1.<br />

Plant and Machinery for 35 KLPD Slurry<br />

Mixing and Liquefaction, Saccarification<br />

cum Fermentation, Wash To ENA<br />

Multipressure Distillation along with<br />

Auxiliaries, Electrical, Instrumentation<br />

and Installation/Erection.<br />

Plant and Machinery For <strong>24</strong>0 KLPD Grain<br />

Thin Slops Evaporation & Part<br />

Decantation (Excludes Centrifuge<br />

Decanter) and Recycle in The Distillery<br />

along with Auxiliaries, Electrical,<br />

Instrumentation & Installation/Erection<br />

services<br />

Grain Cleaning, Milling, Flour Weighment<br />

& Conveying<br />

Spirit Receiver And Storage Section For<br />

30 Days<br />

Plant Electrification Comprising Of HT/LT<br />

Substation, 4 P Transformer, Power<br />

Control Centre, DG Sets,<br />

Cabling, Plant & Yard Lighting, Earthing<br />

etc.<br />

Buildings, Civil & Structural Work for<br />

Complete Distillery:<br />

Main Plant, Effluent Treatment,<br />

Administration Building, Roads, Land<br />

Development<br />

Taxes and Duties/Other expenses 250<br />

TOTAL FOR COST 2665<br />

1 1260 PRAJ Industries Ltd.<br />

PRAJ House<br />

Bavdhan<br />

Pune – 411 021<br />

- 490 - do -<br />

- 70 * Fabrication at<br />

Company site<br />

through local<br />

suppliers and<br />

contractors under<br />

supervision of PRAJ.<br />

- 90 * Fabrication at<br />

Company site<br />

through local<br />

suppliers and<br />

contractors under<br />

supervision of PRAJ.<br />

- 80 * Fabrication at<br />

Company site<br />

through local<br />

suppliers and<br />

contractors under<br />

supervision of PRAJ.<br />

- 425 * Fabrication at<br />

Company site<br />

through local<br />

suppliers and<br />

contractors under<br />

supervision of PRAJ.<br />

Quotation No. BDN:HMT:GSL:O:302 dated March 2, 2007 of M/s PRAJ Industries Limited,<br />

PRAJ House, Bavdhan, Pune – 411 021.<br />

Further, vide letter no. BDN:HMT:GSL:423 dated October 22, 2007, the validity was<br />

extended by another 60 days i.e., till December 21, 2007.<br />

The Company has placed Order for the above equipments to be directly supplied by PRAJ<br />

Industries vide its Order dated December 16, 2007. Praj Industries Limited has vide their<br />

letter dated July 09, 2009 informed the Company that they have completed all pre<br />

engineering works and the machineries are under fabrication and will be ready for dispatch<br />

within 4 to 5 months from 09.07.2009.<br />

C. a. 75 KLPD Total Spirit Based Starch Liquefaction Section<br />

Sl.<br />

No<br />

1.<br />

Item of Assets / Machinery Qty. Cost Supplier<br />

Slurry Preparation and Liquefaction<br />

Section including Auxiliaries,<br />

Electrical and Instrumentation<br />

(with HP Steam Jet Cooking)<br />

Rs. in lakhs<br />

1 269.00 PRAJ Industries Ltd.<br />

PRAJ House Bavdhan<br />

Pune – 411 021<br />

Erection of above machinery - 18.00 Pacecon Engineering<br />

Projects<br />