16.11.2013 Views

INSTALLATION MANUAL

INSTALLATION MANUAL

INSTALLATION MANUAL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B - SIDE VENTILATION - for Livestock purposes:<br />

1. 2" x 4" dimensional lumber to use as strapping for outside edging and to mount the<br />

deflector board.<br />

2. Deflector board - strips of plywood or OSB board (chipboard) 8' x 2' wide extending the<br />

full length of the sides of the building. (1/2" thick recommended).<br />

3. 2 3/8" U-bolts or 1/4" self-drilling screws to secure the deflector board.<br />

4. Installation of the side ventilation deflector board to allow proper deflection of air.<br />

a) Fasten a row of 2” x 4” dimensional lumber onto the arches approximately 2’<br />

above the top of the posts. Use U-bolts or 1/4" self-drilling (Tek) bolts. Drill an<br />

oversize hole through the wood to install self-drilling bolts.<br />

b) Fasten 8’ strips of 2’ wide plywood or OSB board to the row of 2” x 4”s and the<br />

top of the inside wall.<br />

Hint:<br />

You may want to screw the deflector board pieces on so that they can be easily<br />

removed in summer for increased ventilation.<br />

25<br />

Q205.1.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!