Figure 5.4 Types <strong>of</strong> Houses<br />
BUILT WITH RECYCLED MATERIALS<br />
Such houses—76 percent <strong>of</strong> the total— had no lighting or<br />
sanit<strong>at</strong>ion services.<br />
PRE-FABRICATED HOUSES—2 percent <strong>of</strong> the total<br />
SIMPLE MASONRY HOUSES—5 percent <strong>of</strong> the total. These<br />
are typically built with trussed stonework without a structure<br />
(to <strong>at</strong>tach to), cyclops found<strong>at</strong>ions, and a found<strong>at</strong>ion beam to<br />
support possible add-ons.<br />
ONE-FLOOR ARCADE MASONRY—15 percent <strong>of</strong> the total<br />
TWO-FLOOR ARCADE MASONRY—1 percent <strong>of</strong> the total. Built as a vertical (pillars) and horizontal (beams) structure.<br />
Confined Cyclops cement with concrete structures—the traditional building system.<br />
Source: District Habit<strong>at</strong> Secretari<strong>at</strong> – Comprehensive <strong>Resettlement</strong> Inform<strong>at</strong>ion System, 2008<br />
Chapter 5 Nueva Esperanza: A <strong>Resettlement</strong> Case with <strong>Risk</strong> Management and Land Use Planning Approach | Colombia |<br />
71