Master Plan Update - Florida's Turnpike
Master Plan Update - Florida's Turnpike Master Plan Update - Florida's Turnpike
24 MASTER PLAN ANNUAL UPDATE figure 6.4 - turnpike - northern coin system SUMTER Okahumpka Service Plaza 75 75 I FPN: 406110-1 I-75 Interchange Modification (MP 309) 301 W FPN: 423375-1 S.R. 50 to Leesburg So. (MP 272-285) (widen to 6 lanes) Year Needed: 2025 I New Interchange at Hills of Minneola (MP 279) (to be funded by others) I T W S 98 LEGEND Interchange Toll Plaza Widening Service Plaza Project Under Construction Funded in 10-year Finance Plan Project in Needs Plan Interchange Project 4 Number of Lanes Exist. + Under Constr. 2 4 6 8 Toll Plaza Turnpike Interchange Service Plaza 0 2 4 6 8 Miles 4 19 17 MARION I New Half-Interchange at C.R. 468 (MP 302) (to be funded by others) S FPN: 422418-1 Okahumpka Service Plaza Reconstruction (MP 299) Construction Year: 2013 LAKE LEESBURG SO. S FPN: 422418-3 Turkey Lake Service Plaza Reconstruction (MP 263) W FPN: 423375-1 Leesburg North (U.S. 27) to C.R. 468 (MP 289-300) (widen to 6 lanes) Year Needed: 2035 T Conversion to All-Electronic Tolling, Phase 7 All Plazas (MP 240 - 296) POLK 50 BEULAH RD I FPN: 429332-1 I-4 Interchange Widen SB Off-Ramp & SB On-Ramp (MP 259) Construction Year: 2013 W FPN: 411406-1 Central Florida Greeneway to Beachline Expwy. (MP 251-254) (widen to 8 lanes) Year Needed: 2020 W U.S. 192/441 N. to Osceola Parkway (MP 244-251) (widen to 6 lanes) Year Needed: 2020 W Kissimmee Park Rd. to U.S. 192/441 S. (MP 240-242) (widen to 6 lanes) Year Needed: 2030 27 4 44 Turkey Lake Service Plaza OSCEOLA PARKWAY 192 4 KISSIMMEE PARK RD 92 VOLUSIA W FPN: 406146-1 N. of Beulah Road to S.R. 50 (MP 269-272) (widen to 8 lanes) I FPN: 429331-1 I-4 Interchange Widen NB Exit Ramp (MP 259) Construction Year: 2013 I New Interchange at Sand Lake Rd. (MP 257) OSCEOLA Canoe Creek Service Plaza ORANGE I FPN: 243017-1 New Interchange at S.R. 417 (MP 251) (partial funding by Turnpike)
FY 2011 - FY 2035 figure 6.5 - southern connector extension, beachline West expressway, seminole expressway I T W Interchange Toll Plaza Widening LEGEND Project Under Construction Funded in 10-year Finance Plan Project in Needs Plan Project in Needs Plan Number of Lanes Exist. + Under Constr. 4 4 6 Toll Plaza Turnpike Interchange 0 1 2 3 4 Miles W FPN: 406090-5 I-4 to Orangewood Blvd. (MP 0-2) (widen to 6 lanes) Year Needed: 2015 Celebration Toll Plaza LAKE T Conversion to All-Electronic Tolling, Phase 7 Western Beltway, All Plazas (MP 1 - 11) 441 T Conversion to All-Electronic Tolling, Phase 7 Seminole Expressway, All Plazas (MP 38 - 52) W FPN: 417545-1 Orange-Seminole Co. Line to S.R. 434 (MP 37-44) (widen to 6 lanes) Year Needed: 2025 McCOY RD Beach lin e Expressway Southern Connec tor Extension T Conversion to All-Electronic Tolling, Phase 7 Southern Connector, All Plazas (MP 1 - 3) 4 4 W S.R. 434 to C.R. 427 (MP 44-49) (widen to 6 lanes) Year Needed: 2030 I FPN: 427690-1 Aloma Ave., Widen Ramps to/from So. (MP 38) Construction Year: 2013 W Orange-Seminole Co. Line to Red Bug Lake Rd. (MP 37-41) (widen to 8 lanes) Year Needed: 2035 46A 427 Lake Jesup Toll Plaza 434 ALOMA W FPN: 406090-5 John Young Pkwy. to Florida's Turnpike (MP 3-4) (widen to 6 lanes) Year Needed: 2020 Semi nole Expressway T Conversion to All-Electronic Tolling, Phase 7 Beachline Expressway, Beachline West Plaza (MP 6) W FPN: 406090-5 Orangewood Blvd. to John Young Pkwy. (MP 2-3) (widen to 8 lanes) Year Needed: 2015 SEMINOLE ORANGE 25
