27.10.2013 Views

GaBi Paper Clip Tutorial - GaBi Software

GaBi Paper Clip Tutorial - GaBi Software

GaBi Paper Clip Tutorial - GaBi Software

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.27 Adding a plan<br />

Procedure<br />

We will now add an End of life scenario. We will create the End of life scenario on a<br />

separate plan. By doing this, you could put different waste treatment steps and variations<br />

and recycling processes on this plan and separate the steel flow fraction according to<br />

recycling rates.<br />

We are not quite ready for that level of modelling so, in our example, we just assume that<br />

our paper clip will be sorted out of the municipal waste with a magnetic separator and will<br />

then be recycled. To keep it simple, we will only take the steel recycling process into<br />

account.<br />

75. Go back to the <strong>GaBi</strong> DB Manager, click on ‘Plans’ and then create a new plan by<br />

right clicking in the display window.<br />

76. Name it ‘End of Life <strong>Paper</strong> <strong>Clip</strong>.’<br />

For now we will place only one process on the plan.<br />

77. Click on the ‘Search’ button, search for ‘EAF steel.’<br />

78. Drag and drop it onto the plan<br />

Since each plan requires one fixed process, this process must also be fixed.<br />

79. Double click on the process and set the scaling factor to ‘1’ and select ‘Fixed’ just<br />

like before.<br />

80. Save and close this plan.<br />

55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!