26.10.2013 Views

Integrated Integrated Border Management Management Integrated ...

Integrated Integrated Border Management Management Integrated ...

Integrated Integrated Border Management Management Integrated ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Integrated</strong> <strong>Border</strong> <strong>Border</strong> <strong>Management</strong><br />

<strong>Management</strong><br />

Şenol Ş ARSLAN<br />

Project Director<br />

Senior Program Officer<br />

Turkish Ministry of Interior<br />

Project Implementation Directorate of the <strong>Integrated</strong> <strong>Border</strong> <strong>Management</strong><br />

Tel: +905 +905337480130 337480130 - senars@gmail.com<br />

1


The basis of the EU IBM<br />

Concept p in External Assistance<br />

Coordination and<br />

cooperation among all<br />

relevant authorities<br />

and agencies involved<br />

in border control<br />

2


Strategic Goal Goal of the IBM<br />

Effective, efficient and integrated border<br />

management system systems system systems sareensuring<br />

s are ensuring<br />

controlled and secure borders<br />

open p to licit movement of g goods and p people p<br />

3


The Scope of <strong>Border</strong> Security Missions:<br />

*<strong>Border</strong> Guard<br />

*Customs Customs<br />

*Immigration<br />

Department<br />

Four Levels of Activity<br />

*Police Police<br />

BORDER<br />

BORDER AND<br />

*Intelligence<br />

*Legal<br />

Jurisdictions<br />

CONTROL<br />

-surveillance and control<br />

-checks<br />

POLICE<br />

AUTHORITIES<br />

IN<br />

NEIGHBOURING<br />

(Courts)<br />

COUNTRIES<br />

*Law<br />

Enforcement<br />

Agencies<br />

(Prisons)<br />

EMBASSY AND<br />

CONSULATES<br />

4


<strong>Integrated</strong> I I<strong>Integrated</strong> t t d <strong>Border</strong> B d <strong>Management</strong><br />

M t<br />

International co-operation<br />

IInter-agency co-operation i<br />

Intra-service co-operation<br />

5


Intra Intra-service service service Cooperation<br />

<strong>Border</strong><br />

Inspection<br />

Customs<br />

Guards<br />

Service<br />

6


Inter Inter-agency Inter Inter-agency agency Cooperation<br />

Sanitary<br />

Inspection Inspect on<br />

<strong>Border</strong><br />

Guards<br />

Customs<br />

Veterinary<br />

Inspection<br />

Phytosanitary<br />

Inspection<br />

Transport<br />

CControl t l<br />

7


International Cooperation<br />

B<strong>Border</strong> d B<strong>Border</strong> d<br />

Guards<br />

Guards<br />

Customs Customs<br />

Inspection Inspection<br />

Service Service<br />

8


St Starting ti point i t f for the th IBM<br />

IBM<br />

“<strong>Integrated</strong> <strong>Integrated</strong> <strong>Border</strong> <strong>Management</strong>” <strong>Management</strong> strategy<br />

A NationallAction Plan l ddesign andd<br />

implementation process<br />

9


7 Railway <strong>Border</strong><br />

Crossing Points<br />

BULGARIA<br />

BORDER : 269 KM.<br />

GREECE<br />

BORDER : 203 KM.<br />

SEA BORDERS:<br />

6530 KM<br />

49 Sea <strong>Border</strong><br />

Crossing Points<br />

REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

43 Air <strong>Border</strong><br />

Crossing Points<br />

IN TOTAL:<br />

9479 KM.<br />

119 <strong>Border</strong><br />

Crossing<br />

Points<br />

SYRIA BORDER : 911 KM.<br />

GEORGIA BORDER : 276 KM.<br />

ARMENIA BORDER: 328 KM.<br />

AZERBAIJAN (NAHCHIVAN)<br />

( )<br />

BORDER : 18 KM.<br />

IRAN BORDER: 560KM.<br />

IRAQ BORDER :384 KM.<br />

20 Land <strong>Border</strong> Crossing<br />

Points<br />

10


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

DDuties ti of f <strong>Border</strong> B d Security S it Agencies<br />

A i<br />

11


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Custom Enforcements<br />

• Preventing, pursuing and investigating of any kind of smuggling,<br />

• Preventing the persons, goods and vehicles from leaving custom zones<br />

until their transactions are complete, p ,<br />

• To monitor and protect custom zones,<br />

• To set up and operate research laboratories to assist the investigation<br />

tasks performed performed.


