IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at
IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at
IEA SHC Task 38 Solar Air Conditioning and Refrigeration Subtask A Report, Date:… 1 Introduction The targeted building welcoming the solar cooling application is the PUMA3’s INES research office. The INES (National Institute of Solar Energy) was created in 2006 by the public institutions to promote and develop solar technologies in France. To reach these objectives, the INES is divided into two centers: research, development and innovation on the one hand, and training and education on the other hand. The INES is located in the “Savoie Technolac” area which is very close to Chambéry in Rhônes-Alpes area (close to the French Alps and Lyon). The PUMA3 building is large, but only 3 mezzanine offices are cooled down by the solar system. The building was created recently so it has a good level of energy efficiency. 2 System design The system is based on an absorption chiller of 4.5 kW coupled with 30 m² flat plate collectors. The installation is cooling the building in summer, heating in winter, and it also producing a small amount of domestic hot water all year long. The 400 liters heat storage tank is included in a packaged device supplied by Clipsol (SSC BlocSol RSD 120). Included in this device there is also an electric backup and all the security devices related to the heat storage. Another tank is installed in the system which is ensuring the cold storage in summer and a second heat storage in winter. The heat rejection system is done by a horizontal geothermal field. Installation’s scheme: Building: - Type of building: Office building - Location: Chambery, France - In operation since: April 2009 - System operated by: INES - Air-conditioned area: 21m² - System used for space cooling and heating (DHW production possible but not used)
IEA SHC Task 38 Solar Air Conditioning and Refrigeration Subtask A Report, Date:… System general properties: - Technology: Closed cycle - Nominal capacity: 4.5 kWcold - Type of closed system: Absorption - Brand of chiller unit: ROTARTICA - Chilled water application: Fan coil - Dehumidification: No - Heat rejection system: Geothermal probes, exchange area about 138m² Solar thermal: - Collector type: Flat plate collectors - Brand of collector: CLIPSOL - Collector area: 30m² - Tilt angle, orientation: 30°, 10° - Collector fluid: Water glycol - Typical operation temperature: 80°C Configuration: - Heat storage: 0.4 m3 water (part of:SSC BlocSol RSD 120 CLIPSOL) - Cold storage: 0.3 m3 water - Use of auxiliary heating system: Hot backup (heating the heat storage tank) Photos: Technical premises Collector field Geothermal field Distribution system
- Page 225 and 226: IEA SHC Task 38 Solar Air Condition
- Page 227 and 228: IEA SHC Task 38 Solar Air Condition
- Page 229 and 230: IEA SHC Task 38 Solar Air Condition
- Page 231 and 232: IEA SHC Task 38 Solar Air Condition
- Page 233 and 234: IEA SHC Task 38 Solar Air Condition
- Page 235 and 236: IEA SHC Task 38 Solar Air Condition
- Page 237 and 238: IEA SHC Task 38 Solar Air Condition
- Page 239: IEA SHC Task 38 Solar Air Condition
- Page 242 and 243: IEA SHC Task 38 Solar Air Condition
- Page 244 and 245: IEA SHC Task 38 Solar Air Condition
- Page 246 and 247: IEA SHC Task 38 Solar Air Condition
- Page 248 and 249: IEA SHC Task 38 Solar Air Condition
- Page 250 and 251: IEA SHC Task 38 Solar Air Condition
- Page 252 and 253: IEA SHC Task 38 Solar Air Condition
- Page 254 and 255: IEA SHC Task 38 Solar Air Condition
- Page 256 and 257: IEA SHC Task 38 Solar Air Condition
- Page 258 and 259: IEA SHC Task 38 Solar Air Condition
- Page 260 and 261: Task 38 Solar Air-Conditioning and
- Page 262 and 263: - - - - - - - - - - -
- Page 264 and 265: - - - - - - - - - - -
- Page 266 and 267: Pompe évaporateur + compteur C3 Dr
- Page 268 and 269: 80 70 Temperature (°C) 60 50 40 3
- Page 270 and 271: Power (kW) 20 19 18 17 16 15 14 13
- Page 272 and 273: Power (kW) 20 19 18 17 16 15 14 13
