14.11.2013 Views

Contura – Autumn/Winter 2013/14

The magazine of the Rhaetian Railway

The magazine of the Rhaetian Railway

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The section of the RhB line between Bergün and Preda is impressive<br />

enough by day. After ten at night it is even more exciting.<br />

"<strong>Contura</strong>" looks over the shoulder of track worker Walter Gubser<br />

as he works on the tracks of the RhB.<br />

Why do all small boys want to be train drivers when they grow up? The real<br />

heroes are not the engine drivers, but the men in orange overalls. Walter<br />

Gubser is one of them. On this night in spring, he guides us over the Albula<br />

Line of the Rhaetian Railway. Countless stars shine on the tracks, viaducts<br />

and helical tunnels; every now and then the moonlight is reflected in the<br />

eyes of a grazing stag. Shortly after 10 pm the last train from Bergün rumbles<br />

through on its way to Preda. Then the track is ours and we do something<br />

not normally allowed. We walk between the rails and over bridges<br />

while Gubser gives us an insight into the workings of this railway, which<br />

has UNESCO World Heritage status.<br />

Hard work - yesterday and today<br />

The railway worker knows every inch of the track, every sleeper and probably<br />

every stone as well. No, that’s not an exaggeration: "In the old days,<br />

our signature tune was tic, tic, tic, tic", he says <strong>–</strong> the noise made by each<br />

team of four as they packed the crushed stones under the sleepers with<br />

their pickaxes. "And woe betide anyone who got out of rhythm", says Gubser.<br />

In time, the pickaxe crews became track assemblers and, later still,<br />

track workers. Nowadays a tamping machine does the work of the pickaxe<br />

crews. Nevertheless, the job is still pretty tough. Gubser, who sometimes<br />

describes himself as a federally certified<br />

track ballast tamping officer, works on<br />

the railway at night for 10-15 weeks a year.<br />

With so many trains using the track, there<br />

is no other solution. No matter whether<br />

it’s 25 degrees below freezing, snowing or<br />

"merely" raining: damaged rails must be<br />

replaced, fallen rocks removed and points<br />

28<br />

www.rhb.ch/contura

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!