The details about the certificate<br />

be accepted in regard to the turnover.<br />

The tenderer should produce authentic documents in proof<br />

of having valid license/lease for mining of ballast from State<br />

Govt. authorities or a Memorandum of Understanding<br />

between the leasee and the tenderer while submitting their<br />

tenders. This should be submitted along with the tender<br />

documents, in absence of which, tender will not be considered<br />

and will be summarily rejected.<br />

(A) List of work completed in the last three financial years giving description of work, organisation for<br />

whom executed, approximate value of contract, at the time of award and date of scheduled<br />

completion of work. Date of actual start, actual completion and final value of contract should also be<br />

given.<br />

(B) List of work on band indicating description of work, contract value, approximate value of balance<br />

work yet to be done, date of award of work and payment received till date from the same contract.<br />

NOTE : (1) For (A) and (B) above related documents/certificates from the organizations with whom they<br />

worked /are working should be enclosed.<br />

(2) Certificate from Private individuals for whom such work are executed/being executed shall<br />

not be accepted.<br />

N.B : 1) The tender Notice also available on website http:// www.indianrailways.gov.in .<br />

2) Tender documents can also be downloaded from the above noted websites w.e.f 01.9.2005. The facility is<br />

available free of cost. However, Demand Draft for the amount , as mentioned against each of the tender<br />

towards cost of tender papers, in favour of FA & CAO /E.C.Rly./ Hajipur, payable at Patna, will have to be<br />

enclosed with the tender in addition to the earnest money. In case tender documents downloaded from<br />

Internet websites, if tender is not accompanied with valid demand draft towards the cost of tender documents<br />

or if any addition / alteration found in the tender documents, the tender will be summarily rejected.<br />

Sd/-<br />

(A.K . Rai)<br />

Sr. Divisional Engineer(2)<br />

for Divisional Railway Manager,<br />

East Central Railway, Dhanbad.


East Central Railway<br />

( Dhanbad Division )<br />

Page -4of 36<br />

1. Tender Notice No. : W.584/2005-06/Open/07 dated 03.8.2005<br />

Tender Number<br />

: 07/01 of 2005-06…………………………………………..<br />

3. Name of the work : … Supply of 1,00,000 cum 50mm size machine crushed track<br />

ballast and loading the same in to any type of Railway wagons<br />

F.O.R. Pakur for E.C. Railway<br />

4. Issued to (Full Name : ………………………………………………………………….<br />

and address of the<br />

Tenderer.<br />

………………………………………………………………….<br />

5. Money Receipt Number : …………………………….. Dated ……………………….<br />

6. Amount : …………………………<br />

7. Issued by : ……………………………………………………………….<br />

Dated : ………………………<br />

Name and Signature of the<br />

Dealing Clerk selling the Tender<br />

Form<br />

: …………………………<br />

Date : …………………………………………………….<br />

Designation : …………………………………………….<br />

………


Page -5of 36<br />

<strong>EAST</strong> <strong>CENTRAL</strong> <strong>RAILWAY</strong><br />

TENDER FORM:<br />

To,<br />

The President of India,<br />

Acting through : The Principal Chief Engineer, E.C.Railway, Hajipur.<br />

The Sr. Divl. Engineer(Co-Ordn.), E.C.Rly., Dhanbad ..<br />

Tender Notice No. ___ W.584/2005-06/Open/07 dated 03 . 8. 2005<br />

Tender Number : _____07/01 of 2005-06<br />

Name of work :___ Supply of 1,00,000 cum 50mm size machine crushed track ballast and<br />

loading the same in to any type of Railway wagons F.O.R. Pakur for E.C.<br />

Railway.<br />

I/We ___________________________________________________ have read the various<br />

conditions to tender attached hereto and agree to abide by the said conditions. I/We also agree to keep<br />

this tender open for acceptance for a period of 120 days from the date fixed for opening of the same and<br />

in default hereof, I/We will be liable for forfeiture of my / our “Earnest Money/Security deposit”. I/We<br />

offer to do the work for … Supply of 1,00,000 cum 50mm size machine crushed track ballast and<br />

loading the same in to any type of Railway wagons F.O.R. Pakur for E.C. Railway at the rate<br />

quoted in the attached schedule and hereby bind myself / ourselves to complete the work in all respects<br />

within 12(Twelve) months from the date of issue of letter of acceptance of the tender. I/We also hereby<br />

agree to abide by the General Conditions of Contract and Works Hand Book Part-I & II - 2001 edition<br />

and to carry out the works according to the Special Conditions of Contract and specifications for<br />

materials and works as laid down by Railway in the annexed Special conditions/specifications and the<br />

Eastern Railway’s Schedule of rates for Labour and Materials - 1996 edition with up to - date<br />

Correction Slips.<br />

2(A) A sum of Rs.1,50,000/- is herewith forwarded as Earnest Money. The full value of Earnest Money<br />

shall stand forfeited without prejudice to any other rights or remedies in case my / our Tender is<br />

accepted and if :-<br />

a) I/We do not execute the contract documents within seven days after receipt of notice issued by the<br />

<strong>Railways</strong> that such documents are ready for and.<br />

b) I/We do not commence the work within fifteen days after receipt of orders to the effect.<br />

3) Until formal a agreement is prepared and executed, acceptance of this tender shall constitute a<br />

binding contract between us and the <strong>Railways</strong> subject to modifications, as may be mutually agreed to<br />

between us and the Railway as indicated in the letter of acceptance of my/our offer for this work.<br />

Witness :<br />

1) ……………………….. Signature of Tenderer(s)<br />

Date<br />

Address of the Tenderer(s).<br />

2) ……………………….


Page -6of 36<br />

<strong>EAST</strong> <strong>CENTRAL</strong> <strong>RAILWAY</strong><br />

INSTRUCTIONS TO TENDERERS:<br />

Tender Notice No. __ W.584/2005-06/Open/07 _of 03.8.2005(Open)<br />

For Tender No. 07/01 of 2005-06<br />

1. The Tender is for Supply of 1,00,000 cum 50mm size machine crushed track ballast and<br />

loading the same in to any type of Railway wagons F.O.R. Pakur for E.C.<br />

Railway.<br />

2. The Tender must be submitted in sealed cover in the prescribed Form obtainable from the Office of<br />

the Divisional Railway Manager, East Central Railway, Dhanbad ( Engg. Department ), AEN/E. C.<br />

Railway/ BRKA & GJD on any working day between 12.00 hrs. and 15:00 hrs. on and from 01.9.2005<br />

to 14.9.2005, on production of Money receipt for Rs. 1,50,000/-only towards the cost of Tender Form<br />

either of the Sr. Divisional Cashier/Dhanbad or Booking Counter of DHN, BRKA, GJD, DTO, LTHR,<br />

KQR and CPU and should be deposited either in the Tender BOX kept in the office of the Divisional<br />

Railway Manager, E. C. Railway, Dhanbad ( Engg. Department ) or ADRM/BRKA or AEN/GJD before<br />

closing of tender box upto 15:00 hrs. on 15.9.2005. In no circumstances the amount paid for the cost of<br />

tender form will be refunded. The Tender Form is not transferable. The Tender will be opened on next<br />

day i.e. 11:30 hrs. on 16.9.2005 in the office of the Divisional Railway Manager, E. C. Railway ( Engg.<br />

Department ), DHN and rates will be read out in presence of such tenderers as are present. Prescribed<br />

tender forms must be submitted without which tender may not be considered.<br />

3. Tender Forms containing over written erased rates and rates not shown in “figure & words”, will be<br />

automatically rejected.<br />

4. Tenderers should specify their business names ( if any ) and should submit along with the Tender the<br />

constitution of their firms and the Power of Attorney, Partnership Deed without which the tender may<br />

not be considered.<br />

5. The cancellation of any document such as power of Attorney, partnership Deed etc. should be<br />

forthwith communicated by the Contractors to the Administration in writing, failing which the<br />

administration shall have no responsibility or liability for any action taken on the strength of the said<br />

documents.<br />

6. If called upon to do so, the Tenderers are required to state the proposed source of supply of ballast to<br />

be supplied by them.<br />

7. The Tender should be accompanied by a deposit made in cash with the Dy. Chief Account Officer (<br />

Cash & Pay )/Patna or in any of the following forms pledged in favour of the F.A. & C.A.O, E. C.<br />

Railway, Payable at Patna, for the amount so specified in the Tender Notice :<br />

(i) Deposit Receipts, Pay Orders, Demand Drafts. These forms of Earnest Money could be either of the<br />

State Bank of India or any of the Nationalized Banks. No confirmatory advise from the Reserve Bank of<br />

India will be necessary.<br />

(ii) Deposit Receipts executed by the Scheduled Banks ( other than the State Bank of India and the<br />

Nationalized Banks ) approved by the Reserved Bank of India for this purpose. The <strong>Railways</strong> will not,<br />

however, accept deposit receipts without getting in writing the concurrence of the Reserve Bank of<br />

India.<br />

Cond…


Page -7of 36<br />

8. Rs.1,50,000/- as Earnest Money for the due performance of the stipulation to keep the offer open for<br />

the period specified below. The Tenderers shall hold the offer open for a period of 120 days from<br />

the date fixed for opening the same. It being understood that the Tender Documents have been sold /<br />

issued to the Tenderer and the Tenderer/s is / are being permitted to tender in consideration of the<br />

stipulation on his part that after submitting his tender, he will not resile from his offer or modify the<br />

terms and conditions thereof in a manner not acceptable to the competent authority of the East Central<br />

