04.11.2013 Views

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

IEA Solar Heating and Cooling Programm - NachhaltigWirtschaften.at

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>IEA</strong> SHC Task 38 <strong>Solar</strong> Air Conditioning <strong>and</strong> Refriger<strong>at</strong>ion Subtask A Report A-D3b, D<strong>at</strong>e: December 2010<br />

Due to the fact th<strong>at</strong> detailed monitoring d<strong>at</strong>a was not available for the whole first cooling<br />

period, no concrete st<strong>at</strong>ement to the system reliability can be given. But the fragmented<br />

measurement d<strong>at</strong>a showed good oper<strong>at</strong>ion behaviors of the solar thermal system <strong>and</strong> the<br />

cold distribution system. Additionally the feedback of the Feistritzwerke’s employees was<br />

pretty positive in view of room comfort conditions. A huge optimiz<strong>at</strong>ion potential could be<br />

detected in the storage charging control str<strong>at</strong>egy. Currently, all five he<strong>at</strong> storage tanks are<br />

charged (<strong>Solar</strong>, CHP) - with resulting storage losses of 65% respectively 59%! Improvements<br />

will be reached by oper<strong>at</strong>ing only the one high temper<strong>at</strong>ure tank. Nevertheless, for the<br />

circumstance th<strong>at</strong> this system was installed <strong>and</strong> put in oper<strong>at</strong>ion with no carried out<br />

optimiz<strong>at</strong>ion measures, the monitoring d<strong>at</strong>a showed quite acceptable values.<br />

Photos<br />

Absorption chiller Chilled ceiling, w<strong>at</strong>er tre<strong>at</strong>ment <strong>Cooling</strong> tower<br />

Veg<strong>at</strong>able oil driven CHP High temper<strong>at</strong>ure storage tank External pl<strong>at</strong>e he<strong>at</strong><br />

exchanger of the solar<br />

thermal system<br />

Monitoring D<strong>at</strong>a<br />

Measured period<br />

Monitoring level (according to Task 38<br />

procedure)<br />

Person responsible for monitoring<br />

July 2010 - ongoing<br />

Level 3<br />

Alex<strong>and</strong>er Thür, AEE INTEC<br />

Phone: +43-3112-5886-26<br />

e-mail: a.thuer@aee.<strong>at</strong><br />

page 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!