Domestic - 10 KL Per Day TOTAL - 1448 KL Per Day Additional Requirement on account of the proposed Expansion Process Water for Liquefaction, Fermentation & Distillation Section - 400 KL/day Make-up water for Liquefaction & Fermentation - 495 KL/day Boiler – Water - 33 KL/day Turbine Cooling Water - 100 KL/day TOTAL Requirement Present Additional 1448 KL /day 1028 KL/ day 2476 KL/day TOTAL - 1028 KL Per Day The Company has three tube wells of 40 m 3 /hour capacity each. The above tube wells can generate 2880 KL of water per day. The Company currently uses 2 tubewells and the third is kept as stand-by arrangement. The Company has a DM Water Plant of 3000 Litres/hour capacity with storage of 20,000 Litres for Potable Liquor. Apart from the above, the Company has R.O. Plant of Thermax of capacity 15 KL/Hour which provides. 360 KL/day, the R.O. Water will be used for portable liquor blending and boiler feed water. III. POWER a. Behror Facility: The details of power requirement, for the various segments, of the Company are as follows: Plant Segment Requirement Plant Side – Rectified Spirit - 200.0 KW Extra-Neutral Alcohol Plant - 19.3 KW Tube Well - 75.0 KW Effluent Treatment Plant (Primary) - 20.0 KW On Effluent Treatment Plant Feed Pumps - 15.0 KW RO cum DM Plant for Boiler - 20.0 KW Boiler - 150.0 KW Bottling Plant - 166.0 KW Workshop Load - 10.0 KW Plant & Administrative Office Lighting - 50.0 KW Decanters & Pumps - 80.0 KW TOTAL 805.3 KW Subsequent to the Proposed Project: Plant Segment Requirement Grain Transfer, Milling - 200 KW Liquefaction, Saccarification, Fermentation, Multipressure Distillation, Auxiliaries (Cooling Tower & Recirculation) - 715 KW Biogas, Secondary Treatment, Recycling & Misc- 150 KW Bottling & Blending - 170 KW Plant & Yard Lighting - 30 KW Administrative Block/Offices - 20 KW Spirit Storage & Transfer - 20 KW Water Treatment, Bore wells (DM water Etc) - 70 KW 91
Boiler (20tph @ 45kg/cm2/g) - 325 KW Decanter Centrifuge & pumps - 80 KW Miscellaneous - 50 KW ___________ 1830 KW __________ Power Generation The Company produces Steam from High Pressure Boilers, one Boiler of 8 MT/ Hour capacity at 15 Kg. per Cm 2, working pressure with 240 0 C superheat steam temperature and one Boiler of 10 MT/Hour capacity at 15 kg per Cm2 working pressure with 240 0 C, which is passed through the Turbine (of 700 KW capacity). The Turbine rotates at 6000 rpm with the Electric Alternator, which produces electricity of 1000-1200 Amp. of 420 Volt & 50 Hz wherefrom the Company meets its power requirement for various sections of the factory. From the turbine outlet steam pressure of 1.25 Kg /Cm 2 Company runs its Alcohol Distillation Plant. At present, the Company has one Turbine of 700 KW (Siemens make) capacity, which runs on a 24-hour basis. The Company has 320 KV connections from the Rajasthan State Electricity Board. D.G. Sets For meeting the extra load, the Company runs DG Set of 380 KVA during the failure of RSEB supply. PROPOSED REQUIREMENT The Company proposed to install one more Turbine, of 2 MW capacity at 3.5 Kg Back pressure during the current expansion programme. b. Samalkha Facility: The details of power requirement, for the various segments, of the Company are as follows: Plant Segment Requirement Plant Side – Rectified Spirit - 197.0 KW Extra-Neutral Alcohol Plant - 19.3 KW Tube Well - 57.0 KW Molasses Pumping - 26.0 KW Decanter - 24.0KW Effluent Treatment Plant (Primary) - 18.0 KW On Effluent Treatment Plant Feed Pumps - 15.0 KW DM Plant for Boiler - 6.0 KW Boiler - 75.0 KW Bottling Plant - 162.0 KW Workshop Load - 6.0 KW Plant & Administrative Office Lighting - 25.0 KW ___________ TOTAL 630.3 KW ___________ Subsequent to the Proposed Project: Plant Segment Requirement Grain Transfer, Milling Liquefaction, Saccarification, Fermentation, Auxiliaries Multi-Pressure Distillation Column of Capacity 35 KLPD (Wash to ENA) - 890.0 KW Boiler (20tph @ 45kg/cm2/g) - 325.0 KW Misc - 50.0 KW 92
- Page 67 and 68: Franchise Fees - - - 4.00 Bond Fees
- Page 69 and 70: Mass Media options: • Hoardings 3
- Page 71 and 72: Alcobrew has vide its letter dated
- Page 73 and 74: K GENERAL CORPORATE PURPOSES: The l
- Page 75 and 76: FUNDS DEPLOYED As per the certifica
- Page 77 and 78: Terms of Payment Margin Amount empl
- Page 79 and 80: BASIS FOR ISSUE PRICE The Issue Pri
- Page 81 and 82: Note: The average return on net wor
- Page 83 and 84: STATEMENT OF TAX BENEFITS TAX BENEF