- Page 274 and 275: Task 38 Solar Air-Conditioning and
- Page 278 and 279: IEA SHC Task 38 Solar Air Condition
- Page 280 and 281: IEA SHC Task 38 Solar Air Condition
- Page 282 and 283: IEA SHC Task 38 Solar Air Condition
- Page 284 and 285: IEA SHC Task 38 Solar Air Condition
- Page 286 and 287: IEA SHC Task 38 Solar Air Condition
- Page 288 and 289: IEA SHC Task 38 Solar Air Condition
- Page 290 and 291: IEA SHC Task 38 Solar Air Condition
- Page 292 and 293: IEA SHC Task 38 Solar Air Condition
- Page 294 and 295: IEA SHC Task 38 Solar Air Condition
- Page 296 and 297: IEA SHC Task 38 Solar Air Condition
- Page 298 and 299: IEA SHC Task 38 Solar Air Condition
- Page 300 and 301: Task 38 Solar Air-Conditioning and
- Page 302 and 303: IEA SHC Task 38 Solar Air Condition
- Page 304 and 305: IEA SHC Task 38 Solar Air Condition
- Page 306 and 307: IEA SHC Task 38 Solar Air Condition
- Page 308 and 309: IEA SHC Task 38 Solar Air Condition
- Page 310 and 311: IEA SHC Task 38 Solar Air Condition
- Page 312 and 313: IEA SHC Task 38 Solar Air Condition
- Page 314 and 315: IEA SHC Task 38 Solar Air Condition
- Page 316 and 317: IEA SHC Task 38 Solar Air Condition
- Page 318 and 319: IEA SHC Task 38 Solar Air Condition
- Page 320 and 321: IEA SHC Task 38 Solar Air Condition
- Page 322 and 323: IEA SHC Task 38 Solar Air Condition
- Page 324 and 325: IEA SHC Task 38 Solar Air Condition
<strong>IEA</strong> SHC Task 38 <strong>Solar</strong> Air Conditioning <strong>and</strong> Refriger<strong>at</strong>ion<br />
Subtask A Report, D<strong>at</strong>e:…<br />
1 Introduction<br />
The targeted building welcoming the solar cooling applic<strong>at</strong>ion is the PUMA3’s INES research<br />
office. The INES (N<strong>at</strong>ional Institute of <strong>Solar</strong> Energy) was cre<strong>at</strong>ed in 2006 by the public<br />
institutions to promote <strong>and</strong> develop solar technologies in France. To reach these objectives,<br />
the INES is divided into two centers: research, development <strong>and</strong> innov<strong>at</strong>ion on the one h<strong>and</strong>,<br />
<strong>and</strong> training <strong>and</strong> educ<strong>at</strong>ion on the other h<strong>and</strong>. The INES is loc<strong>at</strong>ed in the “Savoie Technolac”<br />
area which is very close to Chambéry in Rhônes-Alpes area (close to the French Alps <strong>and</strong><br />
Lyon). The PUMA3 building is large, but only 3 mezzanine offices are cooled down by the<br />
solar system. The building was cre<strong>at</strong>ed recently so it has a good level of energy efficiency.<br />
2 System design<br />
The system is based on an absorption chiller of 4.5 kW coupled with 30 m² fl<strong>at</strong> pl<strong>at</strong>e<br />
collectors. The install<strong>at</strong>ion is cooling the building in summer, he<strong>at</strong>ing in winter, <strong>and</strong> it also<br />
producing a small amount of domestic hot w<strong>at</strong>er all year long. The 400 liters he<strong>at</strong> storage<br />
tank is included in a packaged device supplied by Clipsol (SSC BlocSol RSD 120). Included<br />
in this device there is also an electric backup <strong>and</strong> all the security devices rel<strong>at</strong>ed to the he<strong>at</strong><br />
storage. Another tank is installed in the system which is ensuring the cold storage in summer<br />
<strong>and</strong> a second he<strong>at</strong> storage in winter. The he<strong>at</strong> rejection system is done by a horizontal<br />
geothermal field.<br />
Install<strong>at</strong>ion’s scheme:<br />
Building:<br />
- Type of building: Office building<br />
- Loc<strong>at</strong>ion: Chambery, France<br />
- In oper<strong>at</strong>ion since: April 2009<br />
- System oper<strong>at</strong>ed by: INES<br />
- Air-conditioned area: 21m²<br />
- System used for space cooling <strong>and</strong> he<strong>at</strong>ing (DHW production possible but not used)