Final Supplemental EIR No. 2 - Metro Gold Line Foothill Extension

Final Supplemental EIR No. 2 - Metro Gold Line Foothill Extension Final Supplemental EIR No. 2 - Metro Gold Line Foothill Extension

foothillextension.org
from foothillextension.org More from this publisher
26.10.2013 Views

THIS PAGE INTENTIONALLY BLANK

Executive Summary Background The Pasadena Metro Blue Line Construction Authority/Metro Gold Line Foothill Extension Construction Authority (the “Authority”) initially prepared a Draft Environmental Impact Statement/Environmental Impact Report (the “Draft EIS/EIR”) for the Gold Line Foothill Extension Project (the “Project”). Referred to as Phase 2 of the overall Project and, at complete build out, extending from the cities of Pasadena to Montclair, the Project was divided into two subsequent phases: Phase 2A, spanning from the cities of Pasadena to Azusa, and Phase 2B, spanning from the cities of Azusa to Montclair. Phase 2A includes 11.5 miles of track through six cities (Pasadena, Arcadia, Monrovia, Duarte, Irwindale, and Azusa), six stations, and the construction of a new Maintenance and Operation (M&O) Facility. In conjunction with Authority’s decision to proceed with Phase 2A, a Final EIR was prepared based on the Draft EIS/EIR, though this document was only for the purposes of the Phase 2A extension. It was certified pursuant to the California Environmental Quality Act (CEQA) in February 2007 as the Gold Line Phase II Pasadena to Montclair-Foothill Extension Final Environmental Impact Report (the “2007 Final EIR”). Following certification, additional Project refinements to the design of Phase 2A were identified, and two addenda were prepared to address these refinements. The “Addendum to Gold Line Phase II Extension Project as Certified for Segment 1 (SCH # 2003061157)” dated August 21, 2009 (the “2007 Final EIR Addendum No. 1”) assessed the following Project refinements: Constructing a grade separation and pedestrian crossing over Santa Anita Avenue in the City of Arcadia. Redesigning the Myrtle Avenue/Duarte Road/California Avenue at-grade crossings and relocation of traction power supply substation (TPSS) unit No. 3 due to Station Square transit-oriented development in the City of Monrovia. Shifting the Irwindale Station location approximately 75 feet eastward from the previously proposed location in the City of Irwindale. Eliminating the shift of the freight rail track from the south side to the north side in the City of Azusa. The “Addendum to Gold Line Phase II Extension Project as Certified for Segment 1 (SCH # 2003061157)” dated June 18, 2010 (the “2007 Final EIR Addendum No. 2”) assessed the following Project refinements: Relocating TPSS unit No. 1 due to drainage concerns in the City of Arcadia. Relocating and/or shifting TPSS unit No. 5 to avoid existing improvements (water well/water tanks) and moving the access road in the City of Duarte. Relocating the rail crossover between Station 1026+00 and Station 1031+00 to 1200 feet west of the current location in the City of Monrovia. This refinement also Metro Gold Line Foothill Extension Phase 2A ES-1 Supplemental EIR No. 2 for Additional Project Refinements

Executive Summary<br />

Background<br />

The Pasadena <strong>Metro</strong> Blue <strong>Line</strong> Construction Authority/<strong>Metro</strong> <strong>Gold</strong> <strong>Line</strong> <strong>Foothill</strong> <strong>Extension</strong><br />

Construction Authority (the “Authority”) initially prepared a Draft Environmental Impact<br />

Statement/Environmental Impact Report (the “Draft EIS/<strong>EIR</strong>”) for the <strong>Gold</strong> <strong>Line</strong> <strong>Foothill</strong><br />

<strong>Extension</strong> Project (the “Project”). Referred to as Phase 2 of the overall Project and, at complete<br />

build out, extending from the cities of Pasadena to Montclair, the Project was divided into two<br />

subsequent phases: Phase 2A, spanning from the cities of Pasadena to Azusa, and Phase 2B,<br />

spanning from the cities of Azusa to Montclair. Phase 2A includes 11.5 miles of track through six<br />

cities (Pasadena, Arcadia, Monrovia, Duarte, Irwindale, and Azusa), six stations, and the<br />

construction of a new Maintenance and Operation (M&O) Facility. In conjunction with Authority’s<br />

decision to proceed with Phase 2A, a <strong>Final</strong> <strong>EIR</strong> was prepared based on the Draft EIS/<strong>EIR</strong>, though<br />

this document was only for the purposes of the Phase 2A extension. It was certified pursuant to the<br />

California Environmental Quality Act (CEQA) in February 2007 as the <strong>Gold</strong> <strong>Line</strong> Phase II Pasadena to<br />

Montclair-<strong>Foothill</strong> <strong>Extension</strong> <strong>Final</strong> Environmental Impact Report (the “2007 <strong>Final</strong> <strong>EIR</strong>”).<br />

Following certification, additional Project refinements to the design of Phase 2A were identified, and<br />

two addenda were prepared to address these refinements. The “Addendum to <strong>Gold</strong> <strong>Line</strong> Phase II<br />

<strong>Extension</strong> Project as Certified for Segment 1 (SCH # 2003061157)” dated August 21, 2009 (the<br />

“2007 <strong>Final</strong> <strong>EIR</strong> Addendum <strong>No</strong>. 1”) assessed the following Project refinements:<br />

Constructing a grade separation and pedestrian crossing over Santa Anita Avenue in<br />

the City of Arcadia.<br />

Redesigning the Myrtle Avenue/Duarte Road/California Avenue at-grade crossings<br />

and relocation of traction power supply substation (TPSS) unit <strong>No</strong>. 3 due to Station<br />

Square transit-oriented development in the City of Monrovia.<br />

Shifting the Irwindale Station location approximately 75 feet eastward from the<br />

previously proposed location in the City of Irwindale.<br />

Eliminating the shift of the freight rail track from the south side to the north side in<br />

the City of Azusa.<br />

The “Addendum to <strong>Gold</strong> <strong>Line</strong> Phase II <strong>Extension</strong> Project as Certified for Segment 1 (SCH #<br />

2003061157)” dated June 18, 2010 (the “2007 <strong>Final</strong> <strong>EIR</strong> Addendum <strong>No</strong>. 2”) assessed the following<br />

Project refinements:<br />

Relocating TPSS unit <strong>No</strong>. 1 due to drainage concerns in the City of Arcadia.<br />

Relocating and/or shifting TPSS unit <strong>No</strong>. 5 to avoid existing improvements (water<br />

well/water tanks) and moving the access road in the City of Duarte.<br />

Relocating the rail crossover between Station 1026+00 and Station 1031+00 to 1200<br />

feet west of the current location in the City of Monrovia. This refinement also<br />

<strong>Metro</strong> <strong>Gold</strong> <strong>Line</strong> <strong>Foothill</strong> <strong>Extension</strong> Phase 2A ES-1<br />

<strong>Supplemental</strong> <strong>EIR</strong> <strong>No</strong>. 2 for Additional Project Refinements