- Page 85 and 86: According to section 10(38) of the
- Page 87 and 88: As per the provisions of Section 11
- Page 89 and 90: Tax. However, the aforesaid income
- Page 91 and 92: SECTION IV: ABOUT THE ISSUER COMPAN
- Page 93 and 94: In India alcohol is largely produce
- Page 95 and 96: Government Policy & Regulations The
- Page 97 and 98: • Scotch rose by 7.0%. Scotch bra
- Page 99 and 100: substantial market share to India s
- Page 101 and 102: As the Company is increasing its In
- Page 103 and 104: Higher level of instrumentation has
- Page 105 and 106: II. ORDERS ALREADY PLACED: Sl. No 1
- Page 107 and 108: Engineering, Plot No. 65, Bhagwati
- Page 109 and 110: 2 nd Stage (Bio-composting) The was
- Page 111 and 112: converts the slurry into a hydrated
- Page 114 and 115: FLOW CHART OF FINISHING GOODS Recti
- Page 116 and 117: The availability of grain particula
- Page 120 and 121: Power Generation Present Requiremen
- Page 122 and 123: The Spent Wash generated from disti
- Page 124 and 125: • White Lace Duet Gin GR 8 Times
- Page 126 and 127: Indian IMFL Industry has undergone
- Page 128 and 129: Certificate dated 23 rd January 200
- Page 130 and 131: 6. Manufacturing Agreement Parties:
- Page 132 and 133: its distinct identity in the Countr
- Page 134 and 135: PROPERTY A. Properties owned by the
- Page 136 and 137: Date of Agreement: 25.3.1995 vide D
- Page 138 and 139: Date of Agreement: 12.1.1995 vide D
- Page 140 and 141: 27. M/s Globus Agronics Limited Dat
- Page 142 and 143: Parties Sub-Lessor Associated Disti
- Page 144 and 145: Class 33 (Thirty Three) Applicant G
- Page 146 and 147: Sr. No Mark Registration Number Cla
- Page 148 and 149: BRIEF HISTORY AND OTHER CORPORATE M
- Page 150 and 151: 22.08.1995 • Change in Authorised
- Page 152 and 153: DIN: 00769308 01.08.2009) Term: 3 y
- Page 154 and 155: Limited in 1983 and later promoted
- Page 156 and 157: Industrial Engineer where he was re
- Page 158 and 159: If at any time the director ceases
- Page 160 and 161: CORPORATE GOVERNANCE CORPORATE GOVE
- Page 162 and 163: 1. To scrutinize the Share transfer
- Page 164 and 165: Further, the Directors are also int
- Page 166 and 167: Chart 1: BEHROR UNIT, RAJASTHAN 139
Domestic - 10 KL Per Day<br />
TOTAL -<br />
1448 KL Per Day<br />
Additional Requirement on account of the proposed Expansion<br />
Process Water for Liquefaction, Fermentation & Distillation Section - 400 KL/day<br />
Make-up water for Liquefaction & Fermentation - 495 KL/day<br />
Boiler – Water - 33 KL/day<br />
Turbine Cooling Water - 100 KL/day<br />
TOTAL Requirement<br />
Present<br />
Additional<br />
1448 KL /day<br />
1028 KL/ day<br />
<strong>24</strong>76 KL/day<br />
TOTAL - 1028 KL Per Day<br />
The Company has three tube wells of 40 m 3 /hour capacity each. The above tube wells can<br />
generate 2880 KL of water per day. The Company currently uses 2 tubewells and the third is<br />
kept as stand-by arrangement.<br />
The Company has a DM Water Plant of 3000 Litres/hour capacity with storage of 20,000<br />
Litres for Potable Liquor.<br />
Apart from the above, the Company has R.O. Plant of Thermax of capacity 15 KL/Hour which<br />
provides. 360 KL/day, the R.O. Water will be used for portable liquor blending and boiler<br />
feed water.<br />
III. POWER<br />
a. Behror Facility:<br />
The details of power requirement, for the various segments, of the Company are as<br />
follows:<br />
Plant Segment<br />
Requirement<br />
Plant Side – Rectified Spirit - 200.0 KW<br />
Extra-Neutral Alcohol Plant - 19.3 KW<br />
Tube Well - 75.0 KW<br />
Effluent Treatment Plant (Primary) - 20.0 KW<br />
On Effluent Treatment Plant Feed Pumps - 15.0 KW<br />
RO cum DM Plant for Boiler - 20.0 KW<br />
Boiler - 150.0 KW<br />
Bottling Plant - 166.0 KW<br />
Workshop Load - 10.0 KW<br />
Plant & Administrative Office Lighting - 50.0 KW<br />
Decanters & Pumps - 80.0 KW<br />
TOTAL 805.3 KW<br />
Subsequent to the Proposed Project:<br />
Plant Segment<br />
Requirement<br />
Grain Transfer, Milling - 200 KW<br />
Liquefaction, Saccarification, Fermentation,<br />
Multipressure Distillation, Auxiliaries<br />
(Cooling Tower & Recirculation) - 715 KW<br />
Biogas, Secondary Treatment, Recycling & Misc- 150 KW<br />
Bottling & Blending - 170 KW<br />
Plant & Yard Lighting - 30 KW<br />
Administrative Block/Offices - 20 KW<br />
Spirit Storage & Transfer - 20 KW<br />
Water Treatment, Bore wells (DM water Etc) - 70 KW<br />
91