04.11.2013 Views

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>IEA</strong> SHC Task 38 <strong>Solar</strong> Air Conditioning <strong>and</strong> Refriger<strong>at</strong>ion<br />

Subtask A Report, D<strong>at</strong>e:…<br />

4 Monitoring Equipment<br />

4.1 Installed Equipment<br />

Each he<strong>at</strong> sink or source is metered with two temper<strong>at</strong>ure sensors (inlet <strong>and</strong> outlet) <strong>and</strong> one<br />

electromagnetic flow meter. Apart from the TIC sensors for control purposes all sensors are<br />

connected to an Agilent 34980A Multifunction Switch/Measure Unit with shielded <strong>and</strong><br />

grounded cables.<br />

Installed sensors:<br />

32 TIR Pt-100 temper<strong>at</strong>ure sensors 1/10 DIN B 4-wire resistance<br />

- Ambient air<br />

- Surface temper<strong>at</strong>ure of one solar collector<br />

- Outlet of each solar collector array<br />

- <strong>Solar</strong> he<strong>at</strong> exchanger, primary <strong>and</strong> secondary inlet <strong>and</strong> outlet<br />

- hot w<strong>at</strong>er tank<br />

- absorption chiller inlet <strong>and</strong> outlet of gener<strong>at</strong>or, evapor<strong>at</strong>or <strong>and</strong> absorber/condenser<br />

- Reject he<strong>at</strong> exchanger, primary <strong>and</strong> secondary inlet <strong>and</strong> outlet<br />

- Dry air cooler outlet<br />

- L<strong>at</strong>ent he<strong>at</strong> storage modules outlet <strong>and</strong> PCM temper<strong>at</strong>ure<br />

18 TIC Pt-1000 temper<strong>at</strong>ure sensors 1/10 DIN B 2-wire resistance<br />

- only for control purposes<br />

8 FICR Electromagnetic Flow meters ± 0.2 % 2-wire 0-10 V<br />

- solar secondary loop<br />

- primary <strong>and</strong> secondary reject he<strong>at</strong> loop<br />

- l<strong>at</strong>ent he<strong>at</strong> storage module1 loop<br />

- absorption chiller, chilled w<strong>at</strong>er loop<br />

- absorption chiller hot w<strong>at</strong>er <strong>and</strong> hot w<strong>at</strong>er tank loop<br />

- he<strong>at</strong>ing <strong>and</strong> cooling system loop of the building<br />

4 LIR W<strong>at</strong>tmeter ± 0.1 % 2-wire 0-10 V<br />

- <strong>Solar</strong> thermal system components <strong>and</strong> UVR1611 control unit<br />

- Reject he<strong>at</strong> loop <strong>and</strong> l<strong>at</strong>ent he<strong>at</strong> storage components<br />

- fan of the dry air cooler<br />

- absorption chiller <strong>and</strong> control unit<br />

1 RIR Pyrometer < 2 % 2-wire mV<br />

- direct <strong>and</strong> indirect solar insol<strong>at</strong>ion on the aperture area of the solar collector<br />

4.2 Period of Measurement<br />

The period of measurement started in January 2008 <strong>and</strong> is ongoing. Due to l<strong>at</strong>ent he<strong>at</strong><br />

storage performance tests <strong>and</strong> capacity tests the d<strong>at</strong>a of the following days have not been<br />

taken into account for the evalu<strong>at</strong>ion of the annual performance d<strong>at</strong>a:<br />

30.01. – 31.01.2008 21.04. – 22.04.2009 23.03. – 28.03.2010<br />

20.04. – 23.04.2008 09.07. – 10.07.2009<br />

17.06. – 18.06.2008 17.09. – 18.09.2009<br />

29.10. – 30.10.2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!