Chapter 3 Structured Cable Field Calibration and Testing Step 3 ‣ Remove the RJ45 mini patchcord from the RH and the hybrid patchcord. ‣ With the DH hybrid patchcord open-ended, select START from the DH Field Calibration screen to perform the third calibration process. Step 4 ‣ Re-connect the RJ45 plug of the first hybrid patchcords to the Remote Handset (RH). ‣ With the RH hybrid patchcord open-ended, press AUTOTEST from the RH to perform the fourth calibration process. Upon completion of the calibration process, the LANTEK handsets and the hybrid patchcords are ready for use in testing cables. FIELD CALIBRATION - BLOCK TESTING 66/110/BIX This Field Calibration is a 4-step process. Steps 1 and 2 are performed with a patchcord connected to the Handsets. Steps 3 and 4 are performed with open-ended patchcords (only one end connected to each Handset). For Block 66 Systems The RJ45 block calibration adapters connected to the block during calibration is either the T568A or 568B RJ45/66 Block adapter. The T568A adapter is used with patchcords connected in a TIA-568A configuration. The T568B adapter is used with patchcords connected in a TIA-568B configuration. Both block adapters have the standard RJ45 plug at the opposite end. 3-6
Chapter 3 Structured Cable Field Calibration and Testing Calibrating the tester for the 110/BIX Block System: Step 1 and 2 ‣ Connect the adapters to the Display Handset (DH) and Remote Handset (RH). Power both units on. ‣ Connect the RJ45-to-RJ45 patchcord that you plan to use as the RH patchcord to the adapters of the DH and RH units. ‣ From the DH Ready screen, select Field Calibration. The Calibration screen appears. Select START to begin the calibration. ‣ Select START again to perform the second calibration process. Each step will take about 10-20 seconds to complete. ‣ At the completion of this calibration process disconnect the RJ45 patchcord from the DH unit, leaving the RJ45-to-RJ45 patchcord attached to the RH unit. Step 3 ‣ Insert the second (DH) RJ45 to Block Plug patchcord into the DH unit where the RJ45 end is connected into the DH unit adapter and the block plug is left openended. ‣ From the DH Field Calibration screen, select START or press AUTOTEST to begin the third calibration process. Step 4 ‣ From the RH, press AUTOTEST to begin the fourth calibration step. ‣ If calibration is successful, the DH will briefly Display “Calibration Complete” and the RH will briefly display the PASS light. The handsets and the patchcords are now ready for testing procedures. ‣ If calibration is unsuccessful, the DH will briefly display either a Warning screen displaying “No Remote Handset” or a Calibration Failure screen. Calibrating the tester for the 66 Block System: Steps 1 and 2 ‣ Connect the RJ45 adapters to the Display Handset (DH) and Remote Handset (RH). Power both units on. ‣ Connect the RJ45-to-RJ45 Patchcord that you plan to use as the RH Patchcord to the adapters of the DH and RH units. ‣ From the DH Ready screen, select Field Calibration. The Calibration screen appears. Select START to begin the calibration process on the (RH) Patchcord. ‣ Then select START again to perform the calibration process. This will take about 10-20 seconds to complete. ‣ At the completion of this calibration process disconnect the RJ45 patchcord from the DH unit leaving the RJ45-to-RJ45 patchcord attached to the RH unit. 3-7
- Page 2 and 3: LANTEK TM CABLE TESTER USER’S GUI
- Page 4 and 5: TABLE OF CONTENTS OPERATIONAL NOTES
- Page 6 and 7: TROUBLESHOOTING 10/100/1000 BASE-T
- Page 8 and 9: Headers and Footers Command .......
