Step 2<br />

REQUIRED EQUIPMENT AND MATERIAL<br />

GENERAL<br />

1. Stakes, string and string level for alignment.<br />

2. Measuring tape & level.<br />

3. Torque wrench.<br />

4. Masking tape or duct tape.<br />

5. 2 to 4 lengths of rope 50' or longer.<br />

6. Hacksaw<br />

7. 1 1/8" wrench<br />

8. Ladder, movable scaffolding or platform lift.<br />

9. Optional - power wrench, transit (available from a rental store).<br />

BUILDINGS OVER 140'<br />

1. Caulking gun.<br />

SURFACE MOUNT - concrete<br />

1. Drill.<br />

2. Minimum 3/8" x 6" anchor bolts - 4 per base plate.<br />

3. Concrete drill bit sized to install anchor bolts.<br />

SURFACE MOUNT - other<br />

1. 8" X 8" base plate - 2 per arch.<br />

2. 42" stakes and or earth anchors - according to soil conditions.<br />

3. Sledge hammer<br />

POST MOUNT<br />

1. Drill.<br />

2. 11/16" wood drill bit.<br />

3. Minimum 8" x 8" x 8' treated posts<br />

4. Post hole auger - minimum 12" diameter.<br />

5. Minimum 3/8" x 5" lag bolts - 4 per base.<br />

6. Drill bit to install lag bolts<br />

7. Crushed rock or concrete to set posts.<br />

8. Two (2) pieces of 5/8" (minimum) rebar, 12" long for each post.<br />

9. Depending on mount type - dimensional lumber to span posts 2 x building length.<br />

See STEP 7 and STEP 8 on Page 9.<br />

THESE MATERIALS ARE FOR A 4 FOOT (48") POST. IF YOUR POST IS A DIFFERENT<br />

HEIGHT YOU WILL NEED TO ADJUST MATERIALS ACCORDINGLY.<br />

SEE APPENDIX B, PAGE 24 FOR MATERIALS AND CONSTRUCTION<br />

OF VENTILATED AND NON-VENTILATED SIDE WALLS.<br />

4<br />

Q205.1.1