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

General Directorate of Security<br />

•To check travel documents and to perform legal procedures when there is an<br />

offense,<br />

•To check the visas of the aliens,<br />

•To complete the deportation procedures for the aliens to be deported deported,<br />

•To carry out necessary procedures concerning the admission of the immigrants,<br />

•To implement procedures for the entry of the Turkish citizens deported from other<br />

countries,<br />

•To complete the procedures for inadmissible passengers<br />

passengers,<br />

•To perform criminal investigation,<br />

•To ensure the contact of the asylum-seekers with the police in charge of the<br />

aliens,<br />

•To take measures to prevent the entrance of weapons, weapons explosives, explosives and goods goods,<br />

•To prevent illegal entry and exit,<br />

•To perform general law enforcement duties.


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Land Forces Command &<br />

Gendarmerie General Command<br />

•Protecting and ensuring the security of the zone under their responsibility,<br />

•Preventing smuggling at the customs line and preventing the acts which constitute<br />

offenses and apprehending the offenders within the first degree forbidden military zones<br />

set up along the land borders and conducting legal proceedings, delivering the<br />

apprehended persons and evidence to the local law enforcement units,<br />

•Applying the provisions of the rights of Members of Foreign Combat Forces to apply for<br />

refuge in Turkey to the members of foreign combat forces who cross the land borders to<br />

seek asylum, disarming other refugees, divesting them from the arms, munitions and<br />

other war means and deliver the refugees with their arms, munitions and other war<br />

means to the authorities concerned.


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Coast Guard Command<br />

• To perform the duties and to exercise the powers assigned to and vested<br />

with it in all coasts of Turkey,<br />

• T To protect t tand d ensure th the security it of f the th coasts t and d territorial,<br />

t it i l<br />

• To prevent and watch all kinds of smuggling performed through the seas,<br />

• To take necessary protection measures to the explosives and suspicious<br />

objects detected on the sea and in the Territory,<br />

• T To watch t h and d control t l the th operational ti l status t t of f navigational i ti l aids, id<br />

• To perform search and rescue missions within the search and rescue area of<br />

Turkey, in accordance with the International Search and Rescue Convention,<br />

• To disarming the refugees entering into Turkish territorial waters,<br />

• SSupportt other th security it forces, f<br />

• Within the same scope, to accompany and protect the vessels carrying<br />

dangerous loads,


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

<strong>Border</strong> Security Studies in n Turkey<br />

16


STRATEGY PAPER<br />

REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

The Strategy Paper drawn up all<br />

tasks at land and maritime<br />

borders and border gates to<br />

combat trafficking and illegal<br />

crossing and the security of the<br />

bborder d gates; t passenger entry t<br />

and exit, passport checks and<br />

prevention of forgery, removal<br />

and deportation procedures;<br />

security of the borders and<br />

physical p y measures, , should be<br />

performed by a single authority.<br />

17


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

INTEGRATED BORDER BORDER MANAGEMENT TWINNING<br />

PROJECT<br />

As an expected output of the Turkey-EU Twinning Project on<br />

<strong>Integrated</strong> <strong>Border</strong> <strong>Management</strong> in Turkey, an Action Plan was<br />

released and submitted to the EU Commission<br />

Commission.<br />

18


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Action Plan<br />

The Action Plan identify requirements for legislative<br />

alignments, institutional reforms, staffing and training and<br />

what further equipment and infrastructure should be<br />

deployed in order to ensure reinforced protection at the<br />

borders to attain best practices level to the extent possible.<br />

ThePlanalsoset prioritiesfor the most urgent investments<br />

needed.<br />

19


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Principles<br />

• Checking and surveillance<br />

• Coverage for humans, humans animals, animals vehicles and objects<br />

• A single architecture and related common standards<br />

• National experience p + international better practices p<br />

• Knowledge management, information sharing, and<br />

intelligent analysis<br />

• Human and infrastructural capacity building<br />

• Centrally managed operations and technology<br />

• Technical cooperation between agencies<br />

• EEquipment i t sharing h i protocols t l<br />

• Categorization and prioritization (based on risk analysis)<br />

• Parallel pilot p pprojects j<br />

• Multi-year investment planning<br />

20


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Main & Prioritized Activities - Timeline<br />

Legislative arrangements<br />

[2006–2009]<br />

Feasibility study [2006–2007]<br />

Systems, y , infrastructure<br />

and staffing [2007–2014]<br />

2006 2007 2009 2014<br />

Transfer of duties and<br />

powers [2014- ]<br />

21


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

R Requirements i t<br />

• Infrastructural needs for <strong>Border</strong> surveillance: Land borders, Sea<br />

bborders; d Ai Air bborders d<br />

• Infrastructural needs for <strong>Border</strong> control: <strong>Border</strong> gates; Fixed check<br />

points; Mobile check points<br />

• M<strong>Management</strong> t SSystems t SSupported t d bby CCentralized t li d IT<br />

