5. DESIGN BASED ON FAILURE<br />

MECHANISM 1<br />

As mentioned above, at this point in time it was<br />

believed the only failure mechanism was Failure<br />

Mechanism 1. Design of the breakwater repairs<br />

by WSP Africa Coastal Engineers based in South<br />

Africa, combined with budgeting constraints imposed<br />

by the client led to the following:<br />

Ch 66 m to Ch 96 m (30 m length)<br />

• Demolish the affected 30 m section of concrete<br />

roadway.<br />

• Replace lost core with 10-500 kg core material.<br />

(The original 0-10 kg fragment of the 0-500 kg<br />

size range was omitted in the tender design to<br />

comply to filter rules).<br />

• Rebuild concrete roadway to 800 mm thick.<br />

(The original structure was 500 mm thick).<br />

• Rebuild 1-3 t double layer rock profile to original<br />

2V:3H lines and levels by using existing rock<br />

and importing the shortfall (if any).<br />

• Overlay the 1-3 t double layer rock armour with<br />

a single layer 4-6 t rock armour to 2V:3H slope.<br />

Ch 96 m and Ch 126 m (30 m length)<br />

• Rebuild 1-3 t double layer rock profile to original<br />

2V:3H lines and levels by using existing rock<br />

and importing the shortfall (if any).<br />

<strong>PIANC</strong> E-<strong>Magazine</strong> n° 144, November/novembre 2011 14