16.11.2013 Views

GE Consumer & Industrial - G E Power Controls

GE Consumer & Industrial - G E Power Controls

GE Consumer & Industrial - G E Power Controls

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fig. 55-4 Unscrew all the plugs from control boards<br />

Fig. 55-7 Pay attention, that no cables will be pinched<br />

between box and front cover during closing!<br />

Fig. 55-5 Pull out the plugs of the control boards. Pull out<br />

selected control board. Insert new control board<br />

<br />

Listen that both, the isolation plate at the side of<br />

equipment and the isolation plate at the side of<br />

soldering, were inserted!<br />

Fig. 55-8 Carefully replace the control box front cover and<br />

attach the with the four screws<br />

<br />

Put on plugs X2…X6, fix the screws of the plugs and<br />

switch on control voltage.<br />

Checking the breaker:<br />

<br />

Open and Close the breaker 3 times while it is<br />

disconnected from the system (in the “Test-position“ of<br />

the draw out version/the installation). The breaker must<br />

open and close without a time delay over 400 ms.<br />

<br />

If the test succeeds, reconnect the breaker to the main<br />

circuit.<br />

Fig. 55-6 Plug in all control plugs and tighten it by the<br />

screws.<br />

2012-11-21 S47183R01E06 Design and specifications are subject to change without notice 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!