Railway. Should the tenderer fail to observe or comply with the foregoing stipulations the aforesaid<br />

amount of Rs.1,50,000/- shall be liable to be forfeited to the Railway.<br />

9. The requisite Earnest Money Rs.1,50,000/- as per Clause – 8 of instructions to tenders should be<br />

submitted along with the Tender Document without which the tender will not be considered and rates<br />

quoted will not be read out.<br />

10. No cheque will be accepted from a tenderer towards Earnest Money even if it is guaranteed by the<br />

Bank. If any tenderer submits Cheque towards the Earnest Money, his tender will be treated as without<br />

Earnest Money.<br />

11. The acceptance of the Tender will rest with the General Manager / Principal Chief Engineer, Chief<br />

Track Engineer,E.C.Rly.,Hajipur, Divisional Railway Manager, Sr.Divisional Engineer(Co-Ordn.), East<br />

Central Railway,Dhanbad who reserve the right to divide the tender amongst more than one tenderer, if<br />

deemed necessary and also to reject any or all Tenderers received, without assigning any reason, and<br />

does not bind himself to accept the lowest or any other tender.<br />

12. Each page of the Tender Form should be signed by the Tenderer/s.<br />

13. Tenderers, which does not comply with the foregoing instructions, shall not be considered.<br />

14. The following books may be purchased by the Tenderers from Office of the Principal Chief<br />

Engineer, if they are not already in possession of the same.<br />

(i) Eastern Railway’s Hand Book of General Conditions of Contract – 2001 Edition, Price of<br />

Rs. 300/- only.<br />

15. ELIGIBILITY CRITERIA:<br />

1. Revenue / Bankers 40% of advertised tendered value.<br />

solvency certificate.<br />

2. Should have completed<br />

from start to finish, in the<br />

last three financial years<br />

(i.e. current year and three<br />

previous financial years).<br />

3. Total contract amount<br />

received during the last<br />

three(03) financial years<br />

and in the current financial<br />

year.<br />

At least one similar work, for a minimum value of 35% of<br />

Advertised Tender value of work.<br />

Should be minimum of 150% of Advertised Tender value. Tender<br />

committee would satisfy themselves about the authenticity of the<br />

certificates produced by the tenderer(s) to this effect which may be<br />

an attested certificate from the employer/client, audited balance<br />

sheet duly certified by the Chartered Accountant etc. The details<br />

about the certificate be accepted in regard to the turnover.


Page -8of 36<br />

4. Lease/ License for Mining<br />

of ballast from State Govt.<br />

The tenderer should produce authentic documents in proof of<br />

having valid license/ lease for mining of ballast from State Govt.<br />

authorities or a Memorandum of Understanding between the leasee<br />

and the tenderer while submitting their tenders. This should be<br />

submitted along with the tender documents, in absence of which,<br />

tender will not be considered and will be summarily rejected.<br />

(A) List of work completed in the last three financial years giving description of work, Organisation<br />

for whom executed, approximate value of contract, at the time of award and date of scheduled<br />

completion of work. Date of actual start, actual completion and final value of contract should<br />

also be given.<br />

(B) List of work on hand indicating description of work, contract value, approximate value of<br />

balance work yet to be done, date of award of work and payment received till date from the same<br />

contract.<br />

NOTE :<br />

(1) For (A) and (B) above related documents/certificates from the organizations with whom they<br />

worked /are working should be enclosed.<br />

(2) Certificate from Private individuals for whom such work are executed/being<br />

executed shall not be accepted.<br />

DA : 1. Form of Tender. 2. Conditions of Tender.<br />

3. Schedule of Items 4. Special Conditions .<br />

Signature of Tenderer/s<br />

Date :


Page -9of 36<br />

TENDER FORM ( SECOND STORY )<br />

CONDITION OF TENDER :<br />

1. General Conditions of Contract and specifications for materials and works are laid down in the<br />

Engineering Department’s Works Hand Book Pt-I & Pt. II - GCC – 2001 issue of Eastern<br />

Railway, Kolkata, which can be seen at the office of the Principal Chief Engineer , East Central<br />

Railway, Hajipur, Sr. DEN(Co-Ordn.)/E.C.Rly., Dhanbad or had on payment of Rs. 300/- only<br />

towards the cost of each. This book with up to date Correction Slips shall govern the work and<br />

shall be binding on the contractor.<br />

2. The tender/tenderers is/are to quote his/their rates with reference to each item & must tender for<br />

all the items shown in attached schedule. The quantities shown in the attached schedules, which<br />

are given as a guide, are approx, only and subject to variation according to the need of the<br />

Railway. The Railway accepts no responsibility for their accuracy. The Railway does not<br />

guarantee work under each item of the attached schedules.<br />

3. Tender containing erasures and alterations of the Tender Form/Documents are liable to be<br />

rejected. Any correction made by the tender(s) in his/their entries must be attested by him/them.<br />

4. The tender must be accompanied by a sum of Rs.1,50,000/- as Earnest Money to be deposited in<br />

cash either with the Dy. Chief Account Officer(Cash & Pay ), East Central Railway, Patna or in<br />

any of the forms as demanded in para – 7 of the Instructions to tenderers failing which the tender<br />

will not be considered. Tenders not accompanied by the aforesaid Earnest Money will under no<br />

circumstances, be entertained and will be summarily rejected without further reference to the<br />

tenderers. No reference to previous deposit of Earnest Money and security for adjustment against<br />

the present tender will be accepted, neither any request for recovery from any outstanding bills<br />

for Earnest Money against present tender will be entertained.<br />

5. The tenderer shall hold the offer open till such date and specified in the tender. It is understood<br />

that the tender documents have been sold to the tenderer’s and the tenderer(s) is/are being<br />

permitted to tender in consideration of the stipulation on his/their part that after submitting<br />

his/their render, he/they will not resile from his/their offer or modify the terms and conditions<br />

thereof in a manner not in acceptance with the Principal Chief Engineer , Hajipur of the East<br />

Central <strong>Railways</strong>. Should the tenderer fail to observe or comply with the foregoing stipulation<br />

the amount deposited as Security Money for the performance of the above stipulation shall be<br />

forfeited by the Railway. If the tender is accepted, the amount of Earnest Money will be held as<br />

security deposit for the due and faithful fulfillment of the contract. The Earnest Money of the<br />

unsuccessful tenderers will be returned to the unsuccessful tenderers. The Railway shall not be<br />

responsible for any loss or depreciation that may happen to the Earnest Money for the due<br />

performance of the stipulation to keep the offer open for the period specified in the tender<br />

documents or the Earnest Money while in their possession not liable to pay interest thereon.<br />

6. If called upon to do, the tenderer shall state the proposed source of supply of Materials, Tools &<br />

Plant, Equipment as required to be supplied and installed by him/them.


Page -10of 36<br />

7. If shall not be obligatory on the said authority to accept the lowest tender and no<br />

tenderer/tenderers shall demand any explanation for the cause of rejections of his/their tender.<br />

8. If the tenderer deliberately gives/tenderers deliberately give wrong information in his/their tender<br />

or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the<br />

right to reject such tender at any stage.<br />

9. If the tenderer expires after the submission of his tender or after the acceptance of his tender, the<br />

Railway shall deem such tender as cancelled. If a partner of a firm expired after the submission<br />

of their tender or after the acceptance of their tender the Railway shall deem such tender as<br />

cancelled unless the firm retains its character.<br />

10. The Earnest Money including the amount taken as security deposit for the due performance of<br />

the stipulation to keep the offer open till the date specified in the tender will be returned to the<br />

unsuccessful tenderers within a reasonable time. The Earnest Money deposited by the successful<br />

tenderer/tenderers will be retained towards the security deposit for the due and faithful<br />

fulfillment of the contract but shall be forfeited if the contractor fails/contractors fail to execute<br />

the agreement bond within 7 days of notification that such documents are ready or commence the<br />

work within 10 days after receipt of order to that effect.<br />

Tenderers must be enclosed in a sealed cover, supercribed Tender for “Supply of 1,00,000 cum<br />

50mm size machine crushed track ballast and loading the same in to any type of Railway<br />

wagons F.O.R. Pakur for E.C. Railway”.<br />

11. ”and must be deposited in the tender box allotted for the purpose as instructed in the tender<br />

notice.<br />

12. Non-compliance with any of the conditions set forth herein above is liable to resile in the tender<br />

being rejected.<br />

13. The authority for the acceptance of the Tender will rest with the General Manager/ Principal<br />

Chief Engineer , Chief Track Engineer, E.C.Rly., Hajipur, Divisional Railway Manager/Sr.<br />

Divisional Engineer(Co-Ordn.), East Central Railway, Dhanbad, who does not bind himself to<br />

accept the lowest or any other Tender nor does he undertake to assign reasons for declining to<br />

consider any particular tender or tenders.<br />

14. The successful Tenderer/Tenderers shall be required to execute an agreement with President of<br />

India acting through the General Manager/ Principal Chief Engineer Chief Track Engineer,<br />

E.C.Rly., Hajipur /Divisional Railway Manager/Sr.Divisional Engineer(Co-Ordn.), East Central<br />

Railway, Dhanbad for carrying out the work according to Engineering Department’s Hand Book<br />

of General Conditions of Contract 2001 issue with up-to-date correction Slips.<br />

15. The tendrerer shall keep the offer open for a minimum period of 120 days from the date of<br />

opening of the tender within which period the tenderer cannot withdraw his offer subject to the<br />

period being extended further if require by mutual agreement from time to time. Any<br />

contravention to the conditions will make the tenderer liable for forfeiture of his Security Deposit<br />

for the performance of the foregoing stipulation.


