April 19, 2013—South Florida Construction/Lane ... - Florida's Turnpike
April 19, 2013—South Florida Construction/Lane ... - Florida's Turnpike
April 19, 2013—South Florida Construction/Lane ... - Florida's Turnpike
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
TRAFFIC ADVISORY<br />
FOR IMMEDIATE RELEASE Contact:<br />
<strong>April</strong> <strong>19</strong>, 2013 Sonyha Rodriguez-Miller<br />
954-934-1276<br />
SOUTH FLORIDA AND TREASURE COAST<br />
WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY<br />
FORT LAUDERDALE — <strong>Florida</strong>’s <strong>Turnpike</strong> announces updated lane closures and work zones due to construction and<br />
maintenance projects in Miami-Dade, Broward, Palm Beach, Martin and St. Lucie counties, for the week beginning<br />
Sunday, <strong>April</strong> 21.<br />
TURNPIKE SERVICE PLAZA UPDATE<br />
WEST PALM BEACH (MILEPOST 94)<br />
The West Palm Beach Service Plaza restaurant building is closed for renovation. Motorists can still<br />
purchase food and fuel at the newly constructed convenience store.<br />
TOLL PLAZA MAINTENANCE (Various Locations and Roadways)<br />
Routine maintenance work and equipment upgrades at various toll plazas will require lane closures and shifts, and<br />
suspension of tolls at various times and dates in several lanes next week.<br />
This is a moving operation spread over the course of several days, and tolls maybe suspended in one lane at a time while<br />
the work is ongoing. If tolls are suspended, motorists should proceed with caution through the open lane. Customers will<br />
not be charged a toll during a suspension; however, once work in a lane is complete, tolls will be reinstated.<br />
Daytime closures begin at 8 a.m. and continue until 5 p.m., or until the work in each lane is complete. Nighttime work<br />
hours are 9 p.m. to 5 a.m. <strong>Lane</strong> closures will take place at the following <strong>Turnpike</strong> toll plazas:<br />
• Jupiter/Indiantown Road ramp toll plaza (Milepost 116) – Monday, <strong>April</strong> 22, through Friday, <strong>April</strong> 26<br />
• PGA Boulevard ramp toll plaza (Milepost 109) – Monday, <strong>April</strong> 22, through Friday, <strong>April</strong> 26<br />
• S.R. 710/Beeline Highway ramp toll plaza (Milepost 107) – Monday, <strong>April</strong> 22, through Friday, <strong>April</strong> 26<br />
• Lake Worth ramp toll plaza (Milepost 93) – Friday, <strong>April</strong> 26<br />
1
PALM BEACH COUNTY<br />
TURNPIKE ASPHALT MAINTENANCE – BOYNTON BEACH BOULEVARD (MILEPOST 86)<br />
• Southbound <strong>Turnpike</strong> exit and entrance ramps at Boynton Beach Boulevard – Closed between 9 p.m. Sunday, <strong>April</strong><br />
21, and 5 a.m. Monday, <strong>April</strong> 22.<br />
o DETOUR: Southbound <strong>Turnpike</strong> traffic should exit at Lake Worth Road (Exit 93), go west to U.S. 441 and<br />
then south to Boynton Beach Boulevard. Traffic on Boynton Beach Boulevard should head west to U.S. 441,<br />
south to Atlantic Avenue and then east to the <strong>Turnpike</strong> on-ramp.<br />
o It may be necessary to close the ramps Monday night, should weather or other conditions delay the work<br />
Sunday night.<br />
TURNPIKE MILLING AND RESURFACING – 45TH STREET (MILEPOSTS 102-104)<br />
• One of two <strong>Turnpike</strong> lanes in each direction may be closed in the vicinity of 45th Street, between mileposts 102 and<br />
104, from 9 p.m. to 6 a.m. Sunday, <strong>April</strong> 21, through Thursday, <strong>April</strong> 25.<br />
PROJECT DESCRIPTION: The $1.8 million project entails milling, resurfacing and safety upgrades on the <strong>Turnpike</strong><br />
between Milepost 102.5 and Milepost 103.7. Work also includes guardrail resetting, erosion control, pipe desilting, slope<br />
repair, bridge deck spall repairs and expansion joint replacement. It is anticipated the project will be completed in the<br />
summer of 2013.<br />
TURNPIKE BRIDGE REPLACEMENT – PGA BOULEVARD (MILEPOST 109)<br />
• One of two <strong>Turnpike</strong> lanes in each direction may be closed as needed in the vicinity of PGA Boulevard between 9<br />
p.m. and 5 a.m. Sunday, <strong>April</strong> 21, through Thursday, <strong>April</strong> 25.<br />
o Traffic on the <strong>Turnpike</strong>’s northbound entrance ramp from PGA Boulevard also may be stopped for a few<br />
minutes at a time between 10 p.m. and 5 a.m.<br />
PROJECT DESCRIPTION: The <strong>Turnpike</strong>’s PGA Boulevard ramp bridge is being replaced with a higher bridge to provide<br />
