15.11.2013 Views

Preventive Resettlement of Populations at Risk of Disaster - GFDRR

Preventive Resettlement of Populations at Risk of Disaster - GFDRR

Preventive Resettlement of Populations at Risk of Disaster - GFDRR

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.10 Use Made <strong>of</strong> Reclaimed<br />

Flood-risk Land<br />

Land <strong>at</strong> risk <strong>of</strong> flooding was reclaimed for public use.<br />

Municipalities issued laws th<strong>at</strong> prohibited any new permanent<br />

or temporary occup<strong>at</strong>ion <strong>of</strong> the land, or subdividing<br />

it. The land was design<strong>at</strong>ed as a flood-risk area<br />

and earmarked for public green space, and the local<br />

governments were committed to clean it, plant trees, install<br />

the equipment needed, maintain and manage the<br />

areas. The laws also st<strong>at</strong>ed th<strong>at</strong> any future use would<br />

have to comply with urban environmental sustainability<br />

standards—so as to improve living conditions. The<br />

following photographs illustr<strong>at</strong>e how the land was used<br />

once the families were resettled.<br />

5. Outcomes<br />

The housing component was a model for the ways th<strong>at</strong><br />

institutions can respond; it involved well-coordin<strong>at</strong>ed<br />

particip<strong>at</strong>ion <strong>at</strong> the n<strong>at</strong>ional, provincial and municipal<br />

levels, as well as <strong>of</strong> the families affected by flooding. It<br />

fostered decentralized execution, local practices, institutional<br />

capacity building and community development.<br />

5.1 Quantit<strong>at</strong>ive Outcomes<br />

In the course <strong>of</strong> the PPI, 5,636 houses were built in seven<br />

provinces, as listed in Figures 3.5 and 3.6.<br />

Figure 3.5. Houses Built by Province<br />

Santa Fe<br />

1,183<br />

Buenos Aires<br />

577<br />

Misiones<br />

586<br />

Formosa<br />

609<br />

Entre Ríos<br />

353<br />

Chaco<br />

1,312<br />

Corrientes<br />

1,016<br />

Source: Based on d<strong>at</strong>a in the Report <strong>of</strong> the PPI. Zelmeister. 2009.<br />

The three housing components (PREI, PPI, El Niño)<br />

involved 120 municipalities <strong>of</strong> varying sizes, strengthening<br />

their institutional capacities, constructing 11,911<br />

houses and 19 multiple-use facilities, and training<br />

23,822 people in construction techniques.<br />

An external evalu<strong>at</strong>ion by the Intern<strong>at</strong>ional Institute<br />

for Environment and Development, L<strong>at</strong>in America section-IIED-LA<br />

(Clemente, Bertolotto, Del Valle, 2003),<br />

conducted two years after the houses were completed<br />

showed the degree to which the living conditions <strong>of</strong> the<br />

popul<strong>at</strong>ion were improved; this was assessed through<br />

indic<strong>at</strong>ors th<strong>at</strong> measured families’ perceptions <strong>of</strong> the<br />

new habit<strong>at</strong>, <strong>of</strong> learning a new trade th<strong>at</strong> could affect<br />

their income gener<strong>at</strong>ion capacity, and the role <strong>of</strong> selfconstruction<br />

in boosting beneficiary organiz<strong>at</strong>ion.<br />

38 <strong>Preventive</strong> <strong>Resettlement</strong> <strong>of</strong> <strong>Popul<strong>at</strong>ions</strong> <strong>at</strong> <strong>Risk</strong> <strong>of</strong> <strong>Disaster</strong>: Experiences from L<strong>at</strong>in America

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!