2008-09 Annual Report - Harford County Public Schools
2008-09 Annual Report - Harford County Public Schools
2008-09 Annual Report - Harford County Public Schools
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Improvements<br />
The image to the left features a rendering<br />
of the new Edgewood High School.<br />
Construction, pictured below, for the<br />
project began in <strong>2008</strong>. The replacement<br />
Edgewood High is a four story structure<br />
that is being constructed behind the<br />
existing school. This approximately<br />
268,000 square foot building will have<br />
current technology, a triple gymnasium,<br />
auditorium, and designated space for<br />
the International Baccalaureate Diploma<br />
Programme. The complex provides for<br />
EDGEWOOD HIGH SCHOOL<br />
a new stadium with an artificial<br />
turf field. The new high school is<br />
scheduled to open in the fall of<br />
2010, and the existing high school<br />
is scheduled to be demolished. The<br />
site will be restored with additional<br />
parking and practice fields with final<br />
completion in 2011.<br />
DEERFIELD ELEMENTARY SCHOOL<br />
The image to the right features<br />
a rendering of the new Deerfield<br />
Elementary School. The construction<br />
site of the new school is pictured below.<br />
The replacement Deerfield Elementary<br />
is a two story structure that is also being<br />
constructed behind the existing school.<br />
This approximately 102,000 square foot<br />
building will have current technology,<br />
an enlarged gymnasium, and a stage<br />
that is between both the cafeteria and<br />
the gymnasium.<br />
The new school will have its own music rooms, art<br />
room, and computer lab. The school will also feature<br />
space that is designated as a day care for non-school<br />
age children. The enlarged gymnasium is made possible<br />
through a partnership with Parks and Recreation,<br />
who have added $600,000 to this project. The new<br />
elementary school is scheduled to open in the fall of<br />
2010, and the existing elementary is scheduled to be<br />
demolished. The site will be restored with additional<br />
parking and a bus loop with final completion in 2011.<br />
DECEMBER 20<strong>09</strong> | BOE 15