I MISCELLANEOUS ITEMS (Rs. in lakhs) Sl. No Item of Assets / Machinery Qty. Estimated Cost Actual Cost Incurred 1. Miscellaneous Civil - Structures (Road Work & Drain) i. WBM 110 thick 4000 m2 140 m2 5.60 6.40 ii. R.C.C. M-25 4000 m2 195 m2 7.80 8.00 iii. V.D. Flooring 4000 m2 55 m2 2.20 3.20 iv. Excavation 400 m3 65 m3 0.26 0.60 v. P.C.C. 1:4:8 50 m3 1600 m3 0.80 0.51 vi. Brick Work 140 m3 1650 m3 2.31 3.20 vii. viii. Precast Slab 500 rmt 150 rmt 0.75 ix Plaster 800 m2 60 m2 0.48 0.22 x. Cement 4500 bag 225 bag 10.12 5.11 xi. Tor Steel 25 Ton 35,000 mt 8.75 13.05 xii. Landscaping 1 Nos. L/S 1.00 0.92 Total 40.07 41.21 Total, Say 40.00 41.21 The Civil Structure Work has already been completed by March 31, 2009 and the same has been certified by the Chartered Accountants vide their certificate dated June 25, 2009. J PUBLIC ISSUE EXPENSES: The expenses for this issue includes management fees, IPO Grading expenses, underwriting fees, selling commission, distribution expenses, legal fees, fees to advisors, stationery costs, printing costs, advertising expenses, marketing expenses, and listing fees payable to the stock exchanges, among others. The Company’s proposed issue has been graded by Credit Analysis & Research Limited (CARE). The IPO Grading expenses amount to Rs. [•] lakhs. The total expenses for this issue have been estimated at Rs. 700 lakhs by SBI in its appraisal. However as per the Company, the total expense for the issue is estimated at [■] lakhs as follows: Sl. No. Activity Estimated Amount (Rs. in lakhs) % of Total Expenses (Rs. In lakhs) % of Total Issue size * 1. Fees of BRLMs [•] [•] [•] 2. IPO Grading Expense [•] [•] [•] 3. Underwriting commission [•] [•] [•] 4. Brokerage & Selling commission [•] [•] [•] 5. Advertisement & Marketing [•] [•] [•] expenses 6. Printing and Stationery, [•] [•] [•] Distribution, postage etc 7. Other Expenses (including [•] [•] [•] Registrar fees, legal fees, filing fees, listing fees, depository charges etc) Total [•] [•] [•] 45

K GENERAL CORPORATE PURPOSES: The long-term goal of the Company is to expand its operations in the Industrial Alcohol segment comprising Rectified Spirit, Extra- Neutral Alcohol, Country Liquor and India Made Foreign Liquor (IMFL). The Company is continuously looking for opportunities to grow and the management is continuously identifying and evaluating opportunities. The Company intends to use part of the net proceeds towards such growth plans and opportunities. The Company intends to deploy the proceeds of this Issue aggregating to Rs. [■] lakhs for General Corporate Purposes including but not limited to strategic initiatives, entering into strategic alliances, brand building exercise, strengthening of the market capabilities, partnerships, acquisitions, developing vendors and ancillaries, future projects and meeting exigencies which the Company in the ordinary course may not foresee etc. As on date of this Red Herring Prospectus, the Company has not entered into any letter of intent or any other commitment for any such acquisition/investments or definitive commitment for any such strategic initiatives and acquisitions. The Board of Directors of the Company will review various opportunities from time to time. In accordance with the policies set up by the Board, the Company proposes to retain flexibility in applying the remaining Net Proceeds for general corporate purposes, and also have flexibility in utilizing Issue proceeds earmarked for general corporate purposes. UNDERTAKING BY THE ISSUER COMPANY: Pursuant to Clause 2.8 of the SEBI (Disclosure and Investor Protection) Guidelines, 2000, the Company has made firm arrangements for the stated Means of Finance as follows: (Rs. In lakhs) Total A Project cost as appraised by SBI 8928 B Public Issue Expenses [■] C General Corporate Purposes [■] D Total Means of finance required [■] I Amount to be raised through Public Issue [■] II Term Loans from Banks 1200 III Internal Accruals [■] The Company hereby confirms that firm arrangements of finance through verifiable means towards 75% of the stated Means of Finance, excluding the amount to be raised through the proposed public issue have been made. IMPLEMENTATION SCHEDULE: The installation of several production units along with the construction of utilities and services requires coordination for procurement of equipment, designing the areas and equipment foundations, award of all contracts and supervision of all construction jobs at plant site. The Schedule is as follows: Schedule of Implementation – Time-wise (as estimated by the Company) SL. NO. PROJECT PARTICULARS COMMENCEMENT COMPLETION 1. Installation of a Multi-Pressure Distillation Plant to produce quality Extra Neutral Alcohol (ENA) of 35,000 Litres per day from both Molasses and Grain at Behror Unit in Rajasthan. 2. Installation of a Multi-Pressure Distillation Plant, including Slurry mixing and Liquefaction, saccharification-cum-Fermentation along with May, 2007 March, 2010 May 2007 March, 2010 46