Page -11of 36<br />

16. Should a tenderer or a contractor being an individual on the list of approved contractors have a<br />

relative employee in Gazetted capacity in Engg. Deptt. of the E.C. Railway or in the case of<br />

partnership firm or company incorporated under the <strong>Indian</strong> Company Law should a partner or<br />

relative of the partner or share-holder or a relative of a share holder be employed in a gazetted<br />

capacity in the Engg. Deptt. of the E.C.Railway, the authority inviting tenders shall be informed<br />

of the fact at the time of submission of tenders , failing which the tender may be rejected or if<br />

such fact subsequently comes to light the contract may be rescinded in accordance with the<br />

provision in clause 62 of the general conditions of contract.<br />

17. Should a tenderer be a retired Engineer of the Gazetted rank or any other Gazetted Officer working<br />

before his retirement, whether in the Executive or Administrative capacity or whether holding a<br />

pensionable post or not, in the Engg. Department or any of the Railway owned and administrated<br />

by the President of India for the time being or should a tenderer being partnership firm having as<br />

one of its directors or should a tenderer being partnership firm having as one of its partners retired<br />

Engineer or a retired Gazetted Officer as aforesaid or should a tenderer being an incorporated<br />

company have any such retired Engineer or retired gazetted officer as one of its Directors or<br />

should a tenderer have in his employment any retired Engineer or retired Gazetted Officer as<br />

aforesaid, the full information as to the date of retirement of such Engineer or Gazetted Officer<br />

from the said service and in case where such Engineer or Officer had not retired from Government<br />

service at least two years prior to the date of the submission of the tender as to whether permission<br />

for taking such contract or if the contractor be a partnership firm or an incorporated company, to<br />

become a partner or director as the case may be or to take employment, under the contractor, has<br />

been obtained by the tenderer or the Engineer or Officer, as the case may be from the President of<br />

India or any officer duly authorized by him. In this behalf shall be clearly stated in writing at the<br />

time of submitting of the tender. The tenders without the information above referred to or a<br />

statements to the effect that no such retired Engineer or retired Gazetted Officer is also associated<br />

with the tenderer as the case may be/ shall be rejected.<br />

18. The contractor shall be fully responsible to pay all taxes including Sales Tax, Duties, Royalty, Cess<br />

etc. as will be levied on the sale of by-product by the Government or Public Body or Local<br />

Authority as referred to in clause ____________ of the special condition of contract. . In case, the<br />

Railway is obliged to pay any amount to the Government, Public Body or Local Authority in<br />

execution of the work or to incur any expenditure in connection with the sale of by-product due to<br />

contractor’s failure to fulfill his statutory obligation, the Railway shall be at liberty to recover from<br />

the contractor, the amount of expenditure so incurred by deducting it from security deposit and or<br />

any sum due by the Railway to the contractor whether under this contract or under other contracts.<br />

The decision of the Railway regarding the amount actually recoverable from the contractor as<br />

stated above shall be final and binding on the contractor.<br />

19. The tenderer shall clearly specify whether the tender is submitted on his own or on behalf of a<br />

partnership concern. If the tender is submitted on behalf of a partnership concern, he should submit<br />

the certified copy of partnership deed along with the tender and authorization to sign the tender<br />

documents on behalf of partnership firm. If these documents are not enclosed alongwith tender<br />

documents, the tender will be treated as having been submitted by individual signing the tender<br />

documents. The Railway will not be bound by any power of attorney granted by the tenderer or by<br />

changes in the composition of the firm made subsequent to the execution of the contract. It may,<br />

however, recognize such power of attorney and changes after obtaining proper legal advice, the<br />

cost of which will be chargeable to the contractor.


Page -12of 36<br />

20. The tenderer whether sole proprietor, a limited company or a partnership firm if they want to<br />

act through agent or individual partner(s) should submit alongwith the tender or at a later<br />

stage, a power of attorney duly stamped and authenticated by a Notary Public or Magistrate in<br />

favour of the specific person whether he/they be partner(s) of the firm or any other person<br />

specifically authorizing him/them to submit the tender, sign the agreement, receive money,<br />

witness measurements, sign measurement books, compromise, settle, relinquish any claim(s)<br />

preferred by the firm and sign “No Claim Certificate” and refer all or any disputes to<br />

arbitration.<br />

21. The Successful Tenderer must deposit a sum towards Security Deposit at the rates<br />

mentioned below :-<br />

i) For Contracts up to Rs. 1.00 10% of the value of the contract.<br />

Lakh.<br />

ii) For contracts costing more 10% of the first Rs. 1.00 lakh and 7.5% of the balance.<br />

than Rs. 1.00 lakhs & up to<br />

Rs. 2.00 lakh<br />

iii) For contracts costing more 10% of the first Rs.1.00 lakh, 7.5% for the next Rs.1.00<br />

than Rs.2.00 lakhs and up to<br />

Rs. 2.00 crores.<br />

lakh and 5% for the balance subject to maximum of<br />

Rs.10.00 lakhs . The amount over and above Rs.3.0 Lakh to<br />

be recovered from the progressive bills of the contractors<br />

iv) For contract above Rs.2.00<br />

crores.<br />

@ 10% till it reaches the required value.<br />

5% of the contract value. The amount over and above<br />

Rs.3.00 lakhs to be recovered from the progressive bills of<br />

the contractors @ 10% till it reached 5% of the contract<br />

value.<br />

22. The Earnest Money deposited with the tender which is subsequently converted into Security deposit<br />

shall, however, be refunded to the contractor only on satisfactory compliance of condition no.51 of the<br />

Works Hand Book Part I & II, General Conditions of Contract-2001 edition (at page-35).<br />

23. The special conditions stipulated herein below in addition to the condition mentioned in earlier pages<br />

shall be binding on the part of tenderer.<br />

24. The cancellation of any document such as Power of Attorney, Partnership Deed etc. should be<br />

forthwith communicated by the contractor to Administration in writing, failing which the<br />

administration shall have no responsibilities or liability for any action taken on the strength of the said<br />

documents.<br />

Signature of the Tenderer(s)<br />

Date :


<strong>EAST</strong> <strong>CENTRAL</strong> <strong>RAILWAY</strong><br />

Schedule of item of works<br />

(Rates are to be quoted by the tenderer/s)<br />

Name of work :- Supply of 1,00,000 Cum, 50mm size machine crushed track ballast and<br />

loading the same into any type of Rly. Wagons F.O.R. Pakur for E.C.<br />

Railway .<br />

Date of Completion :- The work is to be completed in all respects within 12(Twelve)<br />

Months from the date of acceptance of the tender.<br />

Page -13of 36<br />

Sl.<br />

No.<br />

Description of works Quantity Unit Rate in<br />

Figures<br />

1. Supplying machine crushed ballast as<br />

per specifications attached hereto<br />

including all lead, lift, ascent, descent,<br />

crossing of Rly. Lines, loading point and<br />

thereafter loading into any type of<br />

Railway Wagons including all incidental<br />

charges etc. complete in all respects<br />

F.O.R. Pakur.<br />

i) Rate of material element.<br />

1,00,000 Per<br />

Cum Cum<br />

Rate in<br />

Words.<br />

ii) Rate of labour element for<br />

stacking etc.<br />

1,00,000<br />

Cum<br />

Per<br />

Cum<br />

N O T E<br />

1(a) The above rates are inclusive of all taxes legally leviable or any other local taxes,<br />

license fee, royalty charges and cess etc.<br />

(b) No break-up of rates will be accepted.<br />

2. The work will have to be completed within 12 (twelve) months from the date of acceptance<br />

of tender for the full quantity.<br />

3. Specifications and special conditions as per attached sheets will apply.<br />

4. Test report of impact value, abrasion value and water absorption value of track ballast should be<br />

submitted alongwith the tender from from E.C. Railway`s Divisional laboratory at Sonepur OR from<br />

any Govt. Recognised Engineering College/Institutions. Such testing shall be got done after issue of the<br />

tender notice. The tenderers shall furnish original of such test report along with his tender.<br />

5. The tenderer/s shall also furnish the undertaking that the ballast to be supplied at all times will conform to<br />

specification for track ballast as specified by the Railway.<br />

6. Tenderer/s shall submit his/their credential and certificates of experience as per proforma given as annexure along<br />

with Banker’s certificates to indicate their financial status along with the tender.<br />

Sr. DEN(2)/DHN<br />

Signature of Tenderer/s<br />

Date :<br />

cont…/2


Page -14of 36<br />

7 Income Tax @ 2% plus surcharge on the amount payable against item No.1(ii) i.e. labour elements<br />

will be deducted from all bills of the contractor sources. In addition, Sales Tax imposed by State<br />

