MASTER PLAN ANNUAL UPDATE<br />
figure 6.4 - turnpike - northern coin system<br />
SUMTER<br />
Okahumpka Service Plaza<br />
75<br />
75<br />
I FPN: 406110-1<br />
I-75 Interchange Modification (MP 309)<br />
301<br />
W FPN: 423375-1<br />
S.R. 50 to Leesburg So. (MP 272-285)<br />
(widen to 6 lanes)<br />
Year Needed: 2025<br />
I New Interchange at Hills of Minneola (MP 279)<br />
(to be funded by others)<br />
I<br />
T<br />
W<br />
S<br />
98<br />
LEGEND<br />
Interchange<br />
Toll Plaza<br />
Widening<br />
Service Plaza<br />
Project Under Construction<br />
Funded in 10-year Finance <strong>Plan</strong><br />
Project in Needs <strong>Plan</strong><br />
Interchange Project<br />
4<br />
Number of Lanes Exist. + Under Constr.<br />
2 4 6 8<br />
Toll Plaza<br />
<strong>Turnpike</strong> Interchange<br />
Service Plaza<br />
0 2 4 6 8 Miles<br />
4<br />
19<br />
17<br />
MARION<br />
I<br />
New Half-Interchange at C.R. 468 (MP 302)<br />
(to be funded by others)<br />
S<br />
FPN: 422418-1<br />
Okahumpka Service Plaza Reconstruction (MP 299)<br />
Construction Year: 2013<br />
LAKE<br />
LEESBURG SO.<br />
S FPN: 422418-3<br />
Turkey Lake Service Plaza Reconstruction (MP 263)<br />
W FPN: 423375-1<br />
Leesburg North (U.S. 27) to C.R. 468 (MP 289-300)<br />
(widen to 6 lanes)<br />
Year Needed: 2035<br />
T Conversion to All-Electronic Tolling, Phase 7<br />
All Plazas (MP 240 - 296)<br />
POLK<br />
50<br />
BEULAH RD<br />
I<br />
FPN: 429332-1<br />
I-4 Interchange Widen SB Off-Ramp & SB On-Ramp (MP 259)<br />
Construction Year: 2013<br />
W FPN: 411406-1<br />
Central Florida Greeneway to Beachline Expwy. (MP 251-254)<br />
(widen to 8 lanes)<br />
Year Needed: 2020<br />
W U.S. 192/441 N. to Osceola Parkway (MP 244-251)<br />
(widen to 6 lanes)<br />
Year Needed: 2020<br />
W Kissimmee Park Rd. to U.S. 192/441 S. (MP 240-242)<br />
(widen to 6 lanes)<br />
Year Needed: 2030<br />
27<br />
4<br />
44<br />
Turkey Lake<br />
Service Plaza<br />
OSCEOLA PARKWAY<br />
192<br />
4<br />
KISSIMMEE PARK RD<br />
92<br />
VOLUSIA<br />
W FPN: 406146-1<br />
N. of Beulah Road to S.R. 50 (MP 269-272)<br />
(widen to 8 lanes)<br />
I FPN: 429331-1<br />
I-4 Interchange Widen NB Exit Ramp (MP 259)<br />
Construction Year: 2013<br />
I<br />
New Interchange at Sand Lake Rd. (MP 257)<br />
OSCEOLA<br />
Canoe Creek Service Plaza<br />
ORANGE<br />
I FPN: 243017-1<br />
New Interchange at S.R. 417 (MP 251)<br />
(partial funding by <strong>Turnpike</strong>)