- Page 10 and 11: OPERATIONAL NOTES, CAUTIONS, AND WA
- Page 12 and 13: Chapter 1 Your Cable Tester PRODUCT
- Page 14 and 15: Chapter 1 Your Cable Tester Table 1
- Page 16 and 17: Chapter 1 Your Cable Tester Item DH
- Page 18 and 19: Chapter 1 Your Cable Tester HARD AN
- Page 20 and 21: Chapter 1 Your Cable Tester DISPLAY
- Page 22 and 23: Chapter 1 Your Cable Tester OVERVIE
- Page 24 and 25: Chapter 2 Test Setup Procedures AUT
- Page 26 and 27: Chapter 2 Test Setup Procedures TIM
- Page 28 and 29: Chapter 2 Test Setup Procedures Fig
- Page 30 and 31: Chapter 2 Test Setup Procedures PAC
- Page 32 and 33: Chapter 2 Test Setup Procedures TEM
- Page 34 and 35: Chapter 2 Test Setup Procedures Tab
- Page 36 and 37: Chapter 2 Test Setup Procedures Sav
- Page 38 and 39: Chapter 2 Test Setup Procedures OTH
- Page 40 and 41: Chapter 2 Test Setup Procedures Edi
- Page 42 and 43: Chapter 2 Test Setup Procedures ACT
- Page 44 and 45: Chapter 3 Structured Cable Field Ca
- Page 46 and 47: Chapter 3 Structured Cable Field Ca
- Page 50 and 51: Chapter 3 Structured Cable Field Ca
- Page 52 and 53: Chapter 3 Structured Cable Field Ca
- Page 54 and 55: Chapter 3 Structured Cable Field Ca
- Page 56 and 57: Chapter 3 Structured Cable Field Ca
- Page 58 and 59: Chapter 3 Structured Cable Field Ca
- Page 60 and 61: Chapter 3 Structured Cable Field Ca
- Page 62 and 63: Chapter 3 Structured Cable Field Ca
- Page 64 and 65: Chapter 3 Structured Cable Field Ca
- Page 66 and 67: Chapter 3 Structured Cable Field Ca
- Page 68 and 69: Chapter 3 Structured Cable Field Ca
- Page 70 and 71: Chapter 3 Structured Cable Field Ca
- Page 72 and 73: Chapter 3 Structured Cable Field Ca
- Page 74 and 75: Chapter 3 Structured Cable Field Ca
- Page 76 and 77: Chapter 3 Structured Cable Field Ca
- Page 78 and 79: Chapter 3 Structured Cable Field Ca
- Page 80 and 81: Chapter 3 Structured Cable Field Ca
- Page 82 and 83: CHAPTER 4 COAX CABLE FIELD CALIBRAT
- Page 84 and 85: Chapter 4 Coax Cable Field Calibrat
- Page 86 and 87: CHAPTER 5 FIBER OPTICS CABLE FIELD
- Page 88 and 89: Chapter 5 Fiber Optics Cable Field
- Page 90 and 91: Chapter 5 Fiber Optics Cable Field
- Page 92 and 93: Chapter 5 Fiber Optics Cable Field
- Page 94 and 95: Chapter 5 Fiber Optics Cable Field
- Page 96 and 97: Chapter 5 Fiber Optics Cable Field
Chapter 3<br />
Structured Cable Field Calibration and Testing<br />
Step 3<br />
‣ Remove the RJ45 mini patchcord from the RH and the hybrid patchcord.<br />
‣ With the DH hybrid patchcord open-ended, select START from the DH Field<br />
Calibration screen to perform the third calibration process.<br />
Step 4<br />
‣ Re-connect the RJ45 plug of the first hybrid patchcords to the Remote Handset<br />
(RH).<br />
‣ With the RH hybrid patchcord open-ended, press AUTOTEST from the RH to<br />
perform the fourth calibration process. Upon completion of the calibration<br />
process, the <strong>LANTEK</strong> handsets and the hybrid patchcords are ready for use in<br />
testing cables.<br />
FIELD CALIBRATION - BLOCK TESTING 66/110/BIX<br />
This Field Calibration is a 4-step process. Steps 1 and 2 are performed with a<br />
patchcord connected to the Handsets. Steps 3 and 4 are performed with open-ended<br />
patchcords (only one end connected to each Handset).<br />
For Block 66 Systems<br />
The RJ45 block calibration adapters connected to the block during calibration is either<br />
the T568A or 568B RJ45/66 Block adapter. The T568A adapter is used with patchcords<br />
connected in a TIA-568A configuration. The T568B adapter is used with patchcords<br />
connected in a TIA-568B configuration. Both block adapters have the standard RJ45<br />
plug at the opposite end.<br />
3-6