Government will also be deducted on the amount payable against item No. 1(i ) i.e. materials elements<br />

at the rates prescribed by the State Government ( @4% Jharkhand State ) unless otherwise directed<br />

by the Competent Commercial Tax Officers.<br />

8 Revision of Schedule or extension of date of completion will be governed by Clause-17 of the<br />

G.C.C.`2001.<br />

9. CONDITION REGARDING ROYALTY PAYMENT<br />

(i) With each on account bill, the contractor shall submit certificate from concerned Mining<br />

Department of State Govt. regarding full payment of royalty for quantity of ballast in the<br />

bill. In case of non-submission of such certificate, the Rly. shall release the payment only<br />

after deducting the royalty due to be paid to the Mining Department. The deducted<br />

amounts will be kept by Rly. as Security against any such claims raised by Mining<br />

Department of State Govt. to the Rlys. This deducted amount shall be released only after<br />

submission of royalty payment certificate either during running of contract or with the<br />

final bill.<br />

10 The tenerer/s should produce authentic document in proof of having valid license/lease for<br />

Mining of ballast from State Govt. Authorities or a memorandum of understanding between<br />

the leases and the tenderer/s while submitting their tenders. In absence of this, the tender<br />

would be liable to be rejected.<br />

11 Only those are eligible to tender, who are having valid license/lease from State Govt.<br />

authorities for Mining of ballast or on production of Memorandum of understanding (MOU)<br />

between the lease and the tenderer/s while submitting the tender.<br />

Supply Schedule<br />

Quantity of ballast to be supplied as per quarter from the date of acceptance of the tender as<br />

follows :-<br />

1. During the 1 st month Establishing of plant and machineries.<br />

2. During the 2 nd month -do- -do-<br />

3. During the 3 rd month = 10% of the quantity<br />

4. During the 4 th month = 10% of the quantity<br />

5. During the 5 th month = 10% of the quantity<br />

6. During the 6 th month = 10% of the quantity.<br />

7. During the 7 th month = 10% of the quantity.<br />

8. During the 8 th month = 10 % of the quantity.<br />

9. During the 9 th month = 10 % of the quantity.<br />

10. During the 10 th month = 10 % of the quantity.<br />

11. During the 11 th month = 10 % of the quantity.<br />

12. During the 12 th month = 10 % of the quantity.<br />

…………………………….<br />

Total Qty,- = 100% of the quantity<br />

Full address of the tenderer/s<br />

………………………………<br />

Signature of the tenderers<br />

Dated.


Page -15of 36<br />

<strong>EAST</strong> <strong>CENTRAL</strong> <strong>RAILWAY</strong>/ DHANBAD DIVISION<br />

SCHEDULE- D<br />

REBATE<br />

Order No. 07 /01 of 2005-06<br />

Open/Limited/Single<br />

Name of work: Supply of 1,00,000 cum 50mm size machine crushed track ballast<br />

and loading the same in to any type of Railway wagons F.O.R.<br />

Pakur for E.C. Railway.<br />

I/We offer general rebate of ………………………% (in figures) …………………… percent (in<br />

workds) as a lump sum rebate on items of all Schedule.<br />

NOTES: (1) If any tenderers wishes to give any rebate on the rates quoted by him / them the same<br />

can be filled by him/ them in this Schedule.<br />

2 It is to be noted that such rebate if offered, shall apply on the rates quoted for all the items<br />

in all other Schedules of the Tender documents. Such a rebate shall be totally<br />

unconditional .<br />

3 In case a Tenderer does not wish to give any rebates, he / they should write “Nil” in this<br />

Schedule. In case nothing has been filled in by the tenderer in this Schedule, it will be<br />

treated as “Nil” and shall be no recorded in the blanks above at the time of opening of the<br />

tender by the officals opening of the tender.<br />

4. If any tenderer gives any type of conditional rebate, such rebate shall not be considered for<br />

evaluation of the tender.<br />

Signature of Tenderer/s<br />

Date:


SPECIAL CONDITION OF CONTRACT AND STANDARD SPECIFICATION FOR<br />

Page -16of 36<br />

Name of work:<br />

Supply of 1,00,000 cum 50mm size machine crushed track ballast and<br />

loading the same in to any type of Railway wagons F.O.R. Pakur for E.C.<br />

Railway.<br />

(Standard ballast Specification January 1999 issue with up – to – date Correction Slips issued by<br />

RDSO/LKO vided letter No. RS/F/7/4 dtd. 23.7.99 may be referred)<br />

1.0 GENERAL:<br />

1.1 These Special Conditions & Specifications shall be read along with the set of tender<br />

documents and not in isolation therefrom.<br />

1.2 In all matters not explicitly provided for or allowed herein the execution of works shall<br />

be in accordance with and the contractor shall be bound by the Eastern Railway<br />

Engineering, Department General Conditions of contract`2001 and Standard<br />

Specifications 1969 on which Schedule of rates 1996 Edition is based ( herein after<br />

referred to as the General Conditions of contract) together with up – to – date Correction<br />

Slips and such amendments thereof as will be published from time to time where there is<br />

any conflict between the provisions, instructions, terms and conditions provided in the<br />

said General Conditions of contract and what is laid down herein under the later shall<br />

prevail.<br />

1.3 It shall be the responsibility of the contractor before submitting tender and before signing<br />

the contract document to ascertain and possess all amendments and / or corrections made<br />

to the said General Conditions of contract 2001 Edition.<br />

1.4 The rates shall be inclusive of all taxes legally leviable and / or any other local taxes,<br />

royalty, cess charges etc.<br />

1.5 Under load / over load shall be calculated on the basis of full rake load.<br />

2.0 SPECIFICATIONS OF STONE BALLAST.<br />

2.1 GENERAL.<br />

2.1.1 Basic Quality : Ballast should be hard durable and as far as possible angular along<br />

edges/corner, free from weathered portions of parent rock, organic impurities and<br />

inorganic residues.<br />

2.1.2 Particle Shape : Ballast should be cubical in shape as far as possible. Individual pieces<br />

should not be flaky and should have generally flat faces with not more than two rounded<br />

/ sub-rounded faces.<br />

2.2 PHYUSICAL PROPERTIES:<br />

2.2.1 Ballast sample should satisfy the following physical properties in accordance with<br />

IS-2386 Pt.IV-1963 when tested.<br />

(i) Aggregate Abrasion value<br />

30% Max<br />

(ii) Aggregate Impact Value<br />

20% Max.<br />

2.2.2 The water absorption tested as per IS-2386, Pt.III 1963 should not be more than<br />

1%.


Page -17of 36<br />

2.3 SIZE AND GRADATION :<br />

2.3.1 Ballast should satisfy the following size and gradation.<br />

i) Retained on 65 mm square mesh sieve – 5% Max.<br />

ii) Retained on 40 mm square mesh sieve - 40% to 60%.<br />

iii) Retained on 20 mm square mesh sieve - Not less than 98% for machine<br />

crushed ballast.<br />

2.3.2 OVERSIZE BALLAST:<br />

i) Retention on 65mm square mesh sieve: A maximum of 5% ballast retained on 65 mm<br />

sieve shall be allowed without deduction in payment.<br />

In case, ballast retained on 65mm sieve exceeds 5% but does not exceed 10%, payment at<br />

5% reduction in contracted rate shall be made for the full stack. Stacks having more than<br />

10% retention of ballast on 65mm sieve shall be rejected.<br />

ii) In case, ballast retained on 40 mm square mesh sieve (machine crushed case only)<br />

exceeds 60% limit prescribed in 2.3.1 (ii) above, payment at the following reduced rates<br />

shall be made for the full stack in addition to the reduction worked out at (i) above.<br />

- 5% reduction in contracted rates if retention on 40 mm square mesh sieve is between<br />

60% (excluding) and 65% (including).<br />

- 10% reduction in contracted rates if retention on 40 mm sq. mesh sieve is between<br />

65% (excluding_ and 70% (including).<br />

iii) In case, retention on 40 mm sq. mesh sieve exceeds 70%, the stack shall be<br />

rejected.<br />

2.3.3 UNDERSIZE BALLAST:<br />

The ballast shall be treated as undersize and shall be rejected if –<br />

i) Retention on 40mm Sq. mesh sieve is less than 40%.<br />

ii) Retention on 20mm sq. mesh sieve is less that 98%.<br />

2.3.4 Method of sieve analysis :<br />

i) Sieve size mentioned in this specifications are of nominal size. The following tolerance in the<br />

size of holes for 65mm, 40mm and 20mm nominal sieve sizes shall be permitted.<br />

65mm square mesh sieve - plus minus 1.5 mm<br />

40mm square mesh sieve - plus minus 1.5 mm<br />

20mm square mesh sieve - plus minus 1.0 mm<br />

Mesh size of the sieves should be checked before actual measurement. The screens for sieving of ballast<br />

shall be of sq. mesh & shall not be less than 100 cm in length, 70cm in breadth and 10cm height on<br />

sides.