additional clearance for tall vehicles. <strong>Construction</strong> began in August 2012. It is anticipated the project will be completed in<br />
the fall of 2013. Approximate cost: $6.2 million.<br />
TURNPIKE BRIDGE REPLACEMENT & INTERCHANGE IMPROVEMENTS – INDIANTOWN ROAD (MILEPOST 116)<br />
• One of two <strong>Turnpike</strong> lanes in each direction may be closed as needed in the vicinity of Indiantown Road from 9 p.m.<br />
Monday to 5 a.m. Sunday, <strong>April</strong> 21, through Thursday, <strong>April</strong> 25.<br />
o Traffic on the <strong>Turnpike</strong>’s northbound exit ramp to Indiantown Road also may be stopped for a few minutes<br />
at a time between 11 p.m. and 4 a.m.<br />
PROJECT DESCRIPTION: The <strong>Turnpike</strong>’s Indiantown Road ramp bridge is being replaced with a higher bridge to provide<br />
additional clearance for tall vehicles. It is anticipated the project will be completed in May 2013. Approximate cost: $4.7<br />
2
million. Work on an interchange improvements project began in <strong>April</strong> and is anticipated to continue through late fall of<br />
2013. The northbound <strong>Turnpike</strong> exit ramp to Indiantown Road will be reconstructed and an additional left-turn lane will be<br />
constructed, for traffic exiting the ramp toll plaza and headed east. Approximate cost: $1.8 million.<br />
PALM BEACH COUNTY PUBLIC WORKS PROJECTS (MILEPOSTS 73-78 and 106)<br />
• One or two <strong>Turnpike</strong> lanes in each direction will be closed at various locations from Southeast 18th Street (Milepost<br />
73) to Yamato Road (Milepost 78) from 9 p.m. to 5 a.m. Sunday, <strong>April</strong> 21, through Thursday, <strong>April</strong> 25, as Palm Beach<br />
County installs fiber optic cable on its bridges. At least one lane in each direction will remain open.<br />
• One of two lanes on the <strong>Turnpike</strong>’s exit ramp to S.R. 710 (Exit 107), west of the toll plaza, will remain closed 24/7<br />
through May 31 as part of a county project to extend Jog Road north to North Lake Boulevard.<br />
• All <strong>Turnpike</strong> ramps at S.R. 710 will be closed from 9 p.m. Tuesday, <strong>April</strong> 23, to 5 a.m. Wednesday, <strong>April</strong> 24.<br />
Should inclement weather interfere with the work on Tuesday night, the interchange closure will be rescheduled for<br />
Wednesday night or Thursday night, <strong>April</strong> 25.<br />
o DETOUR: Motorists should use the PGA Boulevard interchange as an alternate.<br />
MIAMI-DADE COUNTY<br />
TURNPIKE RAMP CONSTRUCTION, BRIDGE WIDENING AND ROAD RESURFACING (MILEPOSTS 9-20)<br />
• One or two southbound <strong>Turnpike</strong> lanes may be closed between Kendall Drive and Coral Reef Drive/Southwest<br />
152nd Street (Exit 16) from 9 p.m. to 5 a.m. Sunday, <strong>April</strong> 21, through Thursday, <strong>April</strong> 25.<br />
PROJECT DESCRIPTION: Work began in October 2011 to construct a new connector ramp for southbound S.R. 874<br />
traffic headed to the southbound <strong>Turnpike</strong> and Southwest 152nd Street/Coral Reef Drive. The southbound <strong>Turnpike</strong> bridge<br />
over the CSX railroad, located north of Southwest 152nd Street, will be widened from two to three lanes and the bridge<br />
handrails will be replaced. Work also includes removing and replacing the top layer of asphalt pavement on the <strong>Turnpike</strong><br />
in the vicinity of Allapattah Road and between the Southwest 152nd Street and Kendall Drive interchanges. <strong>Construction</strong> is<br />
anticipated to continue through the summer of 2013. Approximate cost: $12.3 million.<br />
TURNPIKE INTERCHANGE IMPROVEMENTS AT NORTHWEST 12TH STREET (MILEPOST 27)<br />
• No lane closures this week.<br />
PROJECT DESCRIPTION: The southbound exit ramp to Northwest 12th Street will be widened to accommodate a<br />
second right-turn lane to westbound Northwest 12th Street. Work also includes asphalt milling and resurfacing, traffic<br />
signal improvements, drainage, roadway lighting and pavement markings. <strong>Construction</strong> began in November 2012 and will<br />
be completed in the fall of 2013. Approximate cost: $547,260.<br />
3
GOLDEN GLADES ALL-ELECTRONIC TOLLING AND ROADWAY IMPROVEMENTS<br />
• Southbound <strong>Turnpike</strong> exit to eastbound S.R. 826 – Closed from 10 p.m. to 5 a.m. for three nights, Sunday, <strong>April</strong><br />
21, through Tuesday, <strong>April</strong> 23.<br />
