23.11.2013 Views

PIANC E-Magazine - PIANC AIPCN welcome

PIANC E-Magazine - PIANC AIPCN welcome

PIANC E-Magazine - PIANC AIPCN welcome

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ON THE CALENDAR<br />

NEWS FROM THE NAVIGATION COMMUNITY<br />

by Trelleborg Marine Systems met<br />

the requirements of both parties: the<br />

port authorities wanted a reliable solution,<br />

with a long life cycle. For the<br />

contractor, an important factor was<br />

the necessity of an accessible dedicated<br />

project management team,<br />

and the assurance of high quality<br />

aftercare.<br />

The fenders supplied by Trelleborg<br />

are fully compliant with <strong>PIANC</strong>’s<br />

2002 ‘Guidelines for the design of<br />

fender systems’. They have undergone<br />

both laboratory and full scale<br />

product testing and, as a manufacturing<br />

company, Trelleborg are able<br />

to deliver assurance that the products<br />

meet their stated performance<br />

characteristics and provide the high<br />

levels of aftercare and maintenance<br />

that the contractor required.<br />

Hannah Leyland<br />

PR Account Manager IAS<br />

b2b Marketing<br />

CUBA<br />

Container Terminal<br />

Mariel<br />

A new Container Terminal is being<br />

built by the government of Cuba, in<br />

Mariel City, 45 km west of Havana.<br />

The new Terminal will be operated<br />

by PSA.<br />

The first phase of the terminal with<br />

a capacity of 1 million TEU per year<br />

will have a 700 m long quay to accommodate<br />

ships with 15.5 m draft.<br />

The contract for the construction has<br />

been awarded to the Joint Venture<br />

Quality/COI – Companhia de Obras<br />

e Infraestrutura. The detailed design<br />

for the port complex, as well as the<br />

construction methodology are being<br />

performed by EXE Engenharia, Curitiba,<br />

Brazil.<br />

Rubens Sabino<br />

Ederson Lucas Garrett<br />

EXE Engenharia Brazil<br />

Aerial view of Mariel Bay<br />

Mariel Cuba Terminal<br />

– First phase<br />

49<br />

<strong>PIANC</strong> E-<strong>Magazine</strong> n° 144, November/novembre 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!