Up-front Fee<br />

Commitment Fee<br />

Repayment Schedule<br />

Prepayment charges<br />

Critical Condition<br />

bank/any other lender- penal interest of 2% to be levied for the<br />

period of such defaults.<br />

1.00% of the Term Loan amount, minimum Rs. 15.00 lakhs<br />

1.20 % for delayed draw down beyond 2 months.<br />

12 quarterly instalments of Rs. 1.00 crores each commencing from<br />

June 2010 and ending in March 2013.<br />

2.00% of the prepaid amount.<br />

Term Loan would be disbursed only after all documentation / EM<br />

formalities are in place.<br />

DETAILED BREAK-UP OF PROJECT COST<br />

The disbursement of term loan will be made either by making direct<br />

payments to the suppliers of these machines or against copies of<br />

invoices and evidence of payment together with CA’s certificate as<br />

regards the total expenditure incurred on the project.<br />

The Term Loan will be released only after the successful completion of<br />

the Company’s planned IPO.<br />

The Company proposes to gear up for modernization and expansion of its production facilities at<br />

Behror in the state of Rajasthan and, Samalkha in the state of Haryana.<br />

The detailed break-up of the Project cost under the various heads has been estimated as under:<br />

(As per the Financial Appraisal of State Bank of India dated September 5, 2008)<br />

Details of Project Cost:<br />

A. Multi-Pressure Distillation Section at Behror Unit<br />

Sl.<br />

No<br />

1.<br />

Item of Assets / Machinery Qty. Cost Supplier<br />

35,000 LPD Wash to ENA Multi-Pressure<br />

Distillation Plant with complete Piping,<br />

Insulation, Valves, Electrical and<br />

Instrumentation.<br />

Auxiliaries<br />

(Cooling Tower, CW Recirculation Pumps,<br />

Piping, Valves & Electrical)<br />

Rs. in lakhs<br />

1 522.00 PRAJ Industries Ltd.<br />

PRAJ House Bavdhan<br />

Pune – 411 021<br />

- 16.00 - do -<br />

Erection of above machinery - 18.00 Pacecon Engineering<br />

Projects Ltd.<br />

Packing & Forwarding, Transportation - 21.00 PRAJ Industries Ltd.<br />

and Transit Insurance<br />

PRAJ House Bavdhan<br />

Pune – 411 021<br />

Civil and Structural Design for machinery - 6.00 - do -<br />

Taxes & Duties 93.00<br />

Total 676.00<br />

Quotation No. BDN:HMT:GAL:O:234 dated December 13, 2006 of M/s PRAJ Industries<br />

Limited, PRAJ House, Bavdhan, Pune – 411 021.<br />

The Company has placed Order for the above equipments vide its Order dated December 16,<br />

2007. Praj Industries Limited has vide their letter dated July 09, 2009 informed the<br />

Company that they have completed all pre engineering works and the machineries are under<br />

fabrication and will be ready for dispatch within 4 to 5 months from 09.07.2009<br />

B. Multi-Pressure Grain Based Distillation Section at Samlakha Unit<br />

Sl.<br />

No<br />

Item of Assets / Machinery Qty. Cost Supplier<br />

Rs. in lakhs<br />

35