Stage 6:<br />

Complete double layer 1-3 t rock<br />

Stage 9: Completed 7 m wide 800 mm deep<br />

concrete roadway<br />

Construction between Ch 96 m and Ch 126 m<br />

consisted of Stage 6 and Stage 8 only.<br />

9. QUALITY CONTROL<br />

Strict quality control on all concrete and rock was<br />

imposed throughout the project. In addition, all existing<br />

1-3 t rock was salvaged and reused. Quality<br />

control on rock was performed:<br />

• At the quarry<br />

• On site<br />

Stage 7:<br />

Stitchcast parapet walls to concrete roadway<br />

The quarry was located approximately 120 km<br />

from the site of works. This was the closest quarry<br />

to produce 4-6 t rock of this quantity, strength and<br />

size.<br />

The table below indicates indices tested for, specification<br />

requirements of the indices, as well as actual<br />

test results averages obtained.<br />

Stage 8:<br />

Complete single layer 4-6 t rock<br />

1.5 m high drop test. Steel plate on crushed rock.<br />