RED HERRING PROSPECTUS Dated August 24 ... - Globus Spirits

RED HERRING PROSPECTUS Dated August 24 ... - Globus Spirits RED HERRING PROSPECTUS Dated August 24 ... - Globus Spirits

globusspirits.com
from globusspirits.com More from this publisher
10.11.2013 Views

Domestic - 10 KL Per Day TOTAL - 1448 KL Per Day Additional Requirement on account of the proposed Expansion Process Water for Liquefaction, Fermentation & Distillation Section - 400 KL/day Make-up water for Liquefaction & Fermentation - 495 KL/day Boiler – Water - 33 KL/day Turbine Cooling Water - 100 KL/day TOTAL Requirement Present Additional 1448 KL /day 1028 KL/ day 2476 KL/day TOTAL - 1028 KL Per Day The Company has three tube wells of 40 m 3 /hour capacity each. The above tube wells can generate 2880 KL of water per day. The Company currently uses 2 tubewells and the third is kept as stand-by arrangement. The Company has a DM Water Plant of 3000 Litres/hour capacity with storage of 20,000 Litres for Potable Liquor. Apart from the above, the Company has R.O. Plant of Thermax of capacity 15 KL/Hour which provides. 360 KL/day, the R.O. Water will be used for portable liquor blending and boiler feed water. III. POWER a. Behror Facility: The details of power requirement, for the various segments, of the Company are as follows: Plant Segment Requirement Plant Side – Rectified Spirit - 200.0 KW Extra-Neutral Alcohol Plant - 19.3 KW Tube Well - 75.0 KW Effluent Treatment Plant (Primary) - 20.0 KW On Effluent Treatment Plant Feed Pumps - 15.0 KW RO cum DM Plant for Boiler - 20.0 KW Boiler - 150.0 KW Bottling Plant - 166.0 KW Workshop Load - 10.0 KW Plant & Administrative Office Lighting - 50.0 KW Decanters & Pumps - 80.0 KW TOTAL 805.3 KW Subsequent to the Proposed Project: Plant Segment Requirement Grain Transfer, Milling - 200 KW Liquefaction, Saccarification, Fermentation, Multipressure Distillation, Auxiliaries (Cooling Tower & Recirculation) - 715 KW Biogas, Secondary Treatment, Recycling & Misc- 150 KW Bottling & Blending - 170 KW Plant & Yard Lighting - 30 KW Administrative Block/Offices - 20 KW Spirit Storage & Transfer - 20 KW Water Treatment, Bore wells (DM water Etc) - 70 KW 91

Boiler (20tph @ 45kg/cm2/g) - 325 KW Decanter Centrifuge & pumps - 80 KW Miscellaneous - 50 KW ___________ 1830 KW __________ Power Generation The Company produces Steam from High Pressure Boilers, one Boiler of 8 MT/ Hour capacity at 15 Kg. per Cm 2, working pressure with 240 0 C superheat steam temperature and one Boiler of 10 MT/Hour capacity at 15 kg per Cm2 working pressure with 240 0 C, which is passed through the Turbine (of 700 KW capacity). The Turbine rotates at 6000 rpm with the Electric Alternator, which produces electricity of 1000-1200 Amp. of 420 Volt & 50 Hz wherefrom the Company meets its power requirement for various sections of the factory. From the turbine outlet steam pressure of 1.25 Kg /Cm 2 Company runs its Alcohol Distillation Plant. At present, the Company has one Turbine of 700 KW (Siemens make) capacity, which runs on a 24-hour basis. The Company has 320 KV connections from the Rajasthan State Electricity Board. D.G. Sets For meeting the extra load, the Company runs DG Set of 380 KVA during the failure of RSEB supply. PROPOSED REQUIREMENT The Company proposed to install one more Turbine, of 2 MW capacity at 3.5 Kg Back pressure during the current expansion programme. b. Samalkha Facility: The details of power requirement, for the various segments, of the Company are as follows: Plant Segment Requirement Plant Side – Rectified Spirit - 197.0 KW Extra-Neutral Alcohol Plant - 19.3 KW Tube Well - 57.0 KW Molasses Pumping - 26.0 KW Decanter - 24.0KW Effluent Treatment Plant (Primary) - 18.0 KW On Effluent Treatment Plant Feed Pumps - 15.0 KW DM Plant for Boiler - 6.0 KW Boiler - 75.0 KW Bottling Plant - 162.0 KW Workshop Load - 6.0 KW Plant & Administrative Office Lighting - 25.0 KW ___________ TOTAL 630.3 KW ___________ Subsequent to the Proposed Project: Plant Segment Requirement Grain Transfer, Milling Liquefaction, Saccarification, Fermentation, Auxiliaries Multi-Pressure Distillation Column of Capacity 35 KLPD (Wash to ENA) - 890.0 KW Boiler (20tph @ 45kg/cm2/g) - 325.0 KW Misc - 50.0 KW 92

Domestic - 10 KL Per Day<br />

TOTAL -<br />

1448 KL Per Day<br />

Additional Requirement on account of the proposed Expansion<br />

Process Water for Liquefaction, Fermentation & Distillation Section - 400 KL/day<br />

Make-up water for Liquefaction & Fermentation - 495 KL/day<br />

Boiler – Water - 33 KL/day<br />

Turbine Cooling Water - 100 KL/day<br />

TOTAL Requirement<br />

Present<br />

Additional<br />

1448 KL /day<br />

1028 KL/ day<br />

<strong>24</strong>76 KL/day<br />

TOTAL - 1028 KL Per Day<br />

The Company has three tube wells of 40 m 3 /hour capacity each. The above tube wells can<br />

generate 2880 KL of water per day. The Company currently uses 2 tubewells and the third is<br />

kept as stand-by arrangement.<br />

The Company has a DM Water Plant of 3000 Litres/hour capacity with storage of 20,000<br />

Litres for Potable Liquor.<br />

Apart from the above, the Company has R.O. Plant of Thermax of capacity 15 KL/Hour which<br />

provides. 360 KL/day, the R.O. Water will be used for portable liquor blending and boiler<br />

feed water.<br />

III. POWER<br />

a. Behror Facility:<br />

The details of power requirement, for the various segments, of the Company are as<br />

follows:<br />

Plant Segment<br />

Requirement<br />

Plant Side – Rectified Spirit - 200.0 KW<br />

Extra-Neutral Alcohol Plant - 19.3 KW<br />

Tube Well - 75.0 KW<br />

Effluent Treatment Plant (Primary) - 20.0 KW<br />

On Effluent Treatment Plant Feed Pumps - 15.0 KW<br />

RO cum DM Plant for Boiler - 20.0 KW<br />

Boiler - 150.0 KW<br />

Bottling Plant - 166.0 KW<br />

Workshop Load - 10.0 KW<br />

Plant & Administrative Office Lighting - 50.0 KW<br />

Decanters & Pumps - 80.0 KW<br />

TOTAL 805.3 KW<br />

Subsequent to the Proposed Project:<br />

Plant Segment<br />

Requirement<br />

Grain Transfer, Milling - 200 KW<br />

Liquefaction, Saccarification, Fermentation,<br />

Multipressure Distillation, Auxiliaries<br />

(Cooling Tower & Recirculation) - 715 KW<br />

Biogas, Secondary Treatment, Recycling & Misc- 150 KW<br />

Bottling & Blending - 170 KW<br />

Plant & Yard Lighting - 30 KW<br />

Administrative Block/Offices - 20 KW<br />

Spirit Storage & Transfer - 20 KW<br />

Water Treatment, Bore wells (DM water Etc) - 70 KW<br />

91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!