Boiler (20tph @ 45kg/cm2/g) - 325 KW<br />

Decanter Centrifuge & pumps - 80 KW<br />

Miscellaneous - 50 KW<br />

___________<br />

1830 KW<br />

__________<br />

Power Generation<br />

The Company produces Steam from High Pressure Boilers, one Boiler of 8 MT/ Hour<br />

capacity at 15 Kg. per Cm 2, working pressure with <strong>24</strong>0 0 C superheat steam temperature<br />

and one Boiler of 10 MT/Hour capacity at 15 kg per Cm2 working pressure with <strong>24</strong>0 0 C,<br />

which is passed through the Turbine (of 700 KW capacity). The Turbine rotates at 6000<br />

rpm with the Electric Alternator, which produces electricity of 1000-1200 Amp. of 420<br />

Volt & 50 Hz wherefrom the Company meets its power requirement for various sections<br />

of the factory. From the turbine outlet steam pressure of 1.25 Kg /Cm 2 Company runs its<br />

Alcohol Distillation Plant.<br />

At present, the Company has one Turbine of 700 KW (Siemens make) capacity, which<br />

runs on a <strong>24</strong>-hour basis.<br />

The Company has 320 KV connections from the Rajasthan State Electricity Board.<br />

D.G. Sets<br />

For meeting the extra load, the Company runs DG Set of 380 KVA during the failure of<br />

RSEB supply.<br />

PROPOSED REQUIREMENT<br />

The Company proposed to install one more Turbine, of 2 MW capacity at 3.5 Kg Back<br />

pressure during the current expansion programme.<br />

b. Samalkha Facility:<br />

The details of power requirement, for the various segments, of the Company are as<br />

follows:<br />

Plant Segment<br />

Requirement<br />

Plant Side – Rectified Spirit - 197.0 KW<br />

Extra-Neutral Alcohol Plant - 19.3 KW<br />

Tube Well - 57.0 KW<br />

Molasses Pumping - 26.0 KW<br />

Decanter - <strong>24</strong>.0KW<br />

Effluent Treatment Plant (Primary) - 18.0 KW<br />

On Effluent Treatment Plant Feed Pumps - 15.0 KW<br />

DM Plant for Boiler - 6.0 KW<br />

Boiler - 75.0 KW<br />

Bottling Plant - 162.0 KW<br />

Workshop Load - 6.0 KW<br />

Plant & Administrative Office Lighting - 25.0 KW<br />

___________<br />

TOTAL 630.3 KW<br />

___________<br />

Subsequent to the Proposed Project:<br />

Plant Segment<br />

Requirement<br />

Grain Transfer, Milling<br />

Liquefaction, Saccarification, Fermentation,<br />

Auxiliaries<br />

Multi-Pressure Distillation Column of<br />

Capacity 35 KLPD (Wash to ENA) - 890.0 KW<br />

Boiler (20tph @ 45kg/cm2/g) - 325.0 KW<br />

Misc - 50.0 KW<br />