16.11.2013 Views

El Salvador - GFDRR

El Salvador - GFDRR

El Salvador - GFDRR

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

VI. ESTIMATE OF RECOVERY AND RECONSTRUCTION NEEDS | 131<br />

Sector Activity or intervention Emergency Recovery<br />

Reconstruction<br />

Risk<br />

reduction Total<br />

Water and<br />

sanitation<br />

1.30 0.74 1.35 3.39<br />

Temporary water supply<br />

Institutional strengthening<br />

2,000 sanitary latrines<br />

200 water wells<br />

Solid waste management<br />

Mapping of water and<br />

sanitation networks<br />

<strong>El</strong>ectricity 1.32 1.32<br />

Prevention, mitigation in<br />

transmission 1.32<br />

Transportation 22.60 89.30 7,000 181.90<br />

0.80<br />

0.50<br />

0.50<br />

0.24<br />

1.00<br />

0.35<br />

Income<br />

generation<br />

Temporary bridges<br />

Rehab. Roads<br />

Prevention study<br />

Rehabilitation and<br />

reconstruction<br />

Bridges<br />

Protection of slopes<br />

Dinero por Trabajo (Money for<br />

Work) Program<br />

12.00<br />

10.60<br />

2.00<br />

87.30<br />

70.00<br />

18.40 18.40<br />

Total 105.94 148.93 90.42 343.97<br />

Source: Prepared by assessment mission.<br />

18.40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!