Master Plan Update - Florida's Turnpike

Master Plan Update - Florida's Turnpike Master Plan Update - Florida's Turnpike

floridasturnpike.com
from floridasturnpike.com More from this publisher
26.10.2013 Views

20 MASTER PLAN ANNUAL UPDATE this Page Intentionally left blank

figure 6.1 - homestead extension of florida’s turnpike (heft) I W FPN: 429328-1 NW 57th Ave. to Miramar Toll Plaza (MP 27 43-47) (widen to 6 lanes) Construction Year: 2020 W FPN: 423371-1 I-75 to E. of NW 57th Ave. (MP 39-45) (widen to 6 lanes) Year Needed: 2035 I New Interchange at NW 170th St. (MP 37) (to be funded by others) W FPN: 423371-1 Okeechobee Rd. to I-75 (MP 35-39) (widen to 8 lanes) Year Needed: 2020 W FPN: 427685-1 NW 74th St. to NW 106th St. (MP 31-34) (widen to 8 lanes) Construction Year: 2013 NW 41st St. Interchange Improvements (MP 29) W FPN: 406096-4 Bird Rd. (SW 40th St.) to S.R. 836 (MP 23 - 26) (widen to 8 lanes + aux. lanes) W FPN: 415051-4 60th St. Canal to S.R. 836 (MP 22-26) (widen to 10 lanes + aux. lanes) Year Needed: 2020 I FPN: 429329-1 Bird Rd. Widen Ramps, Improve Intersections (MP 23) Construction Year: 2013 W FPN: 427146-1 Kendall Dr. to Bird Rd. (MP 20-23) (widen to 8 lanes) Construction Year: 2014 I FPN: 427689-1 Kendall Dr. Ramp Intersection Improvements (MP 20) Construction Year: 2014 S FPN: 422418-8 Snapper Creek Service Plaza Reconstruction (MP 19) W FPN: 415488-1 SW 216th St. to Caribbean Dr. (MP 11-12) (widen to 6 lanes) Year Needed: 2025 W FPN: 423372-1 Tallahassee Rd. to SW 216th St. (MP 6-11) (widen to 8 lanes) Year Needed: 2015 W FPN: 423372-1 Campbell Dr. to Biscayne Dr. (MP 2-5) (widen to 6 lanes) Year Needed: 2030 SW 8TH STREET CAMPBELL DR BISCAYNE DR BROWARD 1 SW 117TH AVE. 27 75 Okeechobee Toll Gantry MIAMI- DADE Bird Road South Toll Gantry W FPN: 415051-1 Bird Road North Toll Gantry Kendall Dr. to 60th St. Canal (MP 20-22) (widen to 10 lanes + aux. lanes) Year Needed: 2025 Snapper Creek Service Plaza EUREKA DRIVE SW 216TH ST. Homestead Toll Gantry I New Half-Interchange at Lucy St. (MP 1) (to be funded by others) NW 57TH AVE. Miramar Toll Gantry I FPN: 251938-1 I-75 Interchange Modification (MP 39) W FPN: 423371-1 NW 106th St. to Okeechobee Rd. (MP 34-35) (widen to 10 lanes) Year Needed: 2020 T FPN: 417547-1 Conversion to All-Electronic Tolling, Phase 3 S.R. 836 to Turnpike Mainline, All Plazas (MP 26 - 47) W FPN: 423371-1 S.R. 836 to NW 106th St. (MP 26-34) (widen to 10 lanes + aux. lanes) Year Needed: 2025 I FPN: 429325-1 SW 8th St. Widen, Realign SB Exit Ramp Construction Year: 2013 41 T FPN: 406096-4 Conversion to All-Electronic Tolling, Phase 2 Kendall Dr. to S.R. 836, All Plazas (MP 18 - 25) W FPN: 406096-1 S.R. 874 to Kendall Dr. (MP 18-20) (widen to 8 lanes) Year Needed: 2020 W FPN: 406096-1 N. of Eureka Dr. to S.R. 874 (MP 13-18) (widen to 12 lanes + aux. lanes) Year Needed: 2020 W FPN: 415488-1 Caribbean Dr. to N. of Eureka Dr. (MP 12-13) (widen to 10 lanes) Year Needed: 2015 T FPN: 417544-1 Conversion to All-Electronic Tolling, Phase 1 Campbell Dr. to S.W. 120th St., All Plazas (MP 2-16) W FPN: 423372-1 Biscayne Dr. to Tallahassee Rd. (MP 5-6) (widen to 6 lanes) Year Needed: 2020 FY 2011 - FY 2035 95 Golden Glades Toll Plaza I FPN: 426155-1 S.R. 874 New SB Ramp/Add Lane to SB Mainline (MP 16-18) Construction Year: 2011 195 1 I Golden Glades Interchange Modification (MP 0X) I Interchange T Toll Plaza W S Widening Service Plaza Interchange Project Toll Plaza Turnpike Interchange Service Plaza LEGEND Atlantic Ocean Project Under Construction Funded in 10-year Finance Plan Project in Needs Plan Number of Lanes Exist. + Under Constr. 4 6 8 10 0 1 2 3 4 Miles 21

20<br />

MASTER PLAN ANNUAL UPDATE<br />

this Page Intentionally left blank

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!