Corporate Fact Sheet - G-Resources

Corporate Fact Sheet - G-Resources Corporate Fact Sheet - G-Resources

g.resources.com
from g.resources.com More from this publisher
26.10.2013 Views

INVESTOR RELATIONS Should you have a query or require further information on G-Resources, please visit the company’s website: www.g-resources.com Investor.relations@g-resources.net Tracey Fanning Investor Relations & Communications Coordinator T: +852 3610 6726 F: +852 3590 6094 M: +852 6627 7782 E: tracey.fanning@g-resources.net The Martabe Project: Resources and Reserves As at 5th September 2011 Mineral Resources are 7.46Moz of gold and 72.60Moz of silver at an average grade of 1.4g/t gold and 13.6g/ t of silver. Cash operating costs are expected to be low by international standards because of Martabe’s competitive strengths including; scale, good grade, all surface deposits, location, long life and upside. Ore Reserves from Purnama, Barani and Ramba Joring total 3.03Moz of gold and 33.63Moz of silver in 45.5Mt of ore at a grade of 2.1g/t gold and 23.0g/t of silver. The Martabe Project: Competitive Strength Based on the current reserves only, the life of the mine is expected to be more than ten years, with annual production of approximately 250,000oz of gold and 2-3Moz of silver. The Martabe Project: Exploration Upside The Martabe COW consists of 1,639 km 2 within the highly prospective Sumatran gold belt, which outside of the immediate Martabe area has been relatively underexplored. The Gambir-Kapur district is the only area on the COW, outside the immediate Martabe area, where drilling has been conducted by previous owners. Outstanding intersections have been recorded from this early work.

INVESTOR RELATIONS<br />

Should you have a query or require<br />

further information on G-<strong>Resources</strong>,<br />

please visit the company’s website:<br />

www.g-resources.com<br />

Investor.relations@g-resources.net<br />

Tracey Fanning<br />

Investor Relations &<br />

Communications Coordinator<br />

T: +852 3610 6726<br />

F: +852 3590 6094<br />

M: +852 6627 7782<br />

E: tracey.fanning@g-resources.net<br />

The Martabe Project: <strong>Resources</strong> and Reserves<br />

As at 5th September 2011 Mineral <strong>Resources</strong> are 7.46Moz of gold<br />

and 72.60Moz of silver at an average grade of 1.4g/t gold and 13.6g/<br />

t of silver.<br />

Cash operating costs are expected to be low by international standards<br />

because of Martabe’s competitive strengths including; scale,<br />

good grade, all surface deposits, location, long life and upside.<br />

Ore Reserves from Purnama, Barani and Ramba Joring total<br />

3.03Moz of gold and 33.63Moz of silver in 45.5Mt of ore at a grade<br />

of 2.1g/t gold and 23.0g/t of silver.<br />

The Martabe Project: Competitive Strength<br />

Based on the current reserves only, the life of the mine is expected<br />

to be more than ten years, with annual production of approximately<br />

250,000oz of gold and 2-3Moz of silver.<br />

The Martabe Project: Exploration Upside<br />

The Martabe COW consists of 1,639 km 2 within the highly prospective<br />

Sumatran gold belt, which outside of the immediate Martabe area<br />

has been relatively underexplored.<br />

The Gambir-Kapur district is the only area on the COW, outside the<br />

immediate Martabe area, where drilling has been conducted by previous<br />

owners. Outstanding intersections have been recorded from<br />

this early work.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!