* On a three-shift basis<br />

At present, the Distillery has two Boilers:<br />

i. One Boiler of 8 M.T./Hr capacity of Babcok & Wilcock make 15 Kg./Cm 2<br />

ii. The Second Boiler of 10 M.T/Hr capacity of Thermax make 15 Kg./Cm 2<br />

The Boiler runs on Biogas and Pet Coke/Rice Husk. Biogas, incidentally, is generated<br />

during the course of primary treatment of Spent Wash in Bio-methanated reactor plant.<br />

Pet Coke and/or Rice Husk are procured from stockists and suppliers at competitive prices.<br />

The Company has never faced any problem in procuring Pet Coke and/or Rice Husk.<br />

The Company is putting up a high-pressure boiler of 20 M.T./hour capacity i.e., 480<br />

M.T./day in the proposed project, which will more take care of the total requirement of<br />

411.50 M.T./day.<br />

b. Samalkha Facility:<br />

At present, Steam, an essential component in the production process, is required for the<br />

production of Industrial Alcohol (comprising Rectified Spirit and Extra-Neutral Alcohol), and<br />

also during the process of Fermentation. The total steam required currently is as under:<br />

Particulars of requirement<br />

_______________________________________________<br />

Quantity<br />

M.T./Day*<br />

_______<br />

Present Requirement:<br />

Rectified Spirit & ENA Plant 165.0<br />

Fermentation House 3% 4.9<br />

Boiler & Turbine Losses 4% 6.6<br />

____________<br />

Sub-total 176.5<br />

____________<br />

Additional Requirement:<br />

Rectified Spirit Plant/ENA<br />

- Steam for Cooking & Liquefaction<br />

- Steam for MPR distillation Plant 160.00<br />

- Steam for Evaporator: 3.40 M.T./hour 81.60<br />

____________<br />

Sub-total <strong>24</strong>1.60<br />

____________<br />

TOTAL 418.10<br />

* On a three-shift basis<br />

At present, the Distillery has one Boiler:<br />

One Boiler of 10.0 M.T./Hr capacity of Thermax makes 15 Kg./Cm2<br />

Proposed Second Boiler of 20 M.T/Hr capacity of Cheema Boiler 42 Kg./Cm 2<br />

The Boiler runs on Biogas and Pet Coke. Biogas, incidentally, is generated during the<br />

course of primary treatment of Spent Wash in Bio-methanated reactor plant. Pet Coke is<br />

procured from Refineries. The Company has never faced any problem in procuring Pet<br />

Coke.<br />

V. EFFLUENT TREATMENT PLANT - DISTILLERY<br />

a. Behror Facility:<br />

94