K<br />

GENERAL CORPORATE PURPOSES:<br />

The long-term goal of the Company is to expand its operations in the Industrial Alcohol<br />

segment comprising Rectified Spirit, Extra- Neutral Alcohol, Country Liquor and India Made<br />

Foreign Liquor (IMFL). The Company is continuously looking for opportunities to grow and<br />

the management is continuously identifying and evaluating opportunities. The Company<br />

intends to use part of the net proceeds towards such growth plans and opportunities.<br />

The Company intends to deploy the proceeds of this Issue aggregating to Rs. [■] lakhs for<br />

General Corporate Purposes including but not limited to strategic initiatives, entering into<br />

strategic alliances, brand building exercise, strengthening of the market capabilities,<br />

partnerships, acquisitions, developing vendors and ancillaries, future projects and meeting<br />

exigencies which the Company in the ordinary course may not foresee etc.<br />

As on date of this Red Herring Prospectus, the Company has not entered into any letter of<br />

intent or any other commitment for any such acquisition/investments or definitive<br />

commitment for any such strategic initiatives and acquisitions. The Board of Directors of the<br />

Company will review various opportunities from time to time. In accordance with the policies<br />

set up by the Board, the Company proposes to retain flexibility in applying the remaining Net<br />

Proceeds for general corporate purposes, and also have flexibility in utilizing Issue proceeds<br />

earmarked for general corporate purposes.<br />

UNDERTAKING BY THE ISSUER COMPANY:<br />

Pursuant to Clause 2.8 of the SEBI (Disclosure and Investor Protection) Guidelines, 2000, the<br />

Company has made firm arrangements for the stated Means of Finance as follows:<br />

(Rs. In lakhs)<br />

Total<br />

A Project cost as appraised by SBI 8928<br />

B Public Issue Expenses [■]<br />

C General Corporate Purposes [■]<br />

D Total Means of finance required [■]<br />

I Amount to be raised through Public Issue [■]<br />

II Term Loans from Banks 1200<br />

III Internal Accruals [■]<br />

The Company hereby confirms that firm arrangements of finance through verifiable means<br />

towards 75% of the stated Means of Finance, excluding the amount to be raised through the<br />

proposed public issue have been made.<br />

IMPLEMENTATION SCHEDULE:<br />

The installation of several production units along with the construction of utilities and services<br />

requires coordination for procurement of equipment, designing the areas and equipment<br />

foundations, award of all contracts and supervision of all construction jobs at plant site.<br />

The Schedule is as follows:<br />

Schedule of Implementation – Time-wise (as estimated by the Company)<br />

SL.<br />

NO.<br />

PROJECT PARTICULARS COMMENCEMENT COMPLETION<br />

1. Installation of a Multi-Pressure Distillation Plant to<br />

produce quality Extra Neutral Alcohol (ENA) of<br />

35,000 Litres per day from both Molasses and Grain<br />

at Behror Unit in Rajasthan.<br />

2. Installation of a Multi-Pressure Distillation Plant,<br />

including Slurry mixing and Liquefaction,<br />

saccharification-cum-Fermentation along with<br />

May, 2007<br />

March, 2010<br />

May 2007 March, 2010<br />