- Page 1: Master Plan Update FY 2011 - FY 203
- Page 5 and 6: 1.0 introduction MASTER PLAN UPDATE
- Page 7 and 8: available revenues, the estimated t
- Page 9 and 10: system-wide project to convert turn
- Page 11 and 12: Florida’s Turnpike over I-595 thi
- Page 13 and 14: line, and merges into the right sid
- Page 15 and 16: toll plaza. This improvement modifi
- Page 17 and 18: 5.0 list of taBles table 5.1 ten-Ye
- Page 19 and 20: table 5.1 ten-Year finance Plan (fY
- Page 21 and 22: table 5.3 Unfunded needs Plan Widen
- Page 23 and 24: 6.0 list of figures fIgUre 6.1 home
- Page 25 and 26: figure 6.1 - homestead extension of
- Page 27: S figure 6.3 - turnpike - ticket sy
- Page 31 and 32: figure 6.7 - veterans expressway an
FY 2011 - FY 2035<br />
figure 6.5 - southern connector extension, beachline West expressway,<br />
seminole expressway<br />
I<br />
T<br />
W<br />
Interchange<br />
Toll Plaza<br />
Widening<br />
LEGEND<br />
Project Under Construction<br />
Funded in 10-year Finance <strong>Plan</strong><br />
Project in Needs <strong>Plan</strong><br />
Project in Needs <strong>Plan</strong><br />
Number of Lanes Exist. + Under Constr.<br />
4<br />
4 6<br />
Toll Plaza<br />
<strong>Turnpike</strong> Interchange<br />
0 1 2 3 4 Miles<br />
W<br />
FPN: 406090-5<br />
I-4 to Orangewood Blvd. (MP 0-2)<br />
(widen to 6 lanes)<br />
Year Needed: 2015<br />
Celebration<br />
Toll Plaza<br />
LAKE<br />
T<br />
Conversion to All-Electronic Tolling, Phase 7<br />
Western Beltway, All Plazas (MP 1 - 11)<br />
441<br />
T<br />
Conversion to All-Electronic Tolling, Phase 7<br />
Seminole Expressway, All Plazas (MP 38 - 52)<br />
W<br />
FPN: 417545-1<br />
Orange-Seminole Co. Line to S.R. 434 (MP 37-44)<br />
(widen to 6 lanes)<br />
Year Needed: 2025<br />
McCOY RD<br />
Beach lin e Expressway<br />
Southern Connec tor<br />
Extension<br />
T<br />
Conversion to All-Electronic Tolling, Phase 7<br />
Southern Connector, All Plazas (MP 1 - 3)<br />
4<br />
4<br />
W<br />
S.R. 434 to C.R. 427 (MP 44-49)<br />
(widen to 6 lanes)<br />
Year Needed: 2030<br />
I<br />
FPN: 427690-1<br />
Aloma Ave., Widen Ramps to/from So. (MP 38)<br />
Construction Year: 2013<br />
W<br />
Orange-Seminole Co. Line to Red Bug Lake Rd. (MP 37-41)<br />
(widen to 8 lanes)<br />
Year Needed: 2035<br />
46A<br />
427<br />
Lake Jesup<br />
Toll Plaza<br />
434<br />
ALOMA<br />
W<br />
FPN: 406090-5<br />
John Young Pkwy. to <strong>Florida's</strong> <strong>Turnpike</strong> (MP 3-4)<br />
(widen to 6 lanes)<br />
Year Needed: 2020<br />
Semi nole Expressway<br />
T<br />
Conversion to All-Electronic Tolling, Phase 7<br />
Beachline Expressway, Beachline West Plaza (MP 6)<br />
W<br />
FPN: 406090-5<br />
Orangewood Blvd. to John Young Pkwy. (MP 2-3)<br />
(widen to 8 lanes)<br />
Year Needed: 2015<br />
SEMINOLE<br />
ORANGE<br />
25