26.10.2013 Views

Final Supplemental EIR No. 2 - Metro Gold Line Foothill Extension

Final Supplemental EIR No. 2 - Metro Gold Line Foothill Extension

Final Supplemental EIR No. 2 - Metro Gold Line Foothill Extension

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table ES-1: Permitting Requirements<br />

Agency Type of Permit/Authorization<br />

U.S. Army Corps of Engineers Clean Water Act, Section 404<br />

Regional Water Quality Control Board<br />

Clean Water Act, Section 401<br />

Porter Cologne Water Quality Control Act<br />

Executive Summary<br />

Regional Water Quality Control Board National Pollutant Discharge Elimination System Permits<br />

California Department of Fish and Game<br />

Fish and Game Code, Section 1602 California<br />

Endangered Species Act, Section 2081<br />

<strong>Metro</strong> <strong>Gold</strong> <strong>Line</strong> <strong>Foothill</strong> <strong>Extension</strong> Phase 2A ES-7<br />

<strong>Supplemental</strong> <strong>EIR</strong> <strong>No</strong>. 2 for Additional Project Refinements

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!