Page -18of 36<br />

ii) While carrying out sieve analysis, the screen shall not be kept inclined, but held horizontally &<br />

shaken vigorously. The pieces of ballast retained on the screen can be turned with hand to see if they<br />

pass through but should not be pushed through the sieves.<br />

iii) The percentage passing through or retained on the sieve shall be determined by weight.<br />

3. CONDITIONS FOR SUBMISSION OF TENDER:<br />

3.1 Each tenderer at the time of tendering shall submit the test report of impact value, abrasion value,<br />

water absorption value of track ballast from E.C.Railway`s laboratory at Sonepur OR from any<br />

Govt. Recognised Engineering College/Institutions. Such testing shall be got done after issue of<br />

the tender notice. The tender shall furnish original of such test report along with his tender.<br />

3.2 The tenderer shall also furnish an undertaking that the ballast supply at all times will conform to<br />

specifications for track ballast as specified by Railway.<br />

4. SHRINKAGE ALLOWANCE :<br />

Payment shall be made for the gross measurement either in stacks or in wagons without any<br />

deduction of shrinkage/voids. However, when ballast supply is made in wagons, shrinkage up to 8%<br />

shall be permitted at destination while verifying the booked quantities by the consignee.<br />

5.0 SAMPLING AND TESTING:<br />

5.1 A minimum of 3 samples of ballast for sieve analysis shall be taken for measurement done on<br />

any particular date even if the number of stacks to be measured are less than three.<br />

5.2 In order to ensure supply of uniform quality of ballast, the following norms shall be followed in<br />

respect of sampling, testing and acceptance.<br />

5.2.1 On supply of the first 100 cum the tests for size gradation, abrasion value, impact value and<br />

water absorption (if prescribed) of track ballast shall be carried out by Railway at<br />

E.C.Railway`s Laboratory at Sonepur OR from any Govt. Recognised Engineering<br />

College/Institutions. Further supply shall be accepted only after this ballast satisfies the<br />

specifications of these test. Railway reserves the right to terminate the contract as per G.C.C. at<br />

this stage itself in case the ballast supply fails to conform with any of these specifications.<br />

5.2.2 Subsequent test shall be carried out as follows. These test can be carried out either at<br />

E.C.Railway`s Laboratory at Sonepur OR from any Govt. Recognised Engineering<br />

College/Institutions.<br />

Supply in stacks Supply in<br />

a) Size and gradation tests<br />

For stack of volume<br />

less than 100 cum<br />

For stacks of Volume<br />

more than 100 cum<br />

Wagons<br />

No. of Test<br />

One for each stack<br />

One for each stack<br />

One for each<br />

wagon<br />

Size of one sample<br />

b) Abrasion value, Impact<br />

value and Water<br />

Absorption test @<br />

Testing Frequency<br />

** 0.027 cum<br />

One test for every 2000 cum<br />

** 0.027 cum for every<br />

100 cum or part thereof<br />

** 0.027 cum<br />

** This sample should be collected using a wooden box of internal dimensions 0.3m x 0.3m x 0.3m<br />

from different parts of the stacks/wagons.


Page -19of 36<br />

@ These tests shall be done for the purpose of monitoring quality during supply. In case of the test<br />

results not being as per the prescribed specifications at any stage, further supplies shall be suspended<br />

till suitable corrective action is taken and supplies ensured as per specifications.<br />

The above tests may be carried out more frequently if warranted at the discretion of Railway.<br />

5.2.3 All tests for Abrasion value, impact value and water absorption if prescribed conducted<br />

subsequently to award of contract shall be done at Railway`s costs.<br />

6.0 Working hours:<br />

The contractor will be allowed eight clear working hours between sunrise & sunset to load a rake<br />

with a maximum capacity 1200 cum consisting of any type of wagons which may be available at<br />

the material time including covered wagons/open wagons, hoppers etc. after the rake has been<br />

placed for loading at quarry siding. If the rakes is not placed for loading at the quarry siding by<br />

10 A.M. the contractor will also be allowed to load on the following day so as to give him clear<br />

eight working hours. In the event of the contractor failing to load the rake within the time allowed<br />

a penalty for the entire period in excess of the time, allowed for which the train is so detained or<br />

up to the next schedule path which ever is later will be recovered at the rate of Rs.200/- per hour<br />

or part of an hours for BG train from contractors bills on any money, payable or refundable to<br />

him by the Railway.<br />

6.1 Stacking of ballast<br />

6.1.1 The contractor shall supply and stack 50mm size track ballast on plots situated on Railway land<br />

and allotted to him by Asstt. Engineer-in-charge/Quarry-Supervisor. Stacking of ballast on plots<br />

other than the plots allowed to the contractor is not permissible and the Asstt. Engineer-in-charge<br />

may refuse to pass and measure ballast stacked by the contractor on such plots.<br />

6.1.2 The stack shall not be less than 1.2m in a height. The maximum height of the stack shall be such<br />

that it does not cause in-convenience to the labour for loading the ballast. The side slopes of the<br />

stacks shall be uniform.<br />

6.1.3 Making of fresh stacks shall be permitted at a plot only after the earlier stack has been<br />

completely trained out and conditions of para 5 are fulfilled.<br />

6.1.4 The area for stacking may not be sufficient to stack all the ballast as per the agreemental<br />

quantities in one time. The ballast may have to be collected any number of times on the<br />

available stacking ground to complete the agreemental quantity. In such cases, after the<br />

contractor stacks the ballast once fully in the available stacking area, measurements shall be<br />

taken by the AEN and the contractor shall be authorized to train out the ballast.<br />

6.1.5 Collections of ballast in the depot by the contractor and training out of the ballast shall not<br />

progress simultaneously. Should it become necessary resort to simultaneous collection and<br />

lifting either due to limited stacking space available or due to quicker movement DMT/s or any<br />

other unavoidable circumstances it shall be ensured that no fresh stack/stacks are made in plots<br />

which are within at least 40 meters of the stacks from which loading of ballast is in progress.


Page -20of 36<br />

6.1.6 Any other precaution considered necessary to ensure that passed ballast is not mixed with un<br />

passed ballast shall be taken by Engineer-in-charge as the occasion demands.<br />

6.1.7 After the ballast is fully trained out and before authorizing the contractor to commence second<br />

round of supply in the same stacking area, the Authorised Officer shall inspect the site and<br />

make sure that all the stacks have been fully trained out and record a certificate in the ballast<br />

passing register and shall authorized the contractor to commence the second round of collection<br />

and stacking.<br />

6.2 Training out of ballast<br />

6.2.1 Training out of ballast shall only be made from stack/stacks passed by the AEN. After the<br />

ballast is loaded in the wagons/hoppers, the Quarry Supervisor/Depot-incharge shall personally<br />

record the wagons measurements in the ballast loading register and prepare the issue-cumreceipt<br />

note for this purpose in six copies on identically numbered foils which the sixth copy<br />

shall be retained by the Quarry Supervisor and other five copies sent to the consignee. The train<br />

wagons shall leave the ballast siding only after such RCC notes are completed in by the Quarry<br />

Supervisor-incharge.<br />

6.2.2 The ballast shall be loaded to the full carrying capacity of the wagons/hoppers. At the time of<br />

loading a maximum allowance for shrinkage of 2.5 cm pr 30 cm for ordinary wagons and 1.42<br />

cum and 2.07 cum for full load of hopper wagons with a capacity of 24.07 cum and 35.40 cum<br />

respectively shall be made.<br />

6.2.3 Final measurements for the ballast shall be taken based on wagons measurements as accepted<br />

by the consignee. These measurement which need make no allowance for shrinkage shall be<br />

taken by the consignee, PWI in the presence of the contractor or his authorized representative.<br />

The contractor or his authorized representative signature will be obtained on the RCI/Credit<br />

notes as well as in registers as token of his acceptance of these measurements.<br />

6.2.4 The Assistant Engineer of the receiving point shall exercise test check to the extent of at least<br />

20% and record the results there of on the relevant RCI challan/Credit note and register. The<br />

RCI/Credit note finally verified, test checked and accepted by the receiving PWI/AEN and the<br />

contractor or his authorized representative shall then be sent to the depot-incharge/PWIincharge<br />

of the ballast quarry.<br />

6.2.5 The consignee PWI/AEN on receipt of RCI/Credit notes and challans will arrange to have<br />

the RCI/Credit notes verified by the Stock holder under him where the ballast is unloaded<br />

and countersign all the five copies of RCI/Credit notes and challans. He will sent the 4 th copy<br />

to the Divisional Office for verification of debits where received from Dhanbad Division and<br />

the 5 th copy to the stock holder under him for record. The 1 st , 2 nd , and 3 rd copies shall be<br />

returned by him to the AEN/____________ who in turn will retain the 1 st copy as permanent<br />

receipt copy duly pasted with the 6 th copy already in his office 2 nd copy of each accepted<br />

RCI/Credit note and challan will be retained by the AEN/_________ and all such copies for<br />

the entire contract would be annexed with the final bill submitted to Dhanbad Divisional<br />

Office for final payment. 3 rd copy of the accepted RCI/Credit note and challan will be sent<br />

to the Dhanbad Divisional Office for record and for raising debits on the consignee division.


