Application 124771 - Ministry of Fisheries
Application 124771 - Ministry of Fisheries Application 124771 - Ministry of Fisheries
CAWTHRON INSTITUTE | REPORT NO. 2134 MAY 2012 Farm 5 Whanganui Island 5 m 100 m from shore 10 m Stocking density = 17 lines 0 20 40 80 120 160 m ± T4 T3 3 Li380 + Li421 T1 Li380 Li421 Li380 0 25 50 100 150 200 m 2 4 1 T2 ± Coromandel Te Kouma Li 380 + Li421 current farm area Li380 currently consented area Li421 currently consented area Li380 farm extension Li380 + Li421 current farm area Li380 farm extension Mussel extent Video transect Sediment Key Gravel Sand Silt and clay 49
MAY 2012 REPORT NO. 2134 | CAWTHRON INSTITUTE 50 Farm 6 10 m 5 m ± T3 4 Li362 Stocking density = 15 lines 140 m from shore 1 T2 Li362 0 20 40 80 120 160 m 2 3 T1 T4 ± 5 m Te Kouma Li362 current farm area Coromandel 0 1530 60 90 120 m Li362 currently consented area Li362 farm extension Sediment Key Li362 current farm area Li362 farm extension Mussel extent Video transect Gravel Sand Silt and clay
- Page 8 and 9: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 10 and 11: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 12 and 13: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 14 and 15: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 16 and 17: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 18 and 19: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 20 and 21: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 22 and 23: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 24 and 25: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 26 and 27: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 28 and 29: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 30 and 31: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 32 and 33: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 34 and 35: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 36 and 37: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 38 and 39: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 40 and 41: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 42 and 43: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 44 and 45: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 46 and 47: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 48 and 49: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 50 and 51: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 52 and 53: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 54 and 55: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 56 and 57: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 60 and 61: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 62 and 63: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 64 and 65: CAWTHRON INSTITUTE | REPORT NO. 213
- Page 66 and 67: To: Waikato Regional Council Privat
- Page 68 and 69: Contents 2 Contents ...............
- Page 70 and 71: 4 marine farm (which expires on 1 J
- Page 72 and 73: 6 2011) identified that the aquacul
- Page 74 and 75: 8 Goodwin E, 2012. Assessment of Be
- Page 76 and 77: 10 4.5.8 The capacity of the wharf
- Page 78 and 79: 12 in Appendix 1 and designed in ac
- Page 80 and 81: 7. Relevant Planning Provisions 14
- Page 82 and 83: 16 the applicant is a member of the
- Page 84 and 85: 7.18 Policy 6.1.3 - (Integrated Man
- Page 86: Appendix 1: Survey plan showing loc
- Page 89: REPORT NO. 2167 COROMANDEL MUSSEL F
- Page 93 and 94: CAWTHRON INSTITUTE | REPORT NO. 216
- Page 95 and 96: CAWTHRON INSTITUTE | REPORT NO. 216
- Page 97 and 98: CAWTHRON INSTITUTE | REPORT NO. 216
- Page 99 and 100: CAWTHRON INSTITUTE | REPORT NO. 216
MAY 2012 REPORT NO. 2134 | CAWTHRON INSTITUTE<br />
50<br />
Farm 6<br />
10 m<br />
5 m<br />
±<br />
T3<br />
4<br />
Li362<br />
Stocking density<br />
= 15 lines<br />
140 m from shore<br />
1<br />
T2<br />
Li362<br />
0 20 40 80 120 160<br />
m<br />
2<br />
3<br />
T1<br />
T4<br />
±<br />
5 m<br />
Te Kouma<br />
Li362 current farm area<br />
Coromandel<br />
0 1530<br />
60 90 120<br />
m<br />
Li362 currently consented area<br />
Li362 farm extension<br />
Sediment Key<br />
Li362 current farm area<br />
Li362 farm extension<br />
Mussel extent<br />
Video transect<br />
Gravel<br />
Sand<br />
Silt and clay