energize oil & gas – issue 01-2013 - GL Group
energize oil & gas – issue 01-2013 - GL Group
energize oil & gas – issue 01-2013 - GL Group
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Integrity<br />
Management Software<br />
<strong>GL</strong> Noble Denton’s Galiom, an integrated environment<br />
for risk-based asset management of<br />
offshore and onshore facilities, supports essential<br />
integrity management (IM) processes:<br />
Risk assessment and IM planning<br />
Inspection, monitoring and testing<br />
Integrity assessment<br />
Mitigation, intervention and repair<br />
Management of change<br />
Back-up. The Easington terminal processes <strong>gas</strong> for the Rough storage facility.<br />
Integrity dashboard<br />
Galiom benefits<br />
Delivers improved visibility of asset criticality,<br />
risk and technical integrity<br />
Identifies the likelihood and consequences of<br />
failures to mitigate major accident risks<br />
Allows operators to benefit from optimised<br />
inspection schedules cutting maintenance,<br />
downtime and inspection costs<br />
Demonstrates compliance with management<br />
procedures<br />
Predicts equipment life and inspection dates<br />
using corrosion rates and asset criticality<br />
Improves decision-making on<br />
repair, replacement and<br />
decommissioning<br />
Highlights operating integrity<br />
<strong>issue</strong>s and can guide a proactive<br />
inspection and maintenance<br />
methodology<br />
GALIOM TM .<br />
Asset integrity<br />
management<br />
(AIM)<br />
software for<br />
operational<br />
risk and<br />
integrity<br />
management.<br />
Outcome and Benefit<br />
Through the successful completion of the project, <strong>GL</strong> Noble<br />
Denton has enabled CSL to:<br />
Commence production from the York field within their<br />
specified programme by ensuring that the Written<br />
Schemes of Examination were prepared and delivered<br />
within the agreed timescales<br />
Implement an RBI methodology tailored to their requirements,<br />
and prepare a suite of Written Schemes of Examination<br />
that optimise the frequency and operational costs<br />
associated with the York inspection programme<br />
All the work was completed on schedule to meet CSL’s<br />
overall strategic requirements for the project.<br />
<strong>GL</strong> <strong>Group</strong> Expert:<br />
Azrul Hilmi<br />
Consultant<br />
Phone: +44 1509 282024<br />
E-Mail: azrul.hilmi@gl-group.com<br />
RC<br />
<strong>01</strong>/2<strong>01</strong>3<br />
27