www.kuk.de<br />

PPP Eastern Region<br />

<strong>Package</strong> 1, <strong>Project</strong> Y<br />

<strong>Vienna</strong> (Austria)<br />

Owner<br />

ASFINAG / Bonaventura<br />

Straßenerrichtungs GmbH<br />

Client<br />

Hochtief Construction AG /<br />

PPP <strong>Ostregion</strong> consortium<br />

Opject planner<br />

Y-ZT GmbH and Bernhard<br />

Ingenieure<br />

Construction period<br />

From February 2007 (3 years)<br />

Construction costs<br />

Ca. 850 million EUR<br />

Road construction work on the A 5 in the Münichsthal area<br />

The objective of <strong>Project</strong> Y is to reduce the<br />

traffic burden on the communities surrounding<br />

north-east <strong>Vienna</strong>. It consists of<br />

a north-south connection with the Czech<br />

Republic (A 5 South, motorway section<br />

Schrick - Eibesbrunn) and an east-west<br />

route around <strong>Vienna</strong> (S1 and S2 expressways,<br />

Korneuburg - Süßenbrunn<br />

section).<br />

In the area of the A 5 South, the capacity<br />

of the existing B 7 road is already exhausted<br />

by very high levels of truck traffic<br />

Knoten<br />

Korneuburg<br />

Anschlussstelle<br />

Leobensdorf<br />

Anschlussstelle<br />

Korneuburg Nord<br />

Stetten<br />

Flandorf<br />

Anschlussstelle<br />

Wilfersdorf Süd<br />

Anschlussstelle<br />

Schrick<br />

Anschlussstelle<br />

Wolkersdorf Süd<br />

Halbanschlussstelle<br />

Gaweinstal Mitte<br />

Bogenneusiedel<br />

Mistelbach B 40<br />

Wolfpassing<br />

Traunfeld<br />

Anschlussstelle<br />

Hochleithen<br />

Enzersfeld Großebersdorf<br />

Korneuburg S 1<br />

B 3<br />

A 22<br />

Halbanschlussstelle<br />

Gaweinstal Nord<br />

Königsbrunn<br />

B 7<br />

Ulrichskirchen<br />

Knoten<br />

Eibesbrunn<br />

Anschlussstelle<br />

Hagenbrunn<br />

B 7<br />

B 40<br />

Höbersbrunn<br />

Pellendorf<br />

A 5<br />

Ulrichskirchen<br />

Wolkersdorf<br />

Eibesbrunn<br />

S 1<br />

S 1<br />

B 7<br />

B 46<br />

A 5<br />

Schrick<br />

Gaweinstal<br />

Kollnbrunn<br />

Anschlussstelle<br />

Wolkersdorf Nord<br />

Halbanschlussstelle<br />

Anschlussstelle<br />

Bad Pirawarth<br />

Seyring<br />

B 8<br />

B 8<br />

B 220<br />

and all relevant studies forecast further<br />

major increases in traffic volumes.<br />

<strong>Project</strong> Y (PPP Eastern Region, <strong>Package</strong><br />

1) is Austria's first PPP road infrastructure<br />

project.<br />

The motorways and expressways all have<br />

at least 4 traffic lanes with hard shoulders<br />

and concrete road surfaces.<br />

The locations of the intersections and<br />

junctions were determined by the Austrian<br />

Federal Ministry for Traffic, Innovation<br />

and Technology and ASFINAG, a publicly<br />

owned company for the financing of<br />

motorways and express ways.<br />

The task of the PPP <strong>Ostregion</strong> consortium<br />

is to plan and construct the entire <strong>Project</strong><br />

Y on behalf of the concessionaire.<br />

The concessionaire also took on the operation<br />

of the project for 30 years and its fi-<br />

Heavy earth-moving work<br />

Central construction office in<br />

Großebersdorf<br />

Cross-section of the A 5<br />

North motorway<br />

Wien<br />

B 8<br />

B 227<br />

S 2<br />

Overview of the project<br />

Süßenbrunn<br />

Anschlussstelle<br />

B 8<br />

S 1<br />

Eastern portal of Tradenberg Tunnel<br />

1/2


www.kuk.de<br />

PPP Eastern Region<br />

<strong>Package</strong> 1, <strong>Project</strong> Y<br />

<strong>Vienna</strong> (Austria)<br />

Korneuburg West / Leobendorf junction<br />

nancing. As part of the PPP project, the<br />

PPP <strong>Ostregion</strong> consortium took over responsibility<br />

for risks in connection with<br />

planning, subsoil, quality, costs and schedules.<br />

The very short time available for planning,<br />

authorization and completion of the<br />

construction work represented a major<br />

challenge.<br />

The construction companies' need to optimize<br />

the construction procedures and to<br />

find cost-effective solutions for the required<br />

civil engineering structures and traffic<br />

routes was closely interlinked with the<br />

functional requirements for the operational<br />

phase.<br />

To support the planning process, a planning<br />

and document management system<br />

was set up through which all information<br />

and documentation could be accessed.<br />

During the tender phase, Krebs und Kiefer<br />

took on the role of Technical Advisor<br />

and advised the banks behind a consortium<br />

of bidders. Today we can confirm that<br />

Krebs und Kiefer assessed the risks accurately<br />

and that our technical competence<br />

in PPP infrastructure projects enabled<br />

us to provide effective support for the<br />

coordination of planning work within the<br />

PPP <strong>Ostregion</strong> consortium.<br />

Tank construction-foundation slab anchored<br />

against uplift by tension piles<br />

<strong>Project</strong> data<br />

Traffic route:<br />

- 51 km long<br />

- Standard cross-section<br />

2 traffic lanes in each direction,<br />

hard shoulder throughout<br />

- 11 junctions,<br />

- 2 single-direction junctions<br />

- 2 intersections<br />

- 3-years construction period<br />

Civil engineering structures:<br />

- 76 bridges<br />

- 4 tunnels, total length 7,4 km<br />

- 18 tank constructions<br />

- 25 basins with 42 pumping<br />

stations<br />

- 81 km of noise protection<br />

measures<br />

- 2 service stations with a total<br />

of 400 parking spaces for<br />

cars and 260 for trucks<br />

- 1 central operations building<br />

Personnel deployment:<br />

- On average, 1,000 to 1,500<br />

people plus 130 planning<br />

personnel, ca. 11,000 drawings<br />

Construction work:<br />

- Earth moved: 9,000,000 m³<br />

- Reinforced<br />

concrete: 1,600,000 m³<br />

- Concrete road<br />

surface: 1,100,000 m³<br />

- Noise protection: 50,000 m³<br />

Earth-moving equipment:<br />

- Peak value of up to 360<br />

heavy machines in 2007<br />

Krebs und Kiefer services<br />

- Planning coordination for<br />

road construction<br />

- Monitoring of plan processing<br />

and planning of costeffective<br />

civil engineering<br />

structures<br />

- Statements on optimization<br />

measures and changes to<br />

planning<br />

- Obtaining permissions and<br />

approvals of plans<br />

- Clarification of unfounded<br />

planning objections from<br />

checking engineers<br />

Heavy earth-moving work<br />

Environmental tunnel at Stetten<br />

2/2