Hilton London Metropole Deluxe Plus Rooms Refurbishment 2010
Hilton London Metropole Deluxe Plus Rooms Refurbishment 2010
Hilton London Metropole Deluxe Plus Rooms Refurbishment 2010
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
A Facelift for <strong>London</strong>’s Largest Double Double <strong>Rooms</strong><br />
• We are investing £1.8m in the refurbishment of our <strong>Hilton</strong> <strong>Deluxe</strong> <strong>Plus</strong><br />
bedrooms and public areas in the hotel’s West Wing.<br />
• 111 out of 340 <strong>Hilton</strong> <strong>Deluxe</strong> <strong>Plus</strong> rooms on 3 floors (11 th , 12 th and 13 th<br />
floor) with will get a complete makeover.<br />
• Starting 8 th March <strong>2010</strong><br />
• Planned finish: June <strong>2010</strong><br />
• The refurbishment will be carried out floor by floor to minimise disruption.