Local Plan for Sustainable Development of Sibiu Municipality

Local Plan for Sustainable Development of Sibiu Municipality Local Plan for Sustainable Development of Sibiu Municipality

01.11.2013 Views

72 MUNICIPALITY renowned “SAMPLES FAIR IN THE CITY ON CIBIN”. • The nine Fair-Exhibitions that took place in the Theatre Square during 1933- 1941 went on for 20 days, and the equipment was provided with the aid of the local administration and of local entrepreneurs who embraced the initiative of the Chamber of Commerce and Industry. • Here, the businesspersons had the opportunity to meet with other businesspersons, to see the exhibited products and to do business and consequently increase their turnovers. • For organising the Samples Fair, the Sibiu Chamber of Commerce and Industry had important facilities in the Theatre Square, special pavilions as well as constructions specific to exhibitions. • The Fair stretched over 18000 m². • The built area was 8000 m². • The Sibiu Exhibition Centre would also have rooms for the training of the labour force, according to the requirements of the business environment in Sibiu. Goals: • Promoting the economic units’ interest in the development of trade and industry, on both national and international scale, according to the requirements of the market economy. • Redefining the industry’s profile, according to the existing conditions on the national and international market. • The liquidation, with minimum social, financial and ecological costs of obsolete production units. • Coherent the policies regarding SMEs, and an increased capacity to create and implement local level of policies and proposals to support the reduction of unemployment, by creating new jobs. • The training of managers with new economic ways of thinking, according to the requirements of the European Union integration. The financial requirements of the project The accomplishment of the project involves combining the efforts of the following local institutions: Sibiu City Hall, Sibiu County Council, the Prefecture, Sibiu Chamber of Commerce, Industry and Agriculture, business persons, entrepreneurs from Sibiu. Estimated value: 450,000 EURO Accomplishment term Project duration: 3-5 years IV.4. THE INDUSTRIAL WATER SUPPLY OF SIBIU MUNICIPALITY THROUGH THE RESTORATION OF THE DAM ON THE CIBIN RIVER, TURNIªOR ZONE Short description of the project Goals: • Separation of drinking water and industrial water supplies, resulting in lower costs for beneficiaries and the use of the water (from reservoir) for leisure; • Accomplishment of the project will have a positive influence on the water tariffs for the population and the environmental quality in the south-west and western area of the municipality; • Accomplishment of the project will increase the life standards of the inhabitants of the city and the quality of the environment; • The project is integrated within the territorial arrangement, because the dam is the main objective and its use is a 20 years old project. The financial requirements of the project • Each economic unit, benefiting by its quota of industrial water, is directly proportional with the water flow requested; • The work is estimated to 515,000 Euro, of which: - 200,000 Euro for dam rehabilitation; - 300,000 Euro for supply pipeline; - 15,000 Euro for the design.

73 SIBIU Settlements • the legislation encourages the completion of the work; • the location does not require expropriations. Accomplishment term • the programme can be accomplished in one, maximum 2 stages with a duration of 24 months; • there is no other study stage for the present programme. Accomplishment term • the programme can be accomplished in six months, only during the spring-autumn period; • there is no other study stage for the present programme. IV.6. ELABORATION AND IMPLEMENTATION OF AN EFFECTIVE MANAGEMENT PLAN FOR DUMBRAVA NATURAL PARK IV.5. REHABILITATION OF THE PHREATIC LAYER IN SUB ARINI PARK Short description of the project Goal • The goal of this project is to rescue the trees which are declared to be monuments of nature, and the improvement of the environmental quality in Sibiu; • The work beneficiary is the living nature; • The project does not need approval for urban integration, because it existed before 1990. The financial requirements of the project • the programme must be financed by the Sibiu City Hall; • the value of the project is estimated to 21,000 Euro, of which: - 20,000 Euro for the initiation work; - 1,000 Euro for the design. Settlements • At present, the work location is 10 % in length illegally engaged; there are no buildings on the land. Short description of the project Necessary operations: • Identification of necessary financing resources; • Identification of the means to facilitate a partnerships between the administrative structure of the Dumbrava Natural Park, local public authorities, private organisations for the guarantee of financial and human resources for the effective administration of the park; • Delimitation and marking of the perimeter of Dumbrava natural park; • Installation of warning panels; • Training of personnel qualified for the supervision and administration of the park; • The accomplishment of the infrastructure necessary for the development of eco-tourism within the park; • Identification of possibilities to grant facilities to organisations and persons willing to get involved in activities for the conservation and environmental protection in the park. • Elaboration of a programme to bring the public’s attention to the scientific importance of the Dumbrava Natural Park and to involve the public in specific operations for protection and conservation. Project financing requirements Estimated value of project: 100,000 EURO

