22.12.2013 Views

LANTEK User Manual - Ideal Industries

LANTEK User Manual - Ideal Industries

LANTEK User Manual - Ideal Industries

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 2<br />

Test Setup Procedures<br />

Saving in TIA/EIA 606A Format<br />

1. Once the Enable 606A selection process has been completed, press AUTOTEST to<br />

begin.<br />

Note: <strong>LANTEK</strong> uses the Standards format to apply identification to the cables and<br />

their infrastructure relationship.<br />

2. At completion of the Autotest activity, select one of three cable parameters (Drop,<br />

Backbone or Backbone Pair) to set the cable name for saving the results. Cable<br />

naming can be completed using the Auto Increment feature or manually.<br />

Figure 2-19: TIA 606A Cable Parameter Screens<br />

3. Press ENTER to save the cable name and results or ESCAPE to exit.<br />

4. If Enable 606A is selected in the Autotest Preference, then a 606A Standards Cable<br />

parameter can be edited by pressing F1 or selecting the Cable ID on the DH Ready<br />

Screen.<br />

DUALMODE<br />

The DUALmode TM feature on the <strong>LANTEK</strong> is designed to provide both Permanent Link<br />

and Channel Link test results in about the same time that it would take to do each<br />

Autotest separately. For Category 6, that means both Channel and Permanent Link<br />

results are obtained and stored in about 20 seconds.<br />

Based on the patent-pending technique that <strong>LANTEK</strong> uses to produce Permanent Link<br />

results, the dual mode adapters physically resemble Channel Adapters and patchcords<br />

that gather both phase and magnitude data for the full channel. The <strong>LANTEK</strong> Cable<br />

Certifier process removes the patchcords losses and signal reflections to produce<br />

Permanent Link results. The DUALmode function saves the results in two separate<br />

records.<br />

Other significant tests can be performed under the DUALmode process. For example,<br />

consider the case where you, the installer, have a job to install a Category 6 class<br />

system in a government installation in a country that uses an ISO-based National<br />

Standard. You use cable and connectivity manufactured by a US-based company. The<br />

government may require the installer to certify the ISO-based CLASS E standard but<br />

the US Company may require certification to the TIA 568 Category 6 Standard in order<br />

to issue a warranty. Previously, this might have required running both ISO and TIA<br />

certifications and passing the increased costs to your client, the buyer. But with<br />

DUALmode, certifications to ISO CLASS E Permanent Link and TIA 568B Category 6<br />

can be performed at the same time with no more effort than running only one test.<br />

2-14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!