16.11.2013 Views

INSTALLATION MANUAL

INSTALLATION MANUAL

INSTALLATION MANUAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Step 20<br />

SECURE THE APRON<br />

The fabric is designed to be under tension at all times.<br />

GROUND<br />

Use dimensional lumber in the LOWER fastening pipe pocket to attach the<br />

apron to the frame or foundation or back fill the apron at the foundation.<br />

WALL<br />

Attach a dimensional lumber buffer to protect the cover from protruding edges.<br />

CONCRETE<br />

Never install fabric over concrete edges.<br />

Always install a dimensional lumber buffer or equivalent.<br />

Step 21<br />

READ MAINTENANCE AND SUBMIT WARRANTY<br />

APPENDIX A<br />

BUILDINGS OVER 140’ IN LENGTH<br />

Multiple covers are provided for buildings over 140' in length. This enables ease of onsite<br />

handling and installation. Normally covers are supplied in equal<br />

or near equal lengths. The longest cover length is 140'.<br />

Eg. - a 150' building with 5' spacing is supplied with one 80' and one 70' cover.<br />

1. FOUNDATION<br />

Foundation spacing (running measurement) is the same for the entire length of the<br />

building. (the covers share a common arch)<br />

Eg. - 150' building on 5' centers has 31 base plates on each side.<br />

2. JOINER BRACKET<br />

1. WALL<br />

Install a joiner bracket to the common arch. The bracket<br />

installs under the lashing winch on the threaded rod.<br />

Add an end flap ratchet to each end of the joiner bracket<br />

using 5/8" x 2" bolts and nuts.<br />

22<br />

Q205.1.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!