<strong>IEA</strong> SHC Task 38 <strong>Solar</strong> Air Conditioning <strong>and</strong> Refriger<strong>at</strong>ion Subtask A Report, D<strong>at</strong>e: November 2010<br />

4 Monitoring Results<br />

4.1 Annual / Monthly D<strong>at</strong>a<br />

As an overview the solar energy source management is shown in Figure 5. Start of<br />

monitoring is July 2009 <strong>at</strong> the left side of the graph. The first cooling season lasts until<br />

October 09 including free cooling. Q3 represents the sum of solar he<strong>at</strong>ing <strong>and</strong> the he<strong>at</strong> from<br />

the conventional system. The solar fraction in summer is 100% (no he<strong>at</strong> backup) in winter<br />

the solar fraction for he<strong>at</strong>ing drops down from approxim<strong>at</strong>ely 20% in Nov09 to 7% in Dec09.<br />

The highest fractions occur in spring (30% in Feb10; 60% in March10). The overall solar<br />

efficiency is approxim<strong>at</strong>ely 30%, including efficiencies up to 40% in summer <strong>and</strong> 10% during<br />

winter.<br />

Figure 5: <strong>Solar</strong> energy management over the whole measuring period July 2009 to<br />

September 2010<br />

In the first cooling season the primary energy r<strong>at</strong>ios (PER) of the SHC plant are lower than<br />

the defined reference system (Figure 6). As a result of these PER neg<strong>at</strong>ive savings in terms<br />

of primary energy occurred!<br />

After improvements <strong>and</strong> changes in May 2010 the fraction of primary energy savings got<br />

slightly positive. Higher values are expected for the cooling season 2011 with further<br />

improvements. Since oper<strong>at</strong>ion started in July 2009 savings of 14% could be achieved. If the<br />

first (neg<strong>at</strong>ive) cooling period is excluded the fraction of primary energy savings is gre<strong>at</strong>er<br />

20%. Taking into account the 100% solar cooling plant with no conventional backup this<br />

value has to be improved.<br />