Page -21of 36<br />

6.2.6 In case of contractor or his /their authorized representative does not turn up to witness the<br />

measurement at the loading point the measurements shall be taken in his/their absence by the<br />

AEN/PWI-Incharge and shall be considered as final and no claim on this account shall be<br />

entertained by Railway.<br />

6.2.7 In case there is disputes regarding the quality of ballast between the receiving AEN and the AEN<br />

where ballast is loaded, the matter shall be referred to the Divisional Engineer-in-charge of the<br />

quarry whose decision in regard the quality will be final.<br />

7.0 METHOD OF MEASUREMENT:<br />

7.1 Asstt. Engineer/___________ shall operate this contract and shall exercise quality and<br />

quantity checks. Indents & RMC/Credit Notes shall be handed over to S.S./GSS by the<br />

AEN/____________ indicating the consignor & consignee particulars. Acknowledgement<br />

of the contractor will be obtained in a register of RMC/Credit Notes maintained for this<br />

purpose. The contractor should follow up the supply of Wagons/Hoppers against the<br />

indents and RMC/Credit Notes submitted by Quarry Incharge.<br />

7.2 The contractor shall submit a monthly report within 7(Seven) days after expiry of a month<br />

to Divisional Railway Manager & Asstt. Engineer-in-charge indicating particulars of indents<br />

placed against RMC/Credit Notes issued to him, indicating date of placement of indents and<br />

supply and loading of Wagon/Rakes etc.<br />

7.3 The contractor shall load wagon/Hoppers to the full carrying capacity including permissible<br />

overload and in any case where any of the Wagon/Hoppers and found under loaded by<br />

more than one tonne, calculated at the rate of 21 Cft. (0.595 Cum) per tonne. He will be<br />

liable for recovery of freight at the Full Public Tariff on the under load quantity<br />

proportionate to the full carrying capacity including the permissible overload and the same<br />

will be recovered form the contractors bill or from his any other dues with the Railway.<br />

Similarly, if part of a rake is not loaded by the contractor and the rake with empty wagons<br />

are drawn out of quarry siding, contractor shall be liable to pay full freight charges of such<br />

wagons/hoppers at Public Tariff rate and the same will be recovered from the contractor`s<br />

bill.<br />

7.4 No payment will be made for ballast loaded in wagons/hoppers over and above the carrying<br />

capacity of the wagons/hoppers plus maximum permissible overload.<br />

7.5 It shall be the responsibility of the contractor to ensure before loading, the ballast conforming to<br />

specifications are loaded in Wagons/Hoppers.<br />

7.6 The ballast loaded into Wagons/Hoppers shall be checked and passed by the Assistant Engineerin-charge<br />

of the Depot Measurement will be taken of the ballast which are found according to<br />

specifications detailed in Clause-2 and passed by the Assistant Engineer-in-charge and the same<br />

will be recorded in the measurement book. The ballast in any Wagons/Hoppers which are not<br />

according to specifications and which are rejected by the<br />

the Assistant Engineer-in-charge shall be unloaded and removed by the contractor forthwith,<br />

In the event of contractor’s failure to unload and remove the rejected ballast within 24 hours<br />

from the date of order for removal, the <strong>Railways</strong> will cause it to be unloaded and removed to<br />

such place as may be convenient to the Railway. For the quantity of rejected ballast Railway<br />

will recover the demurrage charges. Ground Rent and the expenditure incurred by the<br />

<strong>Railways</strong> if any for unloading and removal of rejected ballast. The Railway will not be<br />

responsible for any loss or damage for the ballast so rejected.


Page -22of 36<br />

7.7 The Contractor shall make necessary arrangement for inspection of the ballast by<br />

the Railway Representative of the loading Point/Yard and shall ensure that ballast conforming<br />

to the approved samples are only loaded at Quarry Siding.<br />

7.8 Measurement will be taken by Assistant Engineer-in-Charge of……………….. after quality<br />

and quantity check in Wagons/Hoppers at Pakur in presence of the contractor or his authorized<br />

representative. The measurement shall be recorded in measurement book and signed by the<br />

contractor and the Assistant Engineer-in-Charge before the departure of ballast rake 90%<br />

payment will be made after measurement as taken by the AEN at Pakur for the gross<br />

measurement in wagons without any deduction for shrinkage or voids. Any other deduction as<br />

may be admissible under General Condition of Contract`2001 and Standard Specificatins,1969<br />

and Special Conditions of contract will be made. Balance 10% payment will be made after<br />

receipt of duly verified and accepted challan from the ultimate consignee. Variation in quantity<br />

up to 8% shall be permitted on account of shrinkage between the original quantity by AEN-in<br />

Charge and the quantity recorded in the verified challan by the ultimate consignee.<br />

7.9 The RCI (issue-cum-receipt)/Credit note and challans for this purpose shall be made by the<br />

AEN-in-Charge in 6(Six) copies on identically numbered foils. One additional copy of the<br />

challan should also be prepared as contractor’s copy.<br />

7.10 In the event of supplies from outside the West Bengal State, necessary ‘D’ Form for Inter State<br />

of the Central Government Organisation shall be issued by the East Central Railway.<br />

7.13 Subject or other wise provided in the contract, all notices to be given on behalf of the President<br />

of India and all other actions to be taken on his behalf may be given or taken in his behalf by<br />

the Principal Chief Engineer, E.C.Rly., Hajipur or the Divisional Railway Manager or<br />

Sr.Divisional Engineer(Co-Ordn.), E.C.Rly., or Divisional Engineer, E.C.Rly., Dhanbad any<br />

other authority competent to do so.<br />

7.14 The measurements should be recorded personally by the AEN/Ballast in the Ballast<br />

Passing Register indicating the followings details.<br />

1. Reference of Agreement.<br />

2. Date of Measurement.<br />

3. Wagon/Hipper No.<br />

4. Location/Position of the wagons/Hopper at the time of measurement.<br />

5.Results of qualtitative checks against approved sample/GCC/Contract conditions.<br />

6.Measurements of the loaded wagons and the volume.<br />

7. Destination and consequence particulars.<br />

These measurements and qualitative analysis of the ballast should be done in the presence of<br />

the contractor or his authorized/ representative whose signature in token of acceptance must<br />

be obtained on the Ballast Passing Register and challan.


Page -23of 36<br />

7.14.1 At the time of loading a maximum allowance for shrinkage of 1 inch/foot or 2.5 cm/30<br />

cm for ordinary wagons and 73 cft/2.07 cum for full load of Hopper/Wagons with a capacity<br />

of 1250 cft/35.40 cum shall be made in arriving at the accepted measurement volume based on<br />

which challan will be prepared by the supervisor-in- charge in the prescribed form and in<br />

terms of the G.C.C. A copy of the relevant entries in the Ballast passing Register should be<br />

enclosed with the challan. The Supervisor-In-Charge must completely fill up the challan<br />

before the Hopper/Wagons shall leave the siding.<br />

7.14.2 Final measurement for the ballast shall be based on measurement of ballast in wagons<br />

received by the consignee. After arrival of the hoppers/wagons at destination, the consignee<br />

sectional AEN shall check 20% of the ballast for quality. Over size/under size and also the<br />

measurement of ballast in wagons with the challans received from the supervisor at loading<br />

point. He may entrust the work of checking over size/ under size of ballast to the consignee<br />

PWI at his discretion in which case necessary entries in the respect shall be made by the<br />

consignee PWI in the challan under his signature. Since these measurements are taken at<br />

destination, the measurement as actually recorded are to be accepted and no deduction for<br />

shrinkage need be made. The results of the check will be entered in a register maintained in<br />

the form an M.B. . The DEN/Sr. DEN may exercise of these measurement at his discretion.<br />

7.14.3 Should it be found by the consignee that the quantity of ballast loaded in the<br />

wagons/hoppers is less that the full carrying capacity, action shall be taken as provided in<br />

General Condition of Contract or in the absence thereof the freight charge incurred by the<br />

railway for the materials actually carried less should be realized from the contractor’s bill at<br />

the Public Tariff.<br />

7.15 In case, there is a dispute regarding the quality of ballast between the receiving AEN and<br />

the AEB In-charge of the ballast quarry at which ballast is loaded the matter should be<br />

reffered to the DEN/Sr .DEN In-charge of the quarry whose decision in regards to the quality<br />

will be final . In all such case the Hopper/Wagons should not be unloaded directly on the track<br />

but shall either be kept under load for inspection or the ballast shall be unloaded and kept<br />

separately in stacks at some convenient place to facilitate for inspection by the DEN/Sr. DEN.<br />

7.16 In case the ballast is found to be unacceptable, the contractor shall be called upon to<br />

remove the rejected ballast from the Railway premises within reasonable time provided in the<br />

contract and the freight incurred by the railway on the consignment based on the full carrying<br />

capacity of the wagons shall be realized from the contractor at the Public Tariff Rate.<br />

7..17 Should the contractor choose to rectify the defects either by breaking the over size<br />

ballast or by screening under size ballast and if the ballast so offered is acceptable to the<br />

Railway, the same shall be measured and accepted by the sectional AEN after making<br />

deduction towards shrinkage as per extent rules. In case a part quantity only of the ballast<br />

consignment is found acceptable after rectification, the deduction for freight as per para 4.7.1<br />

above for the full carrying capacity minus the quantity accepted shall be made.<br />

7.17.1 RMC Notes can be handed over to the contractor wherever required but a proper<br />

accountal must be kept . A separate register should be maintained to show the transactions,<br />

which should be particularly checked to see that the RMC Notes are not misued.