• Southbound <strong>Turnpike</strong> exit to westbound S.R. 826 (Palmetto Expressway) – Closed from 10 p.m. to 5 a.m. for<br />
three nights, Tuesday, <strong>April</strong> 23, through Thursday, <strong>April</strong> 25.<br />
o DETOUR: Traffic will be directed to exit at Northwest <strong>19</strong>9th Street (Exit 2X), go west to Northwest 27th<br />
Avenue and then south to eastbound or westbound S.R. 826.<br />
• One or two <strong>Turnpike</strong> lanes in each direction will be closed in the vicinity of the Golden Glades toll plaza between 9<br />
p.m. and 5 a.m. Sunday, <strong>April</strong> 21, through Thursday, <strong>April</strong> 25.<br />
• One or two lanes in each direction will be closed on <strong>Florida</strong>’s <strong>Turnpike</strong>, north and south of Hollywood Boulevard (in<br />
Broward County), between 9 p.m. and 5 a.m. Sunday, <strong>April</strong> 21, through Thursday, <strong>April</strong> 25.<br />
• One of two northbound lanes will be closed on <strong>Florida</strong>’s <strong>Turnpike</strong> from the <strong>Turnpike</strong> Extension connector at Milepost<br />
47 to south of Hollywood Boulevard at Milepost 49 (in Broward County), from 9 p.m. to 5 a.m. Sunday, <strong>April</strong> 21,<br />
through Thursday, <strong>April</strong> 25.<br />
PROJECT DESCRIPTION: An all-electronic tolling gantry will be constructed to replace the <strong>Turnpike</strong>’s Golden Glades toll<br />
plaza. In addition, a new SunPass-only ramp will be constructed at the Hollywood/Pines Boulevard interchange and the<br />
connector ramp from the <strong>Turnpike</strong>’s Homestead Extension to the northbound <strong>Turnpike</strong> will be widened. Approximate cost:<br />
$<strong>19</strong>.9 million.<br />
BROWARD COUNTY<br />
I-595 EXPRESS CORRIDOR IMPROVEMENT PROJECT (MILEPOSTS 53-55)<br />
Currently, <strong>Florida</strong>’s <strong>Turnpike</strong> is under construction from Peters Road (Milepost 55) to Griffin Road (Exit 53) as part of the<br />
I-595 Express Corridor Improvement Project. Click on the following link for information about project-related upcoming lane<br />
closures or visit the project website at www.i-595.com.<br />
• No lane closures this week.<br />
SAWGRASS EXPRESSWAY AND TURNPIKE SIGN REPLACEMENT<br />
PROJECT DESCRIPTION: A total of 20 sign structures and signs will be constructed on <strong>Florida</strong>’s <strong>Turnpike</strong> in the vicinity<br />
of Red Road and at various locations on the Sawgrass Expressway. <strong>Construction</strong> began in August 2012 and is scheduled<br />
for completion in the summer of 2013. Approximate cost: $1.2 million.<br />
###<br />
www.dot.state.fl.us<br />
Consistent, Predictable, Repeatable<br />
4
<strong>Florida</strong>’s <strong>Turnpike</strong> Enterprise is part of the <strong>Florida</strong> Department of Transportation overseeing a 460-mile system of limited-access toll highways: THE FLORIDA’S TURNPIKE, EXTENDING<br />
NORTH FROM HOMESTEAD IN MIAMI-DADE COUNTY TO WILDWOOD IN SUMTER COUNTY, THE SEMINOLE EXPRESSWAY AND SOUTHERN CONNECTOR (TOLL 417) IN SEMINOLE, ORANGE AND Osceola COUNTIES,<br />
THE BEACHLINE EXPRESSWAY WEST (TOLL 528) IN ORANGE COUNTY, THE POLK PARKWAY (TOLL 570) IN POLK COUNTY, THE VETERANS EXPRESSWAY AND SUNCOAST PARKWAY IN HILLSBOROUGH, PASCO<br />
AND HERNANDO COUNTIES (TOLL 589), THE SAWGRASS EXPRESSWAY (TOLL 869) IN BROWARD COUNTY, AND THE Daniel Webster Western Beltway Part C (Toll 429) in Orange County.<br />
SunPass is the <strong>Florida</strong> Department of Transportation's innovative Prepaid Toll Program. SunPass can be used on <strong>Florida</strong>'s toll roads and most toll bridges. SunPass customers<br />
typically pay 25 cents less than cash customers at most toll plazas and exits on <strong>Turnpike</strong> roads. For information on SunPass®, please contact 1-888-TOLL-FLA (865-5352).<br />
Travelers on the <strong>Florida</strong>’s <strong>Turnpike</strong> system of roads may view real-time traffic information by visiting our website at www.<strong>Florida</strong>s<strong>Turnpike</strong>.com. While traveling in the Orlando,<br />
South <strong>Florida</strong> and Tampa Bay regions, motorists should dial 511 for real-time regional traffic information on the <strong>Turnpike</strong> and other major roads. This information system is voice-activated;<br />
motorists should speak the name of the road they wish to use. They may also visit www.fl511.com for information. This free service of the <strong>Florida</strong> Department of Transportation is available 24/7.<br />
5