GE Consumer & Industrial - G E Power Controls
GE Consumer & Industrial - G E Power Controls
GE Consumer & Industrial - G E Power Controls
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Fig. 55-4 Unscrew all the plugs from control boards<br />
Fig. 55-7 Pay attention, that no cables will be pinched<br />
between box and front cover during closing!<br />
Fig. 55-5 Pull out the plugs of the control boards. Pull out<br />
selected control board. Insert new control board<br />
<br />
Listen that both, the isolation plate at the side of<br />
equipment and the isolation plate at the side of<br />
soldering, were inserted!<br />
Fig. 55-8 Carefully replace the control box front cover and<br />
attach the with the four screws<br />
<br />
Put on plugs X2…X6, fix the screws of the plugs and<br />
switch on control voltage.<br />
Checking the breaker:<br />
<br />
Open and Close the breaker 3 times while it is<br />
disconnected from the system (in the “Test-position“ of<br />
the draw out version/the installation). The breaker must<br />
open and close without a time delay over 400 ms.<br />
<br />
If the test succeeds, reconnect the breaker to the main<br />
circuit.<br />
Fig. 55-6 Plug in all control plugs and tighten it by the<br />
screws.<br />
2012-11-21 S47183R01E06 Design and specifications are subject to change without notice 47