Page -24of 36<br />

7.18 The followings clause should be included in the ballast supply tenders/contracts:<br />

“ As the destination the payment for ballast shall be made for the actually measured<br />

quantity which in no case shall be more than the full carrying capacity of the wagons. At the<br />

destination, any loading found over & above the full carrying capacity of the wagons/hoppers<br />

shall not be paid for. “ Full” carrying capacity of wagons will be deemed to be the carrying<br />

capacity of wagons plus the allowable over load.<br />

7.19 CONDITION REGARDING ROYALTY PAYMENT<br />

With each on account bill, the contractor shall submit certificate from concerned Mining<br />

Department of State Government regarding full payment of royalty for quantity of ballast in<br />

the bill. In case of non-submission of such certificate, the Railway shall release the payment<br />

only after deducting the royalty due to be paid to the Mining Department. The deducted<br />

amounts will be kept by Rly. as Security against any such claims raised by Mining Department<br />

of State Govt. to the Rly. . This deduction amount shall be released only after submission of<br />

royalty payment certificate either during running of contract or with the final bill.<br />

8 SECURITY DEPOSITS<br />

(a) The contractor must deposit a total sum (as specified in para 22 of the Tender Form (Second<br />

Story) Conditions of Tender) including earnest money in cash with Dy.Chief Casher,<br />

E.C.Rly., Patna or in form of Pay Order/Demand Draft of State Bank of India or any other<br />

nationalized Bank deposit receipt, Government securities to be drawn in favour of FA &<br />

CAO/E.C.Rly. Payable at PATNA within 7 days of receipt of acceptance letter failing which<br />

the acceptance of tender shall be treated as cancelled and earnest money deposited with the<br />

Railway shall be forfeited. Subject to the provision in the succeeding sub-clauses, this sum<br />

will be retained by the Railway. As security deposit free of interest for the due performance<br />

and observance of the terms and conditions of the contract to the satisfaction of the Railway<br />

and is liable to forfeiture in whole or in part in the event of breach of the terms here of on the<br />

part of the contractor.<br />

(b) After the contractor has supplied the full contractual quantities the said security deposit will be<br />

refunded to him along with the payment of final bill submitted by Asstt.Engineer-in-Charge.<br />

(c) Failure to supply the materials in accordance with the quantities detailed in tender schedule<br />

here under will make the contractor liable to following penalties being realized from payment<br />

from his on account bills. Five percent “5% of the value of the quantity of materials<br />

outstanding calculated at the accepted rates per cubic meter (CUM) the quantity being<br />

taken to the nearest Cubic metre”.<br />

Contractor shall however make good that shortfall in subsequent next terms and shall be paid<br />

for this portion of the supply at the rate payable for the term during which this short fall<br />

occurred for the purpose of calculation of price variation. Penalty recovered in relevant term<br />

will be refunded only when shortfall in supply shall be made good in subsequent term failing<br />

which the same will be forfeited.<br />

Excess supply of ballast, as compared to the Supply Schedule given in the Schedule of Works<br />

up to the end of any term shall be carried forward to the next term for working out shortfalls<br />

mentioned in Clause above.


(d)<br />

Page -25of 36<br />

The Railway will also be at liberty to deduct from the said security deposit or from any sum<br />

due or to be become due hereunder, or under any other contract with the contractor or may<br />

other wise recover from the contractor all sums that may become due to the Railway by virtue<br />

of any of the terms thereof.<br />

9 The Railway reserve the right to divert the supply to any station according to the needs of the<br />

Railway and this shall be binding on the contractor.<br />

10 The tenderer must submit credential of works done previously of the nature along with the<br />

payment received failing which his offer shall be treated as incomplete.<br />

11 The rates quoted in the Tender shall include :<br />

(i)<br />

(ii)<br />

All lead, lift and all charges including loading of ballast into Hoopers/General Service Wagons<br />

including screening of ballast if necessary and testing of ballast samples periodically by the<br />

Railway.<br />

All Taxes including Income Tax (if leviable) Sales Tax, Royalty, Cess and all other central and<br />

local taxes existing or that may be imposed in future. No extra charges will be paid on this<br />

account during current of contract.<br />

12 A list of plants and equipments and workshop equipment and machines, required for<br />

installation and maintenance of the mechanized should be furnished along with the Tender.<br />

The contractor should make his/their own arrangements for procurement and installation of all<br />

plants, tools and equipments required for successful completion of the contract in time.<br />

13 The ballast to be supplied must conform to the specifications for ballast s detailed in clause-2<br />

of the special conditions.<br />

14 The contractor must abide by comply with the provisions and rules of contract labour<br />

(Regulation and Abolition) Act, 1970 and Central Rules,1971.<br />

15 Income Tax @ 2% plus surcharge or as per amendment of Income Tax rules if leviable as per<br />

law will be deducted from all bills of the contractor at source. Sales tax imposed by State Govt<br />

will also be deducted at the rate prescribed by the respective State Govt. unless otherwise<br />

decreed by the local commercial Tax Officer’s competent Authority.<br />

15.1 State Sales Tax at the rate notified in this behalf from time to time by Govt. on the value of<br />

contract, if legally leviable, shall be recovered by the Railway Administration from the<br />

contractor’s bills in respect of contract exceeding Rs.25,000/- unless otherwise so stated by the<br />

concerned Commercial Tax Officer/competent authority.<br />

Signature of the Tenderer(s)<br />

Date:___________


ADDITIONAL SPECIAL CONDITION<br />

Page -26of 36<br />

1 In all matters not expressly provided for or allowed in execution of works shall be in<br />

accordance with the Railway General conditions of contract`2001 and standard<br />

specification (1969) Edition with amendments made therein from time to time. Moreover,<br />

the following condition will also prevail in addition to these laid down in the Engineering<br />

department Book of General condition of contract and standard specification referred to<br />

above. Where there is any conflict between the instruction/conditions of specification<br />

contained in the special conditions of this tender and any to those which appear in the Book<br />

of General Condition of contract and standard specifications on which schedule of rates is<br />

based (1969) edition referred to in this contract the former shall prevail.<br />

2 All materials to be supplied by the contractor shall be subject to prior inspection and<br />

approval of site by the Divisional Engineer or his representative. Rejected materials should<br />

be removed from the site by the contractor at his own cost within the time fixed by the<br />

Officer-in-Charge.<br />

3 No tools and plants for execution of the works shall be supplied by the Railway and the<br />

contractor will have to make his own arrangements for the same and nothing extra will be<br />

paid on this account. However, the same may be supplied to the contractor on request, if<br />

available in stock on hire charge basis.<br />

4 No passes or concessional facilities either for travel of the contractor or his own agents and<br />

his labour for transportation of material will be allowed by the Railway.<br />

5 The rates quoted by contractor should be inclusive of Sales Tax and any other taxes and<br />

nothing extra will be paid in the scope.<br />

6 Fluctuation of market rates should be considered before rates are quoted and claim will not<br />

be entertained on this account in any case.<br />

7 Contractor will be paid for the quantity of work actually done by him according to the terms<br />

and conditions of the contract.<br />

8 If the contractor fails to return any excess unused materials supplied by the Railway the cost<br />

thereof shall be reserved from him at issue rates plus Railway freight, incidental charges nd<br />

supervision charges at prevailing rates increased by 100% in cost. The excess materials<br />

should be returned to the IOWs Godown at the contractor’s cost within reasonable time<br />

fixed by the Engineer at site.<br />

9 The acceptance of the tender does not entitle the contractor any compensation, in case, the<br />

work is not done evenafter the execution of the agreement.<br />

10 (a) Deduction of 10% will also be made from each on accounts bill till the sum so deducted<br />

plus the amount deposited as initial Earnest money (which after acceptance of that tender<br />

has been converted into part of security deposit) shall amount to 5% of total value of the<br />

contract.<br />

(b) No interest will be allowed for the money he has deposited and on any amount payable<br />

to the contract under this contract.


Page -27of 36<br />

11 The Railway reserves the right to increase or decrease the quantity of the contract and<br />

Railway does not guarantee to give work against each item of the tender schedule and the<br />

contractor will not be entitled to any claim and compensation on this account.<br />

12 Earnest money will be refunded after completion of 6 months maintenance period,<br />

fulfillment of the contract and completion of work in all respects to the entire satisfaction of<br />

the Railway and on receipt of No Claim Certificate from the contractor to the effect, the<br />

there is no claim in respect of this work contract.<br />

13 The provision of contract labour (Regulation and Abolition)Act,1970 and Contract Labour<br />

(Regulation and Abolition) General Rules,1971 with all addition, alteration and<br />

amendments as may be made from time to time shall be fully binding on the contractor and<br />

shall become part of this contract thereof. The violation of any of the essential and<br />

substantial terms and conditions of the said act by the contractor as one of the parties to the<br />

contract, may lead to abrogation of contract as per order and or directive of the competent<br />

authority under the said act and rules with or without any notice what-so-ever on that,<br />

without payment of any damage what-so-ever, which may arise as a consequent upon such<br />

abrogation of the contract.<br />

14 The contractor besides his other liabilities shall also be bound and liable to the Railway<br />

Administration (Principal Employer) being the parties to the contract to pay or/on<br />

compensation for the expense which the Railway has to incur to fulfill the terms and<br />

conditions and or provision of the said act, rules because of failure on the part of the<br />

contractor to fulfill these terms and condition and or provision of the said act and rules and<br />

Railway Administration (Principal Employer) as one of the as parties to the contract shall<br />

be at liberty to deduct the amount may also be essential in this manner as provided for the<br />

Act and the rules or otherwise at its description.<br />

15 The contractor has to take all precautionary measures for the protection of any structure,<br />

column and other installation adjacent to the site of work by providing adequate props,<br />

shoring etc., which is to be approved by the Engineer-in-Charge.<br />

16 Clause No.51(2) Post payment Audit : It is an agreed terms of the contract that the<br />

Railway reserves to itself the right to carry out a post payment audit and or technical<br />

examination of the works and the final bill including all supporting vouchers, abstracts<br />

etc. and to make a claim on the contractor for the refund of any excess amount paid to him<br />

if, as a result of such examination, any over-payment to him is discovered to have been<br />

made in respect of works done or alleged to have been done by him under the contract.


