Improvements<br />

The image to the left features a rendering<br />

of the new Edgewood High School.<br />

Construction, pictured below, for the<br />

project began in <strong>2008</strong>. The replacement<br />

Edgewood High is a four story structure<br />

that is being constructed behind the<br />

existing school. This approximately<br />

268,000 square foot building will have<br />

current technology, a triple gymnasium,<br />

auditorium, and designated space for<br />

the International Baccalaureate Diploma<br />

Programme. The complex provides for<br />

EDGEWOOD HIGH SCHOOL<br />

a new stadium with an artificial<br />

turf field. The new high school is<br />

scheduled to open in the fall of<br />

2010, and the existing high school<br />

is scheduled to be demolished. The<br />

site will be restored with additional<br />

parking and practice fields with final<br />

completion in 2011.<br />

DEERFIELD ELEMENTARY SCHOOL<br />

The image to the right features<br />

a rendering of the new Deerfield<br />

Elementary School. The construction<br />

site of the new school is pictured below.<br />

The replacement Deerfield Elementary<br />

is a two story structure that is also being<br />

constructed behind the existing school.<br />

This approximately 102,000 square foot<br />

building will have current technology,<br />

an enlarged gymnasium, and a stage<br />

that is between both the cafeteria and<br />

the gymnasium.<br />

The new school will have its own music rooms, art<br />

room, and computer lab. The school will also feature<br />

space that is designated as a day care for non-school<br />

age children. The enlarged gymnasium is made possible<br />

through a partnership with Parks and Recreation,<br />

who have added $600,000 to this project. The new<br />

elementary school is scheduled to open in the fall of<br />

2010, and the existing elementary is scheduled to be<br />

demolished. The site will be restored with additional<br />

parking and a bus loop with final completion in 2011.<br />

DECEMBER 20<strong>09</strong> | BOE 15