72<br />

MUNICIPALITY<br />

renowned “SAMPLES FAIR IN THE CITY ON<br />

CIBIN”.<br />

• The nine Fair-Exhibitions that took place in the<br />

Theatre Square during 1933- 1941 went on <strong>for</strong><br />

20 days, and the equipment was provided with<br />

the aid <strong>of</strong> the local administration and <strong>of</strong> local<br />

entrepreneurs who embraced the initiative <strong>of</strong><br />

the Chamber <strong>of</strong> Commerce and Industry.<br />

• Here, the businesspersons had the opportunity<br />

to meet with other businesspersons, to see the<br />

exhibited products and to do business and<br />

consequently increase their turnovers.<br />

• For organising the Samples Fair, the <strong>Sibiu</strong><br />

Chamber <strong>of</strong> Commerce and Industry had<br />

important facilities in the Theatre Square,<br />

special pavilions as well as constructions<br />

specific to exhibitions.<br />

• The Fair stretched over 18000 m².<br />

• The built area was 8000 m².<br />

• The <strong>Sibiu</strong> Exhibition Centre would also have<br />

rooms <strong>for</strong> the training <strong>of</strong> the labour <strong>for</strong>ce,<br />

according to the requirements <strong>of</strong> the business<br />

environment in <strong>Sibiu</strong>.<br />

Goals:<br />

• Promoting the economic units’ interest in the<br />

development <strong>of</strong> trade and industry, on both<br />

national and international scale, according to<br />

the requirements <strong>of</strong> the market economy.<br />

• Redefining the industry’s pr<strong>of</strong>ile, according to<br />

the existing conditions on the national and<br />

international market.<br />

• The liquidation, with minimum social, financial<br />

and ecological costs <strong>of</strong> obsolete production<br />

units.<br />

• Coherent the policies regarding SMEs, and an<br />

increased capacity to create and implement<br />

local level <strong>of</strong> policies and proposals to support<br />

the reduction <strong>of</strong> unemployment, by creating<br />

new jobs.<br />

• The training <strong>of</strong> managers with new economic<br />

ways <strong>of</strong> thinking, according to the requirements<br />

<strong>of</strong> the European Union integration.<br />

The financial requirements <strong>of</strong> the project<br />

The accomplishment <strong>of</strong> the project involves combining<br />

the ef<strong>for</strong>ts <strong>of</strong> the following local institutions: <strong>Sibiu</strong> City<br />

Hall, <strong>Sibiu</strong> County Council, the Prefecture, <strong>Sibiu</strong><br />

Chamber <strong>of</strong> Commerce, Industry and Agriculture,<br />

business persons, entrepreneurs from <strong>Sibiu</strong>.<br />

Estimated value: 450,000 EURO<br />

Accomplishment term<br />

Project duration: 3-5 years<br />

IV.4. THE INDUSTRIAL WATER<br />

SUPPLY OF SIBIU MUNICIPALITY<br />

THROUGH THE RESTORATION OF<br />

THE DAM ON THE CIBIN RIVER,<br />

TURNIªOR ZONE<br />

Short description <strong>of</strong> the project<br />

Goals:<br />

• Separation <strong>of</strong> drinking water and industrial<br />

water supplies, resulting in lower costs <strong>for</strong><br />

beneficiaries and the use <strong>of</strong> the water (from<br />

reservoir) <strong>for</strong> leisure;<br />

• Accomplishment <strong>of</strong> the project will have a<br />

positive influence on the water tariffs <strong>for</strong> the<br />

population and the environmental quality in the<br />

south-west and western area <strong>of</strong> the<br />

municipality;<br />

• Accomplishment <strong>of</strong> the project will increase the<br />

life standards <strong>of</strong> the inhabitants <strong>of</strong> the city and<br />

the quality <strong>of</strong> the environment;<br />

• The project is integrated within the territorial<br />

arrangement, because the dam is the main<br />

objective and its use is a 20 years old project.<br />

The financial requirements <strong>of</strong> the project<br />

• Each economic unit, benefiting by its quota <strong>of</strong><br />

industrial water, is directly proportional with the<br />

water flow requested;<br />

• The work is estimated to 515,000 Euro, <strong>of</strong><br />

which:<br />

- 200,000 Euro <strong>for</strong> dam rehabilitation;<br />

- 300,000 Euro <strong>for</strong> supply pipeline;<br />

- 15,000 Euro <strong>for</strong> the design.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!