04.11.2013 Views

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>IEA</strong> SHC Task 38 <strong>Solar</strong> Air Conditioning <strong>and</strong> Refriger<strong>at</strong>ion Subtask A Report, D<strong>at</strong>e: 06/2011<br />

70 - 400 kW 1 cooling capacity most of the small-scale plants evalu<strong>at</strong>ed, are obviously much more<br />

expensive. Interestingly, there is one plant within the average values of investment costs of<br />

medium <strong>and</strong> large size solar cooling plants (plant 6) <strong>and</strong> one plant is much below these<br />

values (plant 13).<br />

Specific investment costs (€/kW cooling capacity)<br />

11.429<br />

6.800<br />

3.467<br />

9.600<br />

5.556<br />

4.600<br />

2.000 1.200<br />

11.111<br />

9.4127.500<br />

21.500<br />

7.848<br />

plant 1<br />

plant 2<br />

plant 3<br />

plant 4<br />

plant 5<br />

plant 6<br />

plant 12<br />

plant 13<br />

plant 14<br />

plant 15<br />

plant 16<br />

plant 17<br />

Average<br />

Figure 13: Specific investment costs of plants<br />

2.3 Recommend<strong>at</strong>ions for install<strong>at</strong>ion, oper<strong>at</strong>ion <strong>and</strong> maintenance<br />

As already mentioned in chapter 1, the inform<strong>at</strong>ion gained from the end-user survey is<br />

transferred into the following list of recommend<strong>at</strong>ions to bring the idea of pre-engineered<br />

systems forward.<br />

Install<strong>at</strong>ion:<br />

One person (company) with responsibility for the full install<strong>at</strong>ion <strong>and</strong> co-ordin<strong>at</strong>ion of<br />

communic<strong>at</strong>ion between the involved companies <strong>and</strong> the end-user<br />

Set up of install<strong>at</strong>ion time schedule which allows parallel work of different<br />

professionals <strong>and</strong> exact milestones, to shorten the time of install<strong>at</strong>ion<br />

Planning of quality checks during install<strong>at</strong>ion; A list of components, typically used for<br />

solar he<strong>at</strong>ing <strong>and</strong> cooling plants, should be set up <strong>and</strong> applied<br />

1 A. Preisler, T. Selke, L. Sisó, A. LeDenn, R. Ungerböck, ROCOCO – Reduction of Costs of <strong>Solar</strong><br />

<strong>Cooling</strong> Systems, European Project in 6th Framework Program, Specific Support Action, Wien,<br />

06/2008<br />

page 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!