Page -28of 36<br />

17 Clause No.52 withholding and lien in respect of sums claimed :<br />

Whenever any claim or claims for payment of a sum of Money arises out of or under the<br />

contract against the contractor, the Railway shall be entitled to with hold and also have a<br />

lien to retain such sum or sums in whole or in part from the security, if any deposited by<br />

the contractor and for the purpose aforesaid, the Railway shall be entitled to with hold the<br />

said cash security deposit or the security if any, furnished as the case may be and also<br />

have a lien over the said pending finalisation or adjudication of any such claim. IN the<br />

event of the security being insufficient to cover the claimed amount or amounts or if no<br />

security has been taken from the contractor the Railway shall be entitled to with hold and<br />

have a lien to the extent of the such claimed amount or amounts referred to supra, from<br />

any sum or sums found payable or which at any time thereafter may become payable to<br />

the contractor under the same contract or any other contract with this or any other Railway<br />

or any department of the Central Government pending finalisation or adjudication of any<br />

such claim.<br />

It is an agreed term of the contract that the sum of money or monies so with held or<br />

retained under the lien referred to above by the Railway will be kept with held or retained<br />

as such by the Railway till the claim arising out of or under the contract is determined by<br />

the arbitrator (if the contract is governed by the arbitration Clause) or by the competent<br />

Court as the case may be and that the contractor will have no claim for interest or<br />

damages what-so-ever on any account in respect of such with holding or retention under<br />

the lien referred to supra and duly notified as such to the Contactor. For the purpose of<br />

this clause, where the contractor is a partnership firm or a limited company, the Railway<br />

shall be entitled to with hold and also have a lien to retain towards such claimed amount<br />

or amounts in whole or in part from any sum fund payable to any partner/limited<br />

company, as the case may be whether in his individual capacity or other-wise.<br />

18 Clause No.52A – Lien in respect of claims in other contracts :<br />

Any sum of money due and payable to the contractor (including the security deposit<br />

returnable to him) under the contract may be with held or retained by way of lien by the<br />

railway, against any claim of this or any other Railway or any other department of the<br />

Central Government in respect of payment of a sum of money arising out of or under any<br />

other contract made by the contractor with this or any other department of the Central<br />

Government.<br />

It is an agreed term of the contract that the sum of money so withheld or retained under<br />

this clause by the Railway will be kept withheld or retained as such by the Railway till the<br />

claim arising out of or under any other contract is either mutually settled or determined by<br />

arbitration, if the other contract is governed by arbitration clause or by the competent<br />

court as the case may be and the contractor shall have no claim for interest or damages,<br />

what-so-ever on this account or on any other ground in respect of any sum of money<br />

withheld or retained under this clause and duly notified as such to the contractor.


Page -29of 36<br />

19 Variation in contract Quantities :<br />

The variation in contract quantities shall be regulated as per the following provisions of<br />

Railway Board’s letter No.94/CE-I/CT/4 dated 17.10.2002 docketted by CE(Co-<br />

Ord.)/East Central Railway vide his letter No.ECR/ENG/02/Ten/2/623/588 dated<br />

29.10.2002.<br />

(i)<br />

For controlling the payment, in case the agreemental value goes beyond (+) 25%, the<br />

following regulatory mechanism shall be applied –<br />

(a) For the first 15% increase in the value beyond 25% of agreemental value, the rates<br />

will have a reduction of 2% in the incremental value of the agreement.<br />

(b) For the next 10% increase in the value, the rates will have an additional reduction of<br />

2% in the further incremental value of the agreement.<br />

(ii)<br />

20.<br />

The execution of quantities beyond (+) 50% of the overall agreemental value would<br />

normally not be permitted. If found necessary, it shall be done as per the procedure laid<br />

down in Railway Board’s letter No.94/CE/CT-I/37 dated 05.05.1995 for variation<br />

beyond 25%<br />

Tenderer while quoting their rate for supply & loading of ballast should indicate what<br />

rates of royalty taxes and forest transit permit imposed by concerned department has<br />

been considered. For this documentary proof issued by competent authority of<br />

department concerned should be enclosed along with tender document.<br />

Any increase/ decrease in forest transit permit and royalty taxes during the currency of<br />

the contract will be reimbursed/ recovered by the <strong>Railways</strong>. The contractor will have to<br />

submit the latest rates of these taxes during execution of work with each running bill<br />

along with documentary proof issued by competent authority of department concerned..<br />

Signature of the tenderer(s)<br />

Date :________________


DETAILS OF WORK AWARDED TO THE FIRM DURING LAST FIVE YEARS<br />

Page -30of 36<br />

ANNEXURE - II<br />

Sl.<br />

No.<br />

Name of work<br />

taken up<br />

during last five<br />

years<br />

Nature of work,<br />

Brief Description<br />

Name of<br />

Address of the<br />

Claint/Deptt.<br />

Contract<br />

value in<br />

Lacs of<br />

Rupees<br />

Date of<br />

Award of<br />

contract<br />

Schedule<br />

Date of<br />

Completion<br />

Actual<br />

Date of<br />

completio<br />

n with<br />

brief<br />

reason for<br />

delay, if<br />

any<br />

Whether<br />

the work<br />

was<br />

completed<br />

in<br />

continuing<br />

of<br />

terminated<br />

.<br />

Whether any<br />

specialized<br />

agencies other<br />

contractor<br />

were<br />

employed by<br />

the tender and<br />

if so, what for<br />

?<br />

Net payment<br />

received<br />

during the<br />

financial<br />

year against<br />

each of the<br />

contract in<br />

the last 5<br />

years.<br />

Current commitment of<br />

work.<br />

This Next<br />

Year<br />

i.e.<br />

20__<br />

year<br />

i.e.<br />

20__<br />

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)<br />

Next<br />

year<br />

i.e.<br />

20__


Sl.<br />

No.<br />

N a m e<br />

Page -31of 36<br />

ANNEXURE - I<br />

DECLARATION REGARDING ASSOCIATION OF <strong>RAILWAY</strong> OFFICER(S) WITH TENDERER (S)<br />

Status with the<br />

Tenderer<br />

If working in Rly. on the date of<br />

tendering, designation & place of<br />

posting.<br />

If retired on the date of tendering<br />

Date of<br />

Retirement<br />

Status at<br />

Retirement<br />

(1) (2) (3) (4) (5) (6) (7)<br />

Particulars of<br />

permission taken for<br />

associating with the<br />

tenderer.


ANNEXURE – III/A<br />

Page -32of 36<br />

LIST OF ARBITRATION CASES DURING LAST FIVE YEARS<br />

Sl.<br />

No.<br />

Name of work Value of work Name of<br />

Client/Deptt.<br />

Amount and date of<br />

claim preferred<br />

Claim of Deptt.,<br />

if any.<br />

Brief Reasons of<br />

disputes.<br />

Final/Present<br />

position of the Case.<br />

(1) (2) (3) (4) (5) (6) (7) (8)


Page -33of 36<br />

ANNEXURE – III/B<br />

Sl.<br />

No.<br />

Name of work<br />

LIST OF COURT CASES DURING LAST FIVE YEARS<br />

Value of<br />

work<br />

Name of<br />

Client/Deptt.<br />

Name of<br />

Court<br />

Date of<br />

Institution of<br />

Case<br />

Relief<br />

sought from<br />

Court<br />

Brief Reason of<br />

Dispute<br />

(1) (2) (3) (4) (5) (6) (7) (8) (9)<br />

Final Present<br />

position of the<br />

Case.


Page -34of 36<br />

ANNEXURE –IV<br />

Sl.<br />

No.<br />

Description of<br />

Equipments<br />

Number Available<br />

DETAILS OF EQUIPMENT<br />

Date of<br />

Purchase<br />

Date of<br />

Manufacture<br />

Mote<br />

How Driven i.e.<br />

Petrol/Diesel/<br />

Electric<br />

Condition of<br />

the Equipment<br />

Whether the<br />

Equipment<br />

cana be<br />

inspected.<br />

(1) (2) (3) (4) (5) (6) (7) (8) (9)


Page -35of 36<br />

ANNEXURE – V<br />

DETAILS OF TECHNICAL PERSONNEL<br />

Sl. N A M E Age Technical<br />

Position with Commencement of Total experience Emoluments.<br />

No.<br />

Qualifications(s) the Tenderer present employment<br />

(1) (2) (3) (4) (5) (6) (7) (8)


Page -36of 36<br />

ANNEXURE – VI<br />

I/We as a tenderer(s) hereby certify and give undertaking that the<br />

track ballast to be supplied against this tender at all times will conform to<br />

specifications for track ballast as per the specifications of <strong>Railways</strong> circulated<br />

vide tender document of the instant tender.<br />

Signature of the tenderer (s)<br />

Date

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!