Step 14<br />
INSTALL THE COVER FASTENING PIPES<br />
NOTE: Install both fastening pipes before installing the cover.<br />
1. Install an end cap on the<br />
straight end of one length<br />
of 2 3/8" dia. swaged pipe.<br />
2 Insert the fastening pipe,<br />
end cap first, into the pipe<br />
pocket.<br />
3. Add lengths of swaged<br />
fastening pipe as required.<br />
4. Use 1/4" x 1" self-drilling<br />
bolts to fasten the pipes<br />
together.<br />
5. Wrap joint with duct tape.<br />
6. On completion, some of<br />
the pipe may be exposed.<br />
7. Cut to length if necessary.<br />
8. Cap the end of the pipe.<br />
Hint: If your building has been<br />
supplied with different<br />
length fastening pipes<br />
install equal lengths on<br />
each side. A measured<br />
cut may be required on<br />
each side.<br />
Step 15<br />
INSTALL THE COVER<br />
NOTE: DO NOT install the DURAWEAVE TM cover onto the frame of your building in high<br />
wind conditions. A slight breeze is the most advantageous for cover installation.<br />
To take advantage of the breeze, pull cover up over the arches with the breeze<br />
blowing into the cover . . . like a sail filled with air.<br />
1. Insert the fastening straps in<br />
the lashing winches.<br />
Feed both ends of the straps<br />
into the winch.<br />