1.<br />
Plant and Machinery for 35 KLPD Slurry<br />
Mixing and Liquefaction, Saccarification<br />
cum Fermentation, Wash To ENA<br />
Multipressure Distillation along with<br />
Auxiliaries, Electrical, Instrumentation<br />
and Installation/Erection.<br />
Plant and Machinery For <strong>24</strong>0 KLPD Grain<br />
Thin Slops Evaporation & Part<br />
Decantation (Excludes Centrifuge<br />
Decanter) and Recycle in The Distillery<br />
along with Auxiliaries, Electrical,<br />
Instrumentation & Installation/Erection<br />
services<br />
Grain Cleaning, Milling, Flour Weighment<br />
& Conveying<br />
Spirit Receiver And Storage Section For<br />
30 Days<br />
Plant Electrification Comprising Of HT/LT<br />
Substation, 4 P Transformer, Power<br />
Control Centre, DG Sets,<br />
Cabling, Plant & Yard Lighting, Earthing<br />
etc.<br />
Buildings, Civil & Structural Work for<br />
Complete Distillery:<br />
Main Plant, Effluent Treatment,<br />
Administration Building, Roads, Land<br />
Development<br />
Taxes and Duties/Other expenses 250<br />
TOTAL FOR COST 2665<br />
1 1260 PRAJ Industries Ltd.<br />
PRAJ House<br />
Bavdhan<br />
Pune – 411 021<br />
- 490 - do -<br />
- 70 * Fabrication at<br />
Company site<br />
through local<br />
suppliers and<br />
contractors under<br />
supervision of PRAJ.<br />
- 90 * Fabrication at<br />
Company site<br />
through local<br />
suppliers and<br />
contractors under<br />
supervision of PRAJ.<br />
- 80 * Fabrication at<br />
Company site<br />
through local<br />
suppliers and<br />
contractors under<br />
supervision of PRAJ.<br />
- 425 * Fabrication at<br />
Company site<br />
through local<br />
suppliers and<br />
contractors under<br />
supervision of PRAJ.<br />
Quotation No. BDN:HMT:GSL:O:302 dated March 2, 2007 of M/s PRAJ Industries Limited,<br />
PRAJ House, Bavdhan, Pune – 411 021.<br />
Further, vide letter no. BDN:HMT:GSL:423 dated October 22, 2007, the validity was<br />
extended by another 60 days i.e., till December 21, 2007.<br />
The Company has placed Order for the above equipments to be directly supplied by PRAJ<br />
Industries vide its Order dated December 16, 2007. Praj Industries Limited has vide their<br />
letter dated July 09, 2009 informed the Company that they have completed all pre<br />
engineering works and the machineries are under fabrication and will be ready for dispatch<br />
within 4 to 5 months from 09.07.2009.<br />
C. a. 75 KLPD Total Spirit Based Starch Liquefaction Section<br />
Sl.<br />
No<br />
1.<br />
Item of Assets / Machinery Qty. Cost Supplier<br />
Slurry Preparation and Liquefaction<br />
Section including Auxiliaries,<br />
Electrical and Instrumentation<br />
(with HP Steam Jet Cooking)<br />
Rs. in lakhs<br />
1 269.00 PRAJ Industries Ltd.<br />
PRAJ House Bavdhan<br />
Pune – 411 021<br />
Erection of above machinery - 18.00 Pacecon Engineering<br />
Projects<br />
36