19<br />

SIBIU<br />

• Water transportation is carried out through<br />

supply pipelines 75,345 km in length, having<br />

diameters between 250-1,200 mm.<br />

• Water treatment is carried out in the Treatment<br />

Station ST1 Calea Cisnădioarei <strong>for</strong> the waters<br />

coming from the underground sources, and in<br />

the Treatment Station ST2 Dumbrava <strong>for</strong> the<br />

waters coming from surface sources, with an<br />

overall treatment capacity <strong>of</strong> 1,560 l/s.<br />

• Treatment Station <strong>Sibiu</strong> South ST3 is still in the<br />

construction state, being designed <strong>for</strong> a<br />

treatment capacity <strong>of</strong> 400 l/s.<br />

• There are seven storage tanks with a capacity<br />

<strong>of</strong> 34,200 m 3 , to compensate <strong>for</strong> the varying<br />

consumption from the distribution network, as<br />

well as <strong>for</strong> storage in the case <strong>of</strong> fire or other<br />

accidents, and <strong>for</strong> water disinfection.<br />

• The distribution network consists <strong>of</strong> a<br />

framework <strong>of</strong> pipes having diameters between<br />

50 – 1,000 mm, made <strong>of</strong>: 65 % cast iron, 20 %<br />

steel, 2.5 % asbestos-cement, 10 % concrete<br />

tubes, and 2.5 % polyethylene. Seven pumping<br />

stations run within the distribution network, with<br />

buffer tanks, pumping groups and hydrophore<br />

tanks. The distribution is carried out through<br />

314.674 km <strong>of</strong> networks.<br />

• The sewage system <strong>of</strong> <strong>Sibiu</strong> consists <strong>of</strong> a<br />

sewage network having 252,248 km in length,<br />

made <strong>of</strong> concrete tubes, the majority in an<br />

integrated system. On the left bank <strong>of</strong> the Cibin<br />

River, the network is made in a separate<br />

system, but the length <strong>of</strong> pluvial collectors<br />

represents a small part <strong>of</strong> the sum.<br />

• For the evacuation <strong>of</strong> wastewater from the left<br />

bank <strong>of</strong> the Cibin River area there are four<br />

pumping stations, with a total installed capacity<br />

<strong>of</strong> 1,500 m 3 /h.<br />

• Wastewater is transported to the treatment<br />

station through a main collector channel, 5.3<br />

km in length.<br />

• The treatment <strong>of</strong> wastewater is per<strong>for</strong>med in<br />

the Şelimbăr treatment station, built in 1970<br />

and including a mechanical treatment step, with<br />

a capacity <strong>of</strong> 1,500 l/s and a biological<br />

treatment step with a capacity <strong>of</strong> 1, 000 l/s.<br />

WATER NETWORKS STRUCTURE<br />

Materials and operational period (o.p.):<br />

Cast iron 65.09% Operational period 80 years<br />

Iron 18.06% o.p. 40 years<br />

Concrete 9.76% o.p. 30 years<br />

PE 4.60% o.p. 7 years<br />

Azbo 2.43% o.p. 30 years<br />

PVC 0.06% o.p. 25 years<br />

Water network lengths currently operational:<br />

under 10 years between 10-20<br />

years<br />

between 20-30<br />

years<br />

between 30-40<br />

years<br />

between 40-50<br />

years<br />

over 50 years<br />

8 km 62 km 69 km 82 km 10 km 83 km<br />

SEWAGE NETWORK STRUCTURE<br />

Materials and operational period (o.p.):<br />

Concrete 94,43% o.p. 80 years<br />

Rein<strong>for</strong>ced Concrete 4,64% o.p. 35 years<br />

Azbo 0,59% o.p. 30 years<br />

Ceramics 0,16% o.p. 30 years<br />

PE + PVC 0,18% o.p. 5 years