figure 6.1 - homestead extension of florida’s turnpike (heft)<br />
I<br />
W<br />
FPN: 429328-1<br />
NW 57th Ave. to Miramar Toll Plaza (MP 27 43-47)<br />
(widen to 6 lanes)<br />
Construction Year: 2020<br />
W<br />
FPN: 423371-1<br />
I-75 to E. of NW 57th Ave. (MP 39-45)<br />
(widen to 6 lanes)<br />
Year Needed: 2035<br />
I<br />
New Interchange at NW 170th St. (MP 37)<br />
(to be funded by others)<br />
W FPN: 423371-1<br />
Okeechobee Rd. to I-75 (MP 35-39)<br />
(widen to 8 lanes)<br />
Year Needed: 2020<br />
W<br />
FPN: 427685-1<br />
NW 74th St. to NW 106th St. (MP 31-34)<br />
(widen to 8 lanes)<br />
Construction Year: 2013<br />
NW 41st St. Interchange Improvements (MP 29)<br />
W<br />
FPN: 406096-4<br />
Bird Rd. (SW 40th St.) to S.R. 836 (MP 23 - 26)<br />
(widen to 8 lanes + aux. lanes)<br />
W<br />
FPN: 415051-4<br />
60th St. Canal to S.R. 836 (MP 22-26)<br />
(widen to 10 lanes + aux. lanes)<br />
Year Needed: 2020<br />
I<br />
FPN: 429329-1<br />
Bird Rd. Widen Ramps, Improve Intersections (MP 23)<br />
Construction Year: 2013<br />
W<br />
FPN: 427146-1<br />
Kendall Dr. to Bird Rd. (MP 20-23)<br />
(widen to 8 lanes)<br />
Construction Year: 2014<br />
I<br />
FPN: 427689-1<br />
Kendall Dr. Ramp Intersection Improvements (MP 20)<br />
Construction Year: 2014<br />
S<br />
FPN: 422418-8<br />
Snapper Creek Service Plaza Reconstruction (MP 19)<br />
W<br />
FPN: 415488-1<br />
SW 216th St. to Caribbean Dr. (MP 11-12)<br />
(widen to 6 lanes)<br />
Year Needed: 2025<br />
W<br />
FPN: 423372-1<br />
Tallahassee Rd. to SW 216th St. (MP 6-11)<br />
(widen to 8 lanes)<br />
Year Needed: 2015<br />
W<br />
FPN: 423372-1<br />
Campbell Dr. to Biscayne Dr. (MP 2-5)<br />
(widen to 6 lanes)<br />
Year Needed: 2030<br />
SW 8TH STREET<br />
CAMPBELL DR<br />
BISCAYNE DR<br />
BROWARD<br />
1<br />
SW 117TH AVE.<br />
27<br />
75<br />
Okeechobee<br />
Toll Gantry<br />
MIAMI-<br />
DADE<br />
Bird Road South Toll Gantry W FPN: 415051-1<br />
Bird Road North Toll Gantry Kendall Dr. to 60th St. Canal (MP 20-22)<br />
(widen to 10 lanes + aux. lanes)<br />
Year Needed: 2025<br />
Snapper Creek<br />
Service Plaza<br />
EUREKA DRIVE<br />
SW 216TH ST.<br />
Homestead Toll Gantry<br />
I<br />
New Half-Interchange at Lucy St. (MP 1)<br />
(to be funded by others)<br />
NW 57TH AVE.<br />
Miramar Toll Gantry<br />
I<br />
FPN: 251938-1<br />
I-75 Interchange Modification (MP 39)<br />
W FPN: 423371-1<br />
NW 106th St. to Okeechobee Rd. (MP 34-35)<br />
(widen to 10 lanes)<br />
Year Needed: 2020<br />
T FPN: 417547-1<br />
Conversion to All-Electronic Tolling, Phase 3<br />
S.R. 836 to <strong>Turnpike</strong> Mainline, All Plazas (MP 26 - 47)<br />
W<br />
FPN: 423371-1<br />
S.R. 836 to NW 106th St. (MP 26-34)<br />
(widen to 10 lanes + aux. lanes)<br />
Year Needed: 2025<br />
I<br />
FPN: 429325-1<br />
SW 8th St. Widen, Realign SB Exit Ramp<br />
Construction Year: 2013<br />
41<br />
T<br />
FPN: 406096-4<br />
Conversion to All-Electronic Tolling, Phase 2<br />
Kendall Dr. to S.R. 836, All Plazas (MP 18 - 25)<br />
W<br />
FPN: 406096-1<br />
S.R. 874 to Kendall Dr. (MP 18-20)<br />
(widen to 8 lanes)<br />
Year Needed: 2020<br />
W<br />
FPN: 406096-1<br />
N. of Eureka Dr. to S.R. 874 (MP 13-18)<br />
(widen to 12 lanes + aux. lanes)<br />
Year Needed: 2020<br />
W<br />
FPN: 415488-1<br />
Caribbean Dr. to N. of Eureka Dr. (MP 12-13)<br />
(widen to 10 lanes)<br />
Year Needed: 2015<br />
T FPN: 417544-1<br />
Conversion to All-Electronic Tolling, Phase 1<br />
Campbell Dr. to S.W. 120th St., All Plazas (MP 2-16)<br />
W<br />
FPN: 423372-1<br />
Biscayne Dr. to Tallahassee Rd. (MP 5-6)<br />
(widen to 6 lanes)<br />
Year Needed: 2020<br />
FY 2011 - FY 2035<br />
95<br />
Golden Glades Toll Plaza<br />
I<br />
FPN: 426155-1<br />
S.R. 874 New SB Ramp/Add Lane to SB Mainline (MP 16-18)<br />
Construction Year: 2011<br />
195<br />
1<br />
I<br />
Golden Glades<br />
Interchange Modification (MP 0X)<br />
I<br />
Interchange<br />
T Toll Plaza<br />
W<br />
S<br />
Widening<br />
Service Plaza<br />
Interchange Project<br />
Toll Plaza<br />
<strong>Turnpike</strong> Interchange<br />
Service Plaza<br />
LEGEND<br />
Atlantic<br />
Ocean<br />
Project Under Construction<br />
Funded in 10-year Finance <strong>Plan</strong><br />
Project in Needs <strong>Plan</strong><br />
Number of Lanes Exist. + Under Constr.<br />
4 6 8 10<br />
0 1 2 3 4 Miles<br />
21