Integrity<br />

Management Software<br />

<strong>GL</strong> Noble Denton’s Galiom, an integrated environment<br />

for risk-based asset management of<br />

offshore and onshore facilities, supports essential<br />

integrity management (IM) processes:<br />

Risk assessment and IM planning<br />

Inspection, monitoring and testing<br />

Integrity assessment<br />

Mitigation, intervention and repair<br />

Management of change<br />

Back-up. The Easington terminal processes <strong>gas</strong> for the Rough storage facility.<br />

Integrity dashboard<br />

Galiom benefits<br />

Delivers improved visibility of asset criticality,<br />

risk and technical integrity<br />

Identifies the likelihood and consequences of<br />

failures to mitigate major accident risks<br />

Allows operators to benefit from optimised<br />

inspection schedules cutting maintenance,<br />

downtime and inspection costs<br />

Demonstrates compliance with management<br />

procedures<br />

Predicts equipment life and inspection dates<br />

using corrosion rates and asset criticality<br />

Improves decision-making on<br />

repair, replacement and<br />

decommissioning<br />

Highlights operating integrity<br />

<strong>issue</strong>s and can guide a proactive<br />

inspection and maintenance<br />

methodology<br />

GALIOM TM .<br />

Asset integrity<br />

management<br />

(AIM)<br />

software for<br />

operational<br />

risk and<br />

integrity<br />

management.<br />

Outcome and Benefit<br />

Through the successful completion of the project, <strong>GL</strong> Noble<br />

Denton has enabled CSL to:<br />

Commence production from the York field within their<br />

specified programme by ensuring that the Written<br />

Schemes of Examination were prepared and delivered<br />

within the agreed timescales<br />

Implement an RBI methodology tailored to their requirements,<br />

and prepare a suite of Written Schemes of Examination<br />

that optimise the frequency and operational costs<br />

associated with the York inspection programme<br />

All the work was completed on schedule to meet CSL’s<br />

overall strategic requirements for the project.<br />

<strong>GL</strong> <strong>Group</strong> Expert:<br />

Azrul Hilmi<br />

Consultant<br />

Phone: +44 1509 282024<br />

E-Mail: azrul.hilmi@gl-group.com<br />

RC<br />

<strong>01</strong>/2<strong>01</strong>3<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!