– Institutional Infrastructure Systems<br />

• HR<br />

• Security, Authentication and Access<br />

• Data Fusion, BI<br />

• Secure External Gatewayy to <strong>Border</strong> <strong>Management</strong> g Services<br />

• Communications Infrastructure<br />

– Inter-Institutional <strong>Integrated</strong> Information Systems<br />

• Inter-Institutional Inter Institutional Information Exchange Data Bus<br />

• .......<br />

22


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Positional View – Turkish <strong>Border</strong> Security<br />

23


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

General Architectural View<br />

• Infrastructure and management<br />

• Common service components<br />

• Core business components<br />

• Support components<br />

• Front end components<br />

• Process and data integration<br />

24


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Technology gy Picture<br />

25


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Action Plan on <strong>Integrated</strong> <strong>Border</strong> <strong>Management</strong><br />

<strong>Management</strong>-Phase <strong>Management</strong> Phase 1<br />

The First Project - Assessment<br />

• Legislative, organizational and procedural framework<br />

• IT Governance organization<br />

• Needs assessment<br />

•<br />

•<br />

System architecture and information model, interoperability<br />

standards, authentication and access control requirements,<br />

interface definitions definitions, integration bus requirements and<br />

specification, key communication flows and message exchange<br />

formats, GIS data exchange standards, biometric data exchange<br />

standards<br />

Risk analysis, security policy<br />

• Operational process standards<br />

• Pilots for gates g and surveillance areas<br />

• Institutional structure (ref “Training System”)<br />

26


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Means<br />

1. TWINNING :Legal and Institutional Framework<br />

2. TA : Drawing up Procedural and Technical Frameworks<br />

for the Roadmap<br />

– Roadmap p and <strong>Border</strong> Gate Survey y<br />

– Sub-Component 2. <strong>Border</strong> Surveillance Area Survey<br />

33. SUPPLY : PPrototype t t <strong>Border</strong> B d <strong>Management</strong> M t System S t<br />

27


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Key Issues Summarized<br />

• Unified solution, system and information<br />

architecture<br />

• Governance<br />

• Change management<br />

• Cultural (personal, organizational) barriers<br />

28


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Implementation<br />

Within the framework of <strong>Integrated</strong> <strong>Border</strong> <strong>Management</strong>, it<br />

would be useful to take into consideration these points. A<br />

step-by-step t b t approachh iis advisable di bliin th the context t t off efforts ff t tto<br />

adopt best practices.<br />

29


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

Related Projects<br />

• TR 02 JH 02 Support for the Development of an Action Plan to implement<br />

Turkey’s <strong>Integrated</strong> <strong>Border</strong> <strong>Management</strong> Strategy<br />

• TR 04 JH 04 Development of a Training System for <strong>Border</strong> Police<br />

• TR 03 JH 05 Visa Policy and Practice<br />

• TR 02 JH 03 Support for the development of an Action Plan to implement<br />

Turkey’s asylum and migration strategy<br />

• TR 03 JH 03 Strengthening Institutions in the Fight against Trafficking in<br />

Human Beings<br />

• TR 06 IB JH 01 Support to the set up an Asylum and Country of Origin<br />

Information (COI) System<br />

• TR 07 IB JH 04 Action Plan on <strong>Integrated</strong> <strong>Border</strong> <strong>Management</strong>-Phase 1<br />

• TR 07 IB JH 03 Establishment of a Reception, Screening and<br />

Accommodation System (Centres) for asylum seekers and refugees<br />

• TR 07 IB JH 05 SSupport t tto TTurkey’s k ’ CCapacity it iin CCombating b ti Ill Illegal l<br />

Migration and Establishment of Removal Centres for Illegal Migrants<br />

• ....<br />

30


REPUBLIC OF TURKEY<br />

MINISTRY OF INTERIOR<br />

Project Implementation Directorate of the IBM<br />

THANK YOU FOR YOUR ATTENTION<br />

Şenol ARSLAN<br />

Project Director<br />

Senior Program Officer<br />

Turkish Ministry of Interior<br />

Project Implementation Directorate of the <strong>Integrated</strong> <strong>Border</strong> <strong>Management</strong><br />

Tel: +905337480130 - senars@gmail.com<br />

31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!