UPS<br />
IEM - compared to legacy parallel system<br />
UPS 1<br />
100 kVA<br />
UPS 2<br />
100 kVA<br />
75%<br />
75%<br />
load 300 kVA<br />
load<br />
load = 100%<br />
07:00 18:00<br />
time<br />
Legacy Parallel System<br />
Full-Load Condition<br />
In full load condition the efficiency of a<br />
UPS is optimal. However, this condition<br />
only occurs typically 10 hours / day.<br />
UPS 3<br />
100 kVA<br />
75%<br />
efficiency<br />
4 UPS<br />
UPS 4<br />
100 kVA<br />
75%<br />
load %<br />
UPS 1<br />
100 kVA<br />
UPS 2<br />
100 kVA<br />
UPS 3<br />
100 kVA<br />
UPS 4<br />
100 kVA<br />
15%<br />
15%<br />
15%<br />
15%<br />
load 60 kVA<br />
load<br />
18:00 07:00<br />
efficiency<br />
4 UPS<br />
load = 20%<br />
load %<br />
time<br />
Legacy Parallel System<br />
Partial-Load Condition<br />
In partial load condition (most of the<br />
time) the efficiency of the UPS is lower<br />
causing higher energy costs.<br />
IEM<br />
A<br />
B<br />
X<br />
UPS 1<br />
100 kVA<br />
UPS 2<br />
100 kVA<br />
UPS 3<br />
100 kVA<br />
30%<br />
load 60 kVA<br />
load<br />
18:00 07:00<br />
efficiency<br />
2 UPS<br />
load = 20%<br />
time<br />
IEM<br />
Intelligent Energy Management<br />
Partial Critical Load Condition<br />
(UPS Redundancy)<br />
With IEM installed 2 units will be<br />
switched off automatically. In this<br />
way the efficiency is improved, still<br />
maintaining a n+1 redundant system.<br />
UPS 4<br />
100 kVA<br />
30%<br />
load %<br />
UPS 1<br />
100 kVA<br />
UPS 2<br />
100 kVA<br />
UPS 3<br />
100 kVA<br />
UPS 4<br />
100 kVA<br />
60%<br />
load 60 kVA<br />
load<br />
18:00 07:00<br />
efficiency<br />
1 UPS<br />
load = 20%<br />
load %<br />
time<br />
IEM<br />
Intelligent Energy Management<br />
Partial non-Critical Load<br />
Condition (Utility Redundancy)<br />
With IEM installed 3 units can be<br />
switched off. In this way the efficiency<br />
is improved even more. The bypass is<br />
still available and will supply the load in<br />
case of a failure.<br />
A.7