04.11.2013 Views

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>IEA</strong> SHC Task 38 <strong>Solar</strong> Air Conditioning <strong>and</strong> Refriger<strong>at</strong>ion Subtask C Report, D<strong>at</strong>e: 13.01.2009<br />

Figure 5-9: Silver/copper electrodes for cooling tower basin (courtesy of ECONICsystems)<br />

The silver/copper electrodes are also available for integr<strong>at</strong>ion in the cooling w<strong>at</strong>er pipe<br />

system.<br />

In summary it can be said, th<strong>at</strong> the first results are promising to the development of a<br />

suitable disinfection method for small scale wet cooling towers. However, further research on<br />

the disinfection method <strong>and</strong> tests in real he<strong>at</strong> rejection applic<strong>at</strong>ions are necessary to verify<br />

the effectiveness of the disinfection method in long term tests <strong>and</strong> for different chemical<br />

composition of the cooling w<strong>at</strong>er. This shall be carried out in near future.<br />

5.6 Cost comparison<br />

After analysis <strong>and</strong> description of the two physical w<strong>at</strong>er tre<strong>at</strong>ments for a hygienic oper<strong>at</strong>ion<br />

of small wet cooling towers, it is also worth to compare the estim<strong>at</strong>ed cost of the proposed<br />

measures. In the table below the investment <strong>and</strong> oper<strong>at</strong>ion cost are listed over an oper<strong>at</strong>ion<br />

period of 15 years.<br />

Table 5-2 Annual cost of hygienic measures for a small cooling tower (30 kW) over a<br />

oper<strong>at</strong>ion time of 15 years<br />

Investment Oper<strong>at</strong>ional cost Maintenance &<br />

replacement<br />

Euro Euro/a Euro/a<br />

page 38<br />

Remarks<br />

UV-C disinfection 450 1) to 1000 2) 90 65 Cleaning, lamp<br />

Silver/copper<br />

disinfection<br />

ions<br />

Note 1) : Equipment according to Figure 5-5<br />

Note 2) : Equipment according to Figure 5-6<br />

100 to 300 0,5 27,5 Inspection<br />

The numbers in the Table 5-2 are calcul<strong>at</strong>ed for a small wet cooling tower with cooling<br />

capacity of 30 kW under the following conditions:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!