15.11.2013 Views

Marine Ecosystems Research Department - jamstec japan agency ...

Marine Ecosystems Research Department - jamstec japan agency ...

Marine Ecosystems Research Department - jamstec japan agency ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

JAMSTEC 2002 Annual Report<br />

<strong>Research</strong> Support <strong>Department</strong><br />

(Ocean Bottom Seismometer) deployment (Nankai<br />

Trough) one mission for eight days; DEEP TOW<br />

operations (Mariana sea area) one mission for <br />

days; heat flow measurement and piston core (Sagami<br />

Bay, Nankai Trough) one mission for days; and<br />

multichannel seismic reflection tests (Suruga Bay) <br />

one mission for days. On May , KAIYO<br />

was open to the general public and took some visitors<br />

on a short cruise around Yokosuka Port as a part of the<br />

JAMSTEC open day at Yokosuka Headquarters.<br />

From May to June , KAIYO underwent<br />

a statutory routine inspection at the Yura Works of<br />

Mitsui Engineering & Shipbuilding Co. Ltd. during<br />

which checks and maintenance were carried out on the<br />

various systems and equipment.<br />

() YOKOSUKA<br />

YOKOSUKA undertook missions and was at sea<br />

for a total of days. Figure shows the operational<br />

areas. A breakdown of YOKOSUKA missions are:<br />

SHINKAI operations five missions for a total<br />

of days; URASHIMA sea trials (Suruga Bay) <br />

two mission for a total of days; UROV-K operations<br />

(Izu-Ogasawara) one mission for days; and<br />

independent YOKOSUKA operations three missions<br />

for a total of days.<br />

Independent research operations consisted of:<br />

Monitoring the dynamics of Japanese coastal currents<br />

and elucidating the mechanisms of change (Nansei<br />

Islands and the continental slope of the East China<br />

Sea) one mission for days; Submarine earthquake<br />

observation in the French Polynesia region<br />

(French Polynesia sea area) one mission for <br />

days; and Quasi-normals of meteorological elements<br />

(Okino Torishima) one mission for days.<br />

From April to May , YOKOSUKA underwent<br />

a statutory routine inspection at the Kobe<br />

Shipyard and Machinery Works of Kawasaki Heavy<br />

Industries, Ltd. during which checks and maintenance<br />

were carried out on the various systems and equipment.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Fig. 3 M/V YOKOSUKA Cruise Tracks, FY02<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

206

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!