<strong>IEA</strong> SHC Task 38 <strong>Solar</strong> Air Conditioning <strong>and</strong> Refriger<strong>at</strong>ion Subtask A Report, D<strong>at</strong>e: 06/2011<br />

Install<strong>at</strong>ion period (days)<br />

90<br />

90<br />

60<br />

60<br />

60<br />

30<br />

30<br />

33<br />

3 5<br />

20<br />

3<br />

15<br />

15<br />

4<br />

10<br />

plant 1<br />

plant 2<br />

plant 3<br />

plant 4<br />

plant 5<br />

plant 6<br />

plant 7<br />

plant 8<br />

plant 12<br />

plant 13<br />

plant 14<br />

plant 15<br />

plant 16<br />

plant 17<br />

plant 18<br />

Average<br />

Figure 9: Install<strong>at</strong>ion period of plants<br />

The number of people involved for install<strong>at</strong>ion for the evalu<strong>at</strong>ed plants shows th<strong>at</strong> for most of<br />

the plants less than five people were necessary (see Figure 10). Also this can be used as an<br />

indic<strong>at</strong>or for pre-engineered systems to avoid misunderst<strong>and</strong>ings <strong>and</strong> time delay during<br />

install<strong>at</strong>ion due to the amount of involved people <strong>and</strong> companies.<br />

People involved in install<strong>at</strong>ion<br />

18<br />

20 20<br />

3<br />

2<br />

6<br />

3 3<br />

4<br />

3<br />

2<br />

5<br />

3<br />

2<br />

8<br />

3<br />

7<br />

plant 1<br />

plant 2<br />

plant 3<br />

plant 4<br />

plant 5<br />

plant 6<br />

plant 7<br />

plant 8<br />

plant 10<br />

plant 12<br />

plant 13<br />

plant 14<br />

plant 15<br />

plant 16<br />

plant 17<br />

plant 18<br />

Average<br />

Figure 10: People involved for install<strong>at</strong>ion<br />

In seven of the evalu<strong>at</strong>ed plants time delays during install<strong>at</strong>ion (see Figure 11